| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77,452.82Accepted-Finance BASTACOLLA NEAR ATTA CHAKKI DHANBAD DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹77,452.82 | L1 | Accepted-Finance Awarded |
| 2 | L2₹79,621.50+₹2,168.68 (2.80%)Rejected-Finance 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹79,621.50+₹2,168.68 (2.80%) | L2 | Rejected-Finance Due to high rate quoted |
| 3 | L3₹81,325.46+₹3,872.64 (5.00%)Rejected-Finance AT JHARIA THANA ROAD JHARIA DHANBAD JHARKHAND 828111 | JHARIA | DHANBAD | JHARKHAND | 828111 | ₹81,325.46+₹3,872.64 (5.00%) | L3 | Rejected-Finance Due to high rate quoted |
Tender Value
₹77,453
EMD Value
₹1,000
Closing Date
2 Mar 2026, 11:00 amClosed
Area manager(EnM), Kusunda Area
Area manager(EnM), Kusunda Area
Dismantling and redrawing of 440V O/h line for the purpose of power supply to CCTV cameras, roto pump, lighting circuit and shifting of cables etc. to new substation at KDS II Siding under GKKC
2026_BCCL_353684_1
BCCL/AVI/EnM/2025-26/219
Open Tender
Electrical and Maintenance Works
Percentage
7 days
GKKC
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
4 Apr 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
2 Mar 2026
20 Feb 2026
Dismantling Of Tubular Pole (12.42/pg-40)
Dismantling Of Al Rabbit Conductors 385 mtrs *5 wire = 1925 mtrs (12.40 pg-40)
Dismantling Angle Bracket(11 nos) with Insulator (25 nos) (12.02/pg-40)
Dismantling of PVC Al cable 35 Sq. mm with laying cable Connection (market rate)
Dismantling Busbar with all cable Connection including loading and unloading new substation
Transporting of Tubular pole old substation to new substation (Area rate)
Erection of Tubular pole (11.3.2/pg-36)
Drawing and redrawing Al Rabbit Conductor with Jumper Connection old Substation and new substation as per instruction colliery engineer KDS-ii 385*5=1925 mtrs(12.21/pg- 39)
Fixing Angle bracket in the OH line (13.6/pg- 41)
Supply of Clamp (cpwd-12)
Dismantling and 185 Sq mm Power Cable copper with transporting old Substation to new substation with laying hanging connection the OH
Supply and fixing of stay set with complete jamming
new making for cable jumper connection including lighting connection (Market Rate)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_366494.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .