Loading…
Loading…
862 results • Latest
Supply of Man Power of Hemavathy Sub Division Office Turuvekere for the year 2026-27
Supplying of man power for Watch and Ward of Escape cum Regulator and water management at ch.77.765 km of TBC for the year 2026-27
Supplying of man power for the water management of TBC & Distributory No 11A, 12 , 13 & Escape cum regulator coming under the jurisdiction of N0.4 HCSD Gubbi for the year 2026-27.
Removal of jungle & Silt from Ch. 0.00 to 1.50 km of SD-1, ch.0.00 to 2.00 km of SD-2 ,Ch. 0.00 to 1.50 km of SD-3, ch.0.00 to 0.70 km of SD-4 in vulnerable reaches under Dy-20 of D.D.Urs Canal(RESERVED FOR SC)
Removal of jungle & silt from ch. 0.00 to 8.00 km of Dy-19 and its laterals in vulnerable reaches of D.D.Urs Canal
MODERNISATION OF MARUR BRANCH CANAL & ITS DISTRIBUTARIES UNDER HRBC
Re-modelling of Periyapatna Lift Irrigation Canal from ch. 0.000 km to 52.200 km under Harangi Reservoir Project
Removal of silt jungle clearance from Distributory 14 to 50 of Yagachi left bank canal
Consultancy services for conducting studies on Industrial Pollution Assesment through Hybrid Integrated survey, DPR preparation for Industrial Effluent Estimation with Water quality analysis of Arkavathi River and its tributaries
Improvements to DPO canal at ch.5.00km coming under the Hemagiri Anecut Canal
SER18 2026-27DT15-04-2026
ESTIMATE FOR REPLACEMENT OF PUMPS, MOTORS AND OTHER ALLIED ELECTRICAL EQUIPMENTS AT STAGE-1 PUMP HOUSE OF GULUR HEBBUR DWSS
Hiring of machineries for clearing Jungle in Gudda-1 branch, Gudda-2 branch, Bank minor, Manti minor under NHLC and removal of Silt in Gudda-1 branch from ch.0.80 to 3.00 Km and Gudda-2 branch from Ch.0.50 to 2.50 Km, Bank minor Ch.0.60 to Ch.1.00 Km, Manti minor Ch.0.10Km to Ch.1.00Km, Under NHLC for the year 2025-26 (Reserved for SC Contractors)
IMPROVEMENTS TO DISTRIBUTORY NO.22 & 22A OF HEMAVATHY LEFT BANK CANAL
Clearing thick Jungle on tank bund & Removal of Silt in Vulnerable reaches from Ch.0.00 to 5.40 Km of RBC of Hubbe Hunase Tank.
Providing Consultancy services for conducting topographical survey and preparation of DPR for the work Scheme to Lift water from Kunigal Doddakere to fill 39 tanks in Kasaba & Huliyurdurga hobli in Kunigal taluk for drinking water purpose including conducting necessary survey, preparation of LS CS Alignment/Layout Plans Design of structural components Electro-mechanical components and pipeline network after conducting necessary soil investigations and preparations of detailed project report consisting of detailed estimates designs survey maps and Bid documents as per relevant Indian standard codes and applicable rules including cost of Men, Equipment, Vehicles, Plotting/Printing & supply of DPR Design & drawings of Required Numbers of copies in required size till final approval of the DPR designs and Drawing from the competent authority of the Department. complete as per the directions of Engeer-in-Charge.
Construction and Erection of Neeravari Nigama stall (CNNL, VJNL, KNNL & KBJNL) at Dasara Exhibition in Mysuru for the year 2026-27
Repairs to Syphon-Superpassage at Ch. 63.650 km of KRBC in Nanjangud Taluk.
Improvements to Chikkaiyankatte branch canal under virija canal in Srirangapattana taluk, Mandya district
Improvements to canal system for Distributories D2(Ch455m to 2910m) and D3A(Ch 0m to 250m) in selected reaches coming under Tumkur branch canal(Balance Work)
Clearing encroachment and excavation for trench to Valageremenasa tank coming under the atchkat of Hemavathi left bank canal
Improvements to Pickups Canal Coming under the atchkat of Thonnur tank of HLBC and construction of Bridge to halla crossing Hosahalli Kuppahalli Road under D66B of HLBC.
Improvements to Canal, Pos, CD works, Embankment of Thonnur Tank left bank canal.
Construction of Bridge and pickup in Lokapavani valley near Jodihosuru village, Improvements to Road and feeder canal from Lokapavani valley to Somanahalli tank in Nagamangala taluk.
OPERATION AND MAINTAINANCE OF DODDAGUNI DWSS PUMP HOUSE, 11KV/415V TRANSFORMER SUB STATION, RISING MAIN AND DISTRIBUTORY NETWORK TILL DELIVERY TANKS FOR THE YEAR 2026-27
Repair to CD Works of D-8 of TBC for the year 2026-27
Removal of Jungle and Slipped Earth from Ch 5.00 km to 13.00 km of D-11 of TBC
Removal of Jungle and Slipped Earth from ch 2.5 km to 9.00 km of D-9A of TBC
Removal of Silt and Jungle & repairs of Embankment in selected reaches of D-27 and its minors under TBC.
Repairs to sluice gate of Sankenpura ane for the year 2026 27
Removal of jungle & silt from 1st km to 4th km in D-25(A) under TBC
Supply of Man power for Gulur-Hebbur DWSS stage-1 & stage -2 pumphouse for the year 2026-27.
Estimate For Conducting Topographical Survey Work Using Total Station And Preparation of Detailed Estimate For Scheme To Lift Water From Appannappanakatte to Fill Kudukundi Hosakere & Atthikatte In Arasikere Taluk, Hassan District
Improvements of PO Canal at Ch.7.65 Km and 16.55 km of Shimsha Left Bank canal near Adaganahalli and Tubinakere village of Maddur Taluk and Mandya District.
Construction of a storm water drain on inspection path of Kemmannu Nala within the limits of Maddur town.
Improvements to Atchkat road Connecting from Chikkaballi village Main road to 12th Distributory Atchkat land of Keragodu Branch Canal
Improvements to Valagerahalli village and sollapura village under keelara pickup of NMBC
Improvements to 35th Distributory atchkat comes under Gurudevanahalli Village under New Maddur Branch Canal
Improvements to 32 & 32A Distributory atchkat Comes under Borapura and Hunnanadoddi Village under New Maddur Branch Canal
Improvements of tank and Road in Sri Chowdeshwari Temple of Hemmanahalli Village, Maddur Taluk
Running single circuit 11KV, 3 Phase power line on 9.0m pole supprort using RABBIT ACSR Conductor for Dadaga DWS
Removal slipped earth jungle in selected reaches and repairs to badakanapalya minors of D17A distributory coming under TBC
Repairs to embankment in 2nd & 3rd Km of D-21 under TBC
Operation And Maintainance Of Gulur Hebbur DWSS Pump House Stage- 2, 11 Kv/0.433 KV Transformer Sub Station, Raising main and Distributory Network till Delivery Tanks of Stage- 2 for the Year 2026-27
Improvements to Kodihalla of Jaranakatte Tank in Nagamangala Taluk
Removal of Jungle From of Ch 75.00 Km to 100.00 Km of YLBC and Silt in Selected Reaches in Ch 75.00 Km to 100.00 Km of YLBC main canal
Removal of silt and jungle in selected reaches and repairs to C.D structures in Keetur Canal for the year 2026-27
Repairs to damaged Head regulator for KLIS-1 an raising the embankment of intake channel of KLIS- 1
Removal of silt and jungle in selected reaches and repairs to C.D structures in YLBC from ch.100.00m to 33000.00 m for the year 2026-27
Removal of Silt and Jungle in Selected Reaches of Halebeedu Madihalli Lift Scheme for the year 2026-27.