Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical AS PER TECHNICAL EVALUATION |
| 2 | Accepted-Technical | Accepted-Technical AS PER TECHNICAL EVALUATION |
| 3 | Accepted-Technical | Accepted-Technical AS PER TECHNICAL EVALUATION |
| 4 | Accepted-Technical | Accepted-Technical AS PER TECHNICAL EVALUATION |
Tender Value
₹17.4 L
EMD Value
₹35,000
Closing Date
24 Oct 2025, 5:00 pmClosed
ASHISH RANJAN
DGM PCS COMPLEX
Conducting Hydrographic survey of River Jhelum from Ningli Village Sopore to Tail end of Lower Jhelum Hydro Project (LJHP) in respect of Tulbul Navigation Lock Project Baramulla.
2025_NHPC_882078_1
NH/UPS/PCS/C-124/NIQ-105/369 Dated 17/10/2025
Limited
Civil Works
Works
45 days
GINGLE BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹35,000
Yes
12 Nov 2025
18 Oct 2025
29 Oct 2025
18 Oct 2025
24 Oct 2025
18 Oct 2025
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
TDFINAL.pdf
Tender Documents • 2.85 MB
BOQ_927104.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .