Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹8.4 L+₹50,252.39 (6.38%)Admitted-Fee/PreQual/Technical/Finance THUSHARA BHAVAN RAMANKERY PO ALAPPUZHA ALAPPUZHA | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | FRANCIS THOMAS L1 | SANDEEP T L2 |
|---|---|---|---|---|---|
| 1.00FOOT BRIDGE MAINTENANCE | |||||
| 1.00 | OD354688/2025-2026:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 10 | metre | 1,632.49 ₹16,324.9 Lowest | 1,736.69 ₹17,366.9 |
| 1.00 | OD361845/2025-2026:Bailing out water using 5HP Pump - Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel , lubricaton oil and other stores, pay of staff etc complete | 70 | Day | 428.48 ₹29,993.6 Lowest | 455.83 ₹31,908.1 |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 8.45 | cum | 1,125.49 ₹9,510.39 Lowest | 1,197.33 ₹10,117.44 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 25.13 | cum | 242.17 ₹6,086.46 Lowest | 257.63 ₹6,475.01 |
| 1.00 | OD339599/2024-2025:Coconut Pile-Supplying and stacking well matured straight coconut post for driving through
various strata below bed level including cost conveyance, labour charges etc complete | 240 | metre | 134.59 ₹32,301.6 Lowest | 143.18 ₹34,363.2 |
| 1.01 | OD339570/2024-2025:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all
hire charges and lbour for fixing, staging platform and all other necessary for pile driving down
after pointing the bottom end | 240 | 1 meter | 240.93 ₹57,823.2 Lowest | 256.31 ₹61,514.4 |
| 1.01 | OD339601/2024-2025:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental
officers at site | 5.92 | cum | 1,612.93 ₹9,540.48 Lowest | 1,715.88 ₹10,149.43 |
| 1.01 | OD339604/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 2.54 | cum | 3,753.85 ₹9,516.01 Lowest | 3,993.46 ₹10,123.42 |
| 1.01 | OD339602/2024-2025:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site | 8.21 | cum | 2,789.16 ₹22,896.21 Lowest | 2,967.19 ₹24,357.66 |
Tender Value
₹8.4 L
EMD Value
₹20,940
Closing Date
17 Sept 2026, 3:30 pmClosed
AE
LSGD EW Edathua GP
RENOVATION OF CHENNAMKARA BRIDGE IN WARD 13 OF EDATHUA GP
2026_LSGD_868793_1
LSGD/CELSGD/FL/117023/2024
Open Tender
Civil Works - Bridges
Item Rate
365 days
Edathua
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,850
Yes
₹20,940
Yes
22 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FOOT BRIDGE MAINTENANCE | |||||
| 1.001 | OD354688/2025-2026:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 10 | metre | - | - |
| 1.002 | OD361845/2025-2026:Bailing out water using 5HP Pump - Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel , lubricaton oil and other stores, pay of staff etc complete | 70 | Day | - | - |
| 1.003 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 8.45 | cum | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 25.13 | cum | - | - |
| 1.005 | OD339599/2024-2025:Coconut Pile-Supplying and stacking well matured straight coconut post for driving through
various strata below bed level including cost conveyance, labour charges etc complete | 240 | metre | - | - |
| 1.006 | OD339570/2024-2025:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all
hire charges and lbour for fixing, staging platform and all other necessary for pile driving down
after pointing the bottom end | 240 | 1 meter | - | - |
| 1.007 | OD339601/2024-2025:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental
officers at site | 5.92 | cum | - | - |
| 1.008 | OD339604/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 2.54 | cum | - | - |
| 1.009 | OD339602/2024-2025:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site | 8.21 | cum | - | - |
stage.html
html • 0.02 MB
finance_1471521.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1471521.xls
BOQ • 0.31 MB
Chennamkaraviewsbd.pdf
Tender Documents • 2.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .