| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-AOC EDAMCHERYKUNNU HOUSE CHENGALA PO KASARGOD | KANNUR | KERALA | 670511 | 1 | Accepted-AOC Lowest | |
| 2 | 2₹8.4 L+₹55,910.98 (7.09%)Rejected-AOC | 2 | Rejected-AOC second |
| Sl No | Description | Qty | Unit | MOHAMMED KUNHI C A L1 | NOUFAL ALAMPADY L2 |
|---|---|---|---|---|---|
| 1.00Main canal Ch:10/050 Km to 19/950 Km | |||||
| 1.00 | OD1138/2026-2027:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 36,910 | sqm | 11.57 ₹4,27,048.7 Lowest | 12.39 ₹4,57,314.9 |
| 1.00 | OD1139/2026-2027:Engaging hydraulic excavator including all cost of hire charge, driver, fuel and lubricants for removing debris, weeds and other major obstructions from canal bed prior to water distribution and including disposal of waste materials by mechanical means atleast 1m away from the side wall or as directed by Engineer-in-charge. | 160 | hour | 1,595.27 ₹2,55,243.2 Lowest | 1,708.51 ₹2,73,361.6 |
| 1.00 | OD2654/2026-2027:Engaging man mazdoor for various works to execute the work as per the directions of
department officers at site | 96 | each | 958.92 ₹92,056.32 Lowest | 1,026.99 ₹98,591.04 |
| 1.00 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 4.5 | cum | 646.31 ₹2,908.4 Lowest | 692.19 ₹3,114.86 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 334.64 ₹1,673.2 Lowest | 358.39 ₹1,791.95 |
| 1.01 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 5 | each | 598.99 ₹2,994.95 Lowest | 641.51 ₹3,207.55 |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 814.41 ₹4,072.05 Lowest | 872.22 ₹4,361.1 |
| 1.01 | OD2731/2026-2027:Supplying and stacking of earth filled empty cement bags | 20 | 1 nos | 116.17 ₹2,323.4 Lowest | 124.41 ₹2,488.2 |
Tender Value
₹8.9 L
EMD Value
₹22,244
Closing Date
22 Sept 2026, 11:00 amClosed
Assistant Executive Engineer
Head Works Sub Division Malampuzha Irrigation Office Malampuzha
This work includes clearing grass and jungle on the canal and canal bunds and desilting of canal system by using hitachi. The estimate has been prepared based on DSOR 2021 with cost index of 144.45. The amount of estimate comes to 10.50lakhs
2026_Irrig_869213_1
IRR/PI/TR/2242/2026_5_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
Pudhupariyaram akathethara
Please refer Tender Document
4 documents required · 4 mandatory
₹1,965
Yes
₹22,244
Yes
1 Oct 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Main canal Ch:10/050 Km to 19/950 Km | |||||
| 1.001 | OD1138/2026-2027:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 36,910 | sqm | - | - |
| 1.002 | OD1139/2026-2027:Engaging hydraulic excavator including all cost of hire charge, driver, fuel and lubricants for removing debris, weeds and other major obstructions from canal bed prior to water distribution and including disposal of waste materials by mechanical means atleast 1m away from the side wall or as directed by Engineer-in-charge. | 160 | hour | - | - |
| 1.003 | OD2654/2026-2027:Engaging man mazdoor for various works to execute the work as per the directions of
department officers at site | 96 | each | - | - |
| 1.004 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 4.5 | cum | - | - |
| 1.005 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | - | - |
| 1.006 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 5 | each | - | - |
| 1.007 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | - | - |
| 1.008 | OD2731/2026-2027:Supplying and stacking of earth filled empty cement bags | 20 | 1 nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1472386.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1472386.xls
BOQ • 0.23 MB
BD.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .