| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.5 LAccepted-Finance | ₹23.5 L | 1 | Accepted-Finance accepted as L1 bidder |
| 2 | 2₹27.4 L+₹3.9 L (16.5%)Accepted-Finance | ₹27.4 L+₹3.9 L (16.5%) | 2 | Accepted-Finance accepted as L2 bidder |
| Sl No | Description | Qty | Unit | BOSS ENTERPRISES L1 | NAGRAJ ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.01 | Removal of dumped malba/ earth/ R.R.Stone of fallen wall very carefully including sorting out the serviceable material and stacking the proper place for reuse & disposal of mabla / unserviceable material lead up to 100 to 200 mtr away from working site & stacking the properly etc complete( Labour Charge Only) | 981.42 | Cum | 501 ₹4,91,691.42 Lowest | 987.45 ₹9,69,103.18 |
| 1.02 | Taking out / removal of existing bulged / out of plumb R.R. stone Massonarry wall sorting out the serviceable material & stacking the proper place for reuse & disposal the unserviceable material by head load up to lead 200 mtr. etc complete. ( Labour Charge Only) | 169.01 | Cum | 301 ₹50,872.01 Lowest | 1,245 ₹2,10,417.45 |
| 1.03 | Provision for Restoration / under pinning & water tighting the wall by R.R stone massonary with Lime surkhi Mortar 1:1:1 ( 1 Lime :1 B.Surkhi:1 C.Sand)in collecting Stone etc complete. In all respect. ( Labour Charge Only) | 264.42 | Cum | 5,501 ₹14,54,574.42 | 3,850.31 ₹10,18,098.97 Lowest |
| 1.04 | Recess pointing the R.R. Stone masonry wall in lime surkhi mortar 1:1:1 (1 lime : 1 surkhi : 1 C. Sand) with coloring pigment for matching with the original texture including raking cleaning and washing at the joints out etc. complete. ( Labour Charge Only) | 716.4 | Sqm | 301 ₹2,15,636.4 Lowest | 401.76 ₹2,87,820.86 |
| 1.05 | Provision for earth work in Cutting / levelling Avg. Depth (0.30 to 0.45 ) the surface and Laying in low level area and competing for Proper drainage to rain water of Complex etc complete. ( Labour Charge Only) | 2,086.5 | Sqm | 51 ₹1,06,411.5 Lowest | 98.25 ₹2,04,998.63 |
| 1.06 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. ( Labour Charge Only) | 2,700 | Sqm | 11 ₹29,700 Lowest | 16.66 ₹44,982 |
Tender Value
₹29.8 L
EMD Value
₹74,387
Closing Date
26 Feb 2026, 4:00 pmClosed
SA, ASI, Rajkot
Office of SA, ASI, Old Collectorate Compound, Rajkot Circke, Rajkot
Conservation works at Gadhi fortress (Labour only)
2026_ASI_898707_1
3C/1(17(B))/RJT/2025-26/C
Open Tender
Civil Works
Works
90 days
Gadhi fortress, Dwarka
as per tender criteria
2 documents required · 2 mandatory
₹0
₹74,387
Yes
10 Apr 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
16 Feb 2026 - 26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Removal of dumped malba/ earth/ R.R.Stone of fallen wall very carefully including sorting out the serviceable material and stacking the proper place for reuse & disposal of mabla / unserviceable material lead up to 100 to 200 mtr away from working site & stacking the properly etc complete( Labour Charge Only) | 981.42 | Cum | - | - |
| 1.02 | Taking out / removal of existing bulged / out of plumb R.R. stone Massonarry wall sorting out the serviceable material & stacking the proper place for reuse & disposal the unserviceable material by head load up to lead 200 mtr. etc complete. ( Labour Charge Only) | 169.01 | Cum | - | - |
| 1.03 | Provision for Restoration / under pinning & water tighting the wall by R.R stone massonary with Lime surkhi Mortar 1:1:1 ( 1 Lime :1 B.Surkhi:1 C.Sand)in collecting Stone etc complete. In all respect. ( Labour Charge Only) | 264.42 | Cum | - | - |
| 1.04 | Recess pointing the R.R. Stone masonry wall in lime surkhi mortar 1:1:1 (1 lime : 1 surkhi : 1 C. Sand) with coloring pigment for matching with the original texture including raking cleaning and washing at the joints out etc. complete. ( Labour Charge Only) | 716.4 | Sqm | - | - |
| 1.05 | Provision for earth work in Cutting / levelling Avg. Depth (0.30 to 0.45 ) the surface and Laying in low level area and competing for Proper drainage to rain water of Complex etc complete. ( Labour Charge Only) | 2,086.5 | Sqm | - | - |
| 1.06 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. ( Labour Charge Only) | 2,700 | Sqm | - | - |
stage.html
html • 0.03 MB
techsummary_944644.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.84 MB
Technicalcriteria.pdf
Tender Documents • 0.84 MB
BOQ_944644.xls
BOQ • 0.25 MB
completeNITsigend.pdf
Tender Documents • 17.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .