| 1 | L1₹1.3 CrAdmitted-Finance VILLAGE PO AND TEHSIL DEHRA DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | L1 | Admitted-Finance | |
| 2 | L2₹1.4 Cr+₹3.7 L (2.78%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.4 Cr+₹9.2 L (6.87%)Admitted-Finance V P O AND TEHSIL DEHRA DISTRICT KANGRA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 175013 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SARVAGYA GOVT CONTRACTOR L3 | ABHINAV DHIMAN L2 | aman sood L1 |
|---|---|---|---|---|---|---|
| 1.00 | EvoIving planning, hydraulic, Kinetic & structural design, construction installation, testing, commissioning, regarding Rejuvenation and Restoration of the pond at Nehran Pukhar to recharge the ground water source for LWSS Kasba Barhoon and LWSS Har Pukhar based on Natural Treatment System with State-of-Art Technology, including Removing of weeds and construction of water conservation,Construction of RCC water retaining structure for
ensuring the long-term stability and water-tightness of rejuvenated ponds, Construction of Outlet arragement toPond for controlled realease excess water, Construction of Catchpit cum Silt Removal System at inlet, Construction of Wetlands, Development of Ripariar Zone, Construction of Floating Wetlands, Construction of Cascading and Aeration system, Supply and Instllation of Fountains, supply of waterfouls, Construction of Peripheral Walkway to Provide Safe Access, Inspection Route, and Recreational Space around the Pond, Inttlation of M.S Railing for Safe Public Access Around the Pond, Construction of Bench for sitting inside the Pond, Providing Scour arrangment for catchpit, | 1 | Job | 1,43,20,577 ₹1,43,20,577 | 1,37,71,954.55 ₹1,37,71,954.55 | 1,34,00,000 ₹1,34,00,000 Lowest |
| 2.00The Rejuvenatec and Restored existing pond should be capable for polishing of treated effluent generated from the natural treatment syster (constructed wetland) for the reuse (other than potable) as per the parameters described in CPHEEO manual with latest amendments. The scope of the work also includes the cost of supporting structure for stability of proposed structures wherever. The desigm methodology should be capable to meet minimum dissolved oxygen level (4 ppm) for survival of aquatic life and supported with design kinetics based on CPHEEO manual latest authentic references duly vetted from IIT/NIT/PEC and all the process design constants and kinetic equation usec should be supported with authentic references Refer chapter vi (a) to (c) for basic data, scope of work Technical specification & Terms & conditions. (As per Data Sheet No.1 to 14 attached). | ||||||
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
22 Sept 2026, 11:00 amClosed
EE
Jal Shakti Division Dehra
Rejuvenation and Restoration of the Pond at Nehran Pukhar to recharge the ground water source for LWSS Kasba Barhoon based on natural treatment with the state of art technology
2026_HPIPH_143276_1
DHR-KNG02-728
Open Tender
Civil Works
Lump-sum
180 days
Dehra
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
EE Dehra
₹2.2 L
30 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EvoIving planning, hydraulic, Kinetic & structural design, construction installation, testing, commissioning, regarding Rejuvenation and Restoration of the pond at Nehran Pukhar to recharge the ground water source for LWSS Kasba Barhoon and LWSS Har Pukhar based on Natural Treatment System with State-of-Art Technology, including Removing of weeds and construction of water conservation,Construction of RCC water retaining structure for
ensuring the long-term stability and water-tightness of rejuvenated ponds, Construction of Outlet arragement toPond for controlled realease excess water, Construction of Catchpit cum Silt Removal System at inlet, Construction of Wetlands, Development of Ripariar Zone, Construction of Floating Wetlands, Construction of Cascading and Aeration system, Supply and Instllation of Fountains, supply of waterfouls, Construction of Peripheral Walkway to Provide Safe Access, Inspection Route, and Recreational Space around the Pond, Inttlation of M.S Railing for Safe Public Access Around the Pond, Construction of Bench for sitting inside the Pond, Providing Scour arrangment for catchpit, | 1 | Job | - | - |
| 2 | The Rejuvenatec and Restored existing pond should be capable for polishing of treated effluent generated from the natural treatment syster (constructed wetland) for the reuse (other than potable) as per the parameters described in CPHEEO manual with latest amendments. The scope of the work also includes the cost of supporting structure for stability of proposed structures wherever. The desigm methodology should be capable to meet minimum dissolved oxygen level (4 ppm) for survival of aquatic life and supported with design kinetics based on CPHEEO manual latest authentic references duly vetted from IIT/NIT/PEC and all the process design constants and kinetic equation usec should be supported with authentic references Refer chapter vi (a) to (c) for basic data, scope of work Technical specification & Terms & conditions. (As per Data Sheet No.1 to 14 attached). | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Form12.pdf
Tender Documents • 0.83 MB
Datasheet.pdf
Tender Documents • 0.87 MB
Termsandconditons.pdf
Tender Documents • 0.18 MB
BOQ_212856.xls
BOQ • 0.27 MB
Form6.pdf
Tender Documents • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .