Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance | ₹5.9 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹6.1 LAccepted-Finance | ₹6.1 L | L2 | Accepted-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | SIVADAS C L2 | BIJU. K L1 |
|---|---|---|---|---|---|
| 1.00Renovation of pond | |||||
| 1.01 | 2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 5 | sqm | 9.27 ₹46.35 | 8.93 ₹44.66 |
| 1.02 | 60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 56 | hour | 455.83 ₹25,526.48 | 439.16 ₹24,593.06 |
| 1.03 | od22534/2020_2021/IA : Earth work excavation in all class of soil as per item No 2.6.1, the earth conveyed from site by contractor. | 13.56 | cum | 300 ₹4,068.6 | 289.03 ₹3,919.82 |
| 1.04 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 99.67 | cum | 3,993.46 ₹3,98,024.16 | 3,847.43 ₹3,83,469.67 |
| 1.06 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 39.82 | sqm | 386.16 ₹15,375.73 | 372.04 ₹14,813.49 |
| 1.07 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 17.24 | cum | 9,235.97 ₹1,59,237.36 | 8,898.24 ₹1,53,414.55 |
| 1.09 | od22758/2020_2021/IA : 110mm PVC pipe 6kg/m2 for out let pipe | 10 | metre | 720.01 ₹7,200.1 | 693.68 ₹6,936.81 |
Tender Value
₹4.0 L
EMD Value
₹10,100
Closing Date
23 Sept 2025, 4:30 pmClosed
Executive Engineer, MI Division, Palakkad
Office of Executive Engineer, MI Division,Palakkad
Cauvery basin Projects- Kabani sub basin- MI Projects in Cauvery basin- Improvements to Ayyappankulam at Kulukkapara in Kozhinjampara Panchayath in Palakkad District.
2025_Irrig_797226_1
D2/2019/7224/IA Vol II (Re arranged work as per DSR 2016)
Open Tender
Civil Works - Others
240 days
Ayyappankulam at Kulukkapara in Kozhinjampara Panc
Please refer Tender documents.
7 documents required · 7 mandatory
₹890
Yes
₹10,100
Yes
24 Jun 2026
15 Sept 2025
26 Sept 2025
15 Sept 2025
23 Sept 2025
15 Sept 2025
15 Sept 2025 - 17 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1320414.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid