| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.2 CrAWARDED | ₹4.2 Cr | AWARDED |
Tender Value
₹4.0 Cr
EMD Value
₹6.0 L
Closing Date
23 Apr 2025, 10:00 pmClosed
Cauvery Neeravari Nigam Limited
Improvements to the bridge constructed for the Tumkur branch canal near Arekere and Comprehensive repairs and reconstruction work of Sluice and canal system of Beguru lake and Construction of escape gate to release water from Tumkur branch channel to Begur lake and Improvements to internal roads in T.Hosahalli, Girigowdanapalya, Salantripalya villages and Improvements to Internal roads of Arakere Village of Kasaba Hobli in Kunigal Taluk.
CNNL/2024-25/OW/WORK_INDENT2547
CNNL/2024-25/OW/WORK_INDENT2547
Open
Other Works
Two Tender Document System(Two Cover)
CNNL HCI Div Hebbur
₹5,000
₹6.0 L
1 Apr 2025
1 Apr 2025
24 Apr 2025
6 Apr 2025
7 Apr 2025
Improvements to the bridge constructed for the Tumkur branch canal near Arekere and Comprehensive repairs and reconstruction work of Sluice and canal system of Beguru lake and Construction of escape gate to release water from Tumkur branch channel to Begur lake and Improvements to internal roads in T.Hosahalli, Girigowdanapalya, Salantripalya villages and Improvements to Internal roads of Arakere Village of Kasaba Hobli in Kunigal Taluk.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceabl...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacte...
Construction of unlined surface drains of average cross sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3...
Providing and placing sand bags consisting of empty cement bags filled with 35 to 40 kg locally available sand for forming ring bund including cost of all materials, labour, plugging joints with selec...
Filling clayey soil between two rows of sand bags placed for forming ring bund including cost of all materials, labour,tamping, plugging leakage points and all other ancillary operations complete.
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant I...
Addendum I: 1 b) 3% for Foundation and plinth of all other types other than isolated footing Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the ...
Supplying, Fitting and Placing TMT Fe 550 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications.Loading and unloading complete with ...
Providing and laying in position Reinforced cement concrete for all Substructures of building , Road works, Water works, Irrigation works & substructure works of bridges upto 3.50 m height. The gran...
Addendum I: 4) CC Drain walls formwork rate above on 2.4.2-(35%) Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete ...
Addendum I :11) 10% above on 2.3.1 for Earth retaining structures Additionalities for Formwork , Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete ...
Addendum I : 3) Foundation, Sub structure of Cross drainages.formwork rate above on 2.4.2 -(5%) Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to t...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. Th...
Addendum I : Bridges 1) Solid Slab Super Structures 20% for Deck slab form work Above 2.5.2- Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the ...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavatio...
Providing and laying 100mm thick pre-cast cover slabs over Road side Drain/ Utility ducts/Rain waterharvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 500 @ 6...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification a)Granular Material
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction.Loading and unload...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on p...
Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a preparedsub base, with 43 grade cement or any other type as perClause 1501.2.2 M20 (Grade), coa...
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete inc...
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading,...
Fabrication, supply, erection, testing and commissioning of sliding type vertical lift gate consisting of skin plate, horizontal and vertical stiffeners, seal seats, sponge rubber seals lifting handle...
Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .