Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-Finance | ₹23.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹24.4 LRejected-Finance 815 790 RABINDRAPALLY HIJLI KHARAGPUR WEST MEDINIPUR WEST BENGAL 721306 | MEDINIPUR WEST | WEST BENGAL | 721306 | ₹24.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹25.4 LRejected-Finance WEST BENGAL WEST BENGAL | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹25.4 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | PRITAM ENTERPRISE L2 | SAHA CATERER ELECTRIC AND DECORATORS L1 | M/S JOY MONDAL L3 |
|---|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | 8,000 | Sq.ft | 30 ₹2.4 L | 29.68 ₹2.4 L | 35 ₹2.8 L |
| 2.00 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0" min. ht.) Roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area) | 15,500 | Sq.ft | 40 ₹6.2 L | 38 ₹5.9 L | 45 ₹7.0 L |
| 3.00 | Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete. | 2,500 | Sq.ft | 16 ₹40,000 | 14.84 ₹37,100 | 15.5 ₹38,750 |
| 4.00 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). | 8,500 | Sq.ft | 15 ₹1.3 L | 12.19 ₹1.0 L | 12.5 ₹1.1 L |
| 5.00 | Hire and labour charges for bamboo barricading with sal post of 4'' dia @ 4' c/c including necessary..3row | 750 | Sq.ft | 50 ₹37,500 | 47.7 ₹35,775 | 50 ₹37,500 |
| 6.00 | Making of wooden platform upto 1'0" ht. Including supply of wooden planks and necessary frame works with post as per direction (Restricted item). | 12,193 | Sq.ft | 50 ₹6.1 L | 48.76 ₹5.9 L | 50 ₹6.1 L |
| 7.00 | Supplyng and laying of Tarpoulinr as per direction | 4,200 | Sq.ft | 10 ₹42,000 | 8.48 ₹35,616 | 10 ₹42,000 |
| 8.00 | Supplying and laying of coir Mat | 1 | Sq.ft | 8 ₹8 | 6.89 ₹6.89 | 10 ₹10 |
| 9.00 | Supplying and laying of Carpet (good quality) as per direction. | 12,999 | Sq.ft | 17 ₹2.2 L | 15.9 ₹2.1 L | 17 ₹2.2 L |
| 10.00 | Supplying fitting fixing in position of door and window curtain | 15 | Sq.ft | 185 ₹2,775 | 180.2 ₹2,703 | 190 ₹2,850 |
Tender Value
Refer Docs
EMD Value
₹46,570
Closing Date
8 Apr 2026, 1:00 pmClosed
EXECUTIVE OFFICER BARUIPUR PANCHAYAT SAMITY
PIYALI TOWN, FULTALA, BARUIPUR, SOUTH 24 PGS, PIN 743387
Construction of improvised Structure of supplying work of DC and CC Venue of Gobindapur Ratneswar High School icw Assembly General Election 2006
2026_ZPHD_1023427_2
16/BDB/286 - E16/25 - 26
Open Tender
Electrical Work/ Equipment
30 days
HARIHARPUR, Baruipur PS
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,350
₹46,570
16 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | - | Sq.ft | 29.68 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0" min. ht.) Roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area) | - | Sq.ft | 38 | - | BI01010001010000000000000515BI0100001114 |
| 3 | Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete. | - | Sq.ft | 14.84 | - | BI01010001010000000000000515BI0100001115 |
| 4 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). | - | Sq.ft | 12.19 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Hire and labour charges for bamboo barricading with sal post of 4'' dia @ 4' c/c including necessary..3row | - | Sq.ft | 47.7 | - | BI01010001010000000000000515BI0100001117 |
| 6 | Making of wooden platform upto 1'0" ht. Including supply of wooden planks and necessary frame works with post as per direction (Restricted item). | - | Sq.ft | 48.76 | - | BI01010001010000000000000515BI0100001118 |
| 7 | Supplyng and laying of Tarpoulinr as per direction | - | Sq.ft | 8.48 | - | BI01010001010000000000000515BI0100001119 |
| 8 | Supplying and laying of coir Mat | - | Sq.ft | 6.89 | - | BI01010001010000000000000515BI0100001120 |
| 9 | Supplying and laying of Carpet (good quality) as per direction. | - | Sq.ft | 15.9 | - | BI01010001010000000000000515BI0100001121 |
| 10 | Supplying fitting fixing in position of door and window curtain | - | Sq.ft | 180.2 | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
technical_2515497.pdf
techsummary_2515497.pdf
finance_2515497.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_2515497.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid