Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1 Cr
Closing Date
27 Aug 2026, 5:00 pm
A R CHITRANSHI
IHMCL HQ
Request for Proposal (RFP) for Selection of Service Provider for Upgradation of Toll Monitoring and Control Centre (TMCC) Application including Development Operations and Maintenance of TMCC 2.0
2026_NHAI_286175_1
IHMCL/TMCC 2 0/2026
Open Tender
Miscellaneous Services
Item Rate
2920 days
IHMCL HQ
Please refer Tender documents.
7 documents required · 7 mandatory
₹25,000
IHMCL
₹1 Cr
31 Jul 2026
31 Jul 2026
28 Aug 2026
31 Jul 2026
27 Aug 2026
31 Jul 2026
Appendix A-Form F-1: Format for Financial Bid Submission
Name of Bidder:
FINANCIAL BID FORMAT
Sr. No. Item UOM Qty Unit Rate Total Amount Remarks
A Software Take-over and Design & Development Cost
A1 Take-over of existing TMCC Application along with source code on “As-Is basis” functional at all Live plazas and with all existing API Integrations with external system such as NPCI, Banks (for Annual Pass), VAHAN, NATGRID, BISAG-N MEITY, MoRTH Dashboard, NHAI Datalake, GSTN, and E-Detection portals as per RFP. LS 1
A2 Design, Development of TMCC 2.0 with all modules LS 1
A3 Setting up of Control Room IT Infrastructure at IHMCL Office Premises or any identified location by IHMCL LS 1
Sub-total for Software Take-over and Design & Development Cost (A)
B Plaza Onboarding Cost on TMCC 2.0 and Integration with External Agencies
B1 Pilot deployment of TMCC 2.0 application at MLFF projects and Go-Live Plazas 17 Refer Schedule A for list of plazas.
B2 Integration & Deployment of TMCC 2.0 at fee plazas (ETC plazas and MLFF Plazas) throughout the Contract Period including all existing NH fee plazas and new fee plazas during O&M period (Lumpsum quantity) Plazas 2000 Payments to be released pro-rata based on the nuber of plazas on-boarded on TMCC 2.0
B3 One Time Sync/ Async Integration Cost with any new External Application as per RFP requirement Nos 5 Payments shall be released based on Successful integration with each new external application as per Clause 2.5 of Schedule B
Sub-total for Plaza Onboarding Cost on TMCC 2.0 and Integration with External Agencies (B)
C Operations & Maintenance Cost
Sl. # Item UOM Indicative Qty Unit Rate for O&M (Quarterly Rate) Total Amount (₹) Remarks
C1 Year 1 - Pro-rata Quarterly O&M charges for fee plazas operational on TMCC 1.0 (Lumpsum quantity) Quarter 4 (i)Shall be released only after takign over of all fee plazas
C2 Year 2-7 - Pro-rata Quarterly O&M charges for fee plazas operational on TMCC 2.0 (Lumpsum quantity) Per Plaza 2000 (i) Quarterly Unit Rate to be quoted for each plaza for 24 quarters. (ii) Cost for O&M for 24 quarters for the indicative Qty of fee plazas mentioned under UOM.
Sl. # Item UOM Indicative Qty Unit Rate for O&M (Monthly Man-month Rate) Total Amount (₹) Remarks
C4 Manpower cost during O&M phase
C4.1 Project Manager (1 resource) Man-Months
C4.2 Data Analytics & AI Specialist (1 resource) Man-Months
C4.3 TMCC Operators (5 resources) Man-Months
Sub-Total for O&M Cost (C )
TOTAL PROJECT COST (D)
1 The Bidder shall ensure strict adherence to the prescribed cost distribution limits, as below: (i) Sub-Total (C) for O&M cost shall not less than 50% of the Total Project Cost (D); and (ii) Sub-Total (A) for Software Take-over and Design & Development Cost (A) shall not exceed 20% of the Total Project Cost (D). (iii) Quarterly Unit Rate for O&M of TMCC 1.0 per plaza should NOT be more than 50% of Quarterly Unit Rate of TMCC 2.0 per plaza. In the event of any deviation or non-compliance with the above stipulated thresholds, the Financial Bid shall be treated as non-responsive and shall be rejected summarily, without any further evaluation or clarification. No post-submission rectification in this regard shall be permitted.
2 The quantities of fee plazas indicated in the Financial Bid is indicative, and have been provided for the limited purpose of bid evaluation and benchmarking. The actual number of fee plazas in O&M phase to be onboarded during the project tenure may vary, based on actual fee plaza operational. Payment shall be made on a pro-rata basis, strictly corresponding to the actual number of fee plaza successfully onboarded and opertional on TMCC 1.0/ TMCC 2.0 in the quarter.
Section Component Milestone Payment % Remarks Timeline (Months) Amount
A1 Software Development & Pilot Deployment at any one identified projects including Supply and installation of IT infra. Pilot Go-Live 0.9 3
A2 Project Onboarding (Per Stretch) on Pro-rata basis. Initiation & Complete Integration 1 Post approval of Project Incharge NHAI/IHMCL
1 Central Software & IT Infra O&M Quarterly Payment SLA Linked, distributed in 20 equal quarters 66
Per stretch O&M Quarterly (Post Onboarding) SLA Linked, distributed in 20 equal quarters 66
Manpower Quarterly Payment (Post-Deployment) Attendance Linked 66
Unit Qty Unit rate Amount
Real-time health monitoring software LS 1 15000000
Data Analytics Software LS 1 5000000
Unit Qty Unit rate Amount
Workstation No. 8 120000
LED Screen 52" No. 2 70000
Furniture LS 1 200000
Section Component Milestone Payment % Remarks Timeline (Months) Amount
1 Central Software Development SRS Approval 0.2 1
Software Development Beta Deployment 0.2 3
IT Infra Supply & Installation 1 4
Software Development Go-Live & UAT 0.4 5
Software Development 1 Month Stable Operation 0.2 6
Project Onboarding (Per Stretch) on Pro-rata basis. Initiation & Complete Integration 1 Post approval of Project Incharge NHAI/IHMCL
1 Central Software & IT Infra O&M Quarterly Payment SLA Linked, distributed in 20 equal quarters 66
Per stretch O&M Quarterly (Post Onboarding) SLA Linked, distributed in 20 equal quarters 66
Manpower Quarterly Payment (Post-Deployment) Attendance Linked 66
C Advance & Retention
1 Mobilization Advance Against BG
2 Retention Against PBG
Sr.No. Zone States
1 East Zone (West Bengal, Odisha, Bihar, Jharkhand, North-East States), 5
West Zone (Maharashtra, Gujarat, Goa), and 3
North Zone (Delhi, Haryana, Rajasthan, HP, J&K, Punjab), 6
South Zone (Tamil Nadu, Karnataka, Kerala, Andhra Pradesh, Telangana), 5
Central Zone (Madhya Pradesh, Chhattisgarh, Uttar Pradesh, Uttarakhand). 4
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.44 MB
Financial Bid Format TMCC 2.0 v2.xls
Tender Documents • 0.06 MB
FinalRFP.pdf
Tender Documents • 14.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].