Loading…
Loading…
Updated dates
Tender Value
₹82.7 L
EMD Value
₹2.0 L
Closing Date
8 Jun 2026, 4:00 pm3d left
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Upgradation of road at Sindhu Bhavan, Ayu Takna and Mahabodhi road (Ayu Takna).Under District Plan.
2026_PWD_18920_1
CDL 35 of Leh of 2026-27
Open Tender
Civil Works - Roads
20 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer Construction Division Leh
₹2.0 L
11 May 2026
11 May 2026
9 Jun 2026
11 May 2026
8 Jun 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil | 6,000 | Sqm | 23.39 | ₹1,40,340 | item 01 |
| 2 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR
Value-30 | 225 | Cum | 1,852.15 | ₹4,16,733.75 | item 02 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 150 | Cum | 1,825.12 | ₹2,73,768 | item 03 |
| 4 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.
With rapid setting bitumen emulsion
On W.B.M / W.M.M. @ 0.4kg/sqm | 5,625 | Sqm | 52.3 | ₹2,94,187.5 | item 04 |
| 5 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.
With rapid setting bitumen emulsion On bituminous surface @ 0.25kg/sqm | 5,625 | Sqm | 33.87 | ₹1,90,518.75 | item 05 |
| 6 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of
Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 281.25 | Cum | 11,981.4 | ₹33,69,768.75 | item 06 |
| 7 | 2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of
13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of
hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size
respectively, including a tack coat with hot straight run bitumen, including
consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to
be paid for separately).
With paving Asphalt grade VG - 10 heated and then mixed with solvent at the
rate of 70 grams per kg of asphalt | 5,625 | Sqm | 230.22 | ₹12,94,987.5 | item 07 |
| 8 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. | 5,625 | Sqm | 104.69 | ₹5,88,881.25 | item 08 |
| 9 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up inembankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :
All kinds of soil | 1,636 | Cum | 722.66 | ₹11,82,271.76 | item 09 |
| 10 | Carriage of material by mechanical transport including loading, unloading and stacking complete job a) Earth an average lead of 07kms | 1,636 | Cum | 286.64 | ₹4,68,943.04 | item 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_45206.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid