Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹14,000
Closing Date
24 May 2021, 3:00 pmClosed
Deputy Vice President (HCD)
HLL Lifecare Limited, HCD Projects, HLL Bhavan, 6th Floor, Golden Jubilee Block, Poojapura, Thiruvananthapuram - 695012, Kerala, Ph 0471-2775651
Supply, Installation, Testing and Commissioning of Medical Gas Pipeline Systems (MGPS) at Taluk Hospital, Sasthamcotta, Kollam
2021_HLL_421624_1
HLL/CHO/HCD/MGPS/ICU-STA/21-22
Open Tender
Civil Works - Others
Item Rate
30 days
Taluk Hospital, Sasthamcotta
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,800
Yes
₹14,000
Yes
28 Jun 2021
21 Apr 2021
25 May 2021
21 Apr 2021
24 May 2021
21 Apr 2021
Amount
MGP- System
AREA VALVE SERVICE UNIT (AVSU) - 4 gas<br>SITC of 4 gas AVSU as required and as specified under the guidelines laid for Medical gas system, as approved by Engineer HLL
22mm OD X .9mm THIICK Cu PIPE<br>SITC of copper pipes manufactured from phosphorous deoxidised non-arsenical copper of grade CW024A (Cu-DHP), manufactured EN 13348:2008 to metric outside diameters and having mechanical properties, pipes shall be of R250 (half hard)temper. Pipes shall be degreased suitable for oxygen use and cleanliness is to be maintained by filling each pipe with dry, clean, oil and oxygen free nitrogen, fitting suitable end caps and protectively wrapping. Solid drawn, seamless, deoxidised, non- arsenical, half hard, tempered and degreased copper tubes manufactured to metric outside diameters and should have mechanical properties in accordance with HTM 02-01 and conforming to EN13348:2008.The pipes should also be accompanied with manufacturer’s test certificate for the physical and chemical composition. Copper Fittings should be as per HTM 02-01. All plastic saddles should have brass screws. as per the specifications and requirements, painting of the pipes installed as per color code for medical gas system is also under the scope of contractor<br>20 mm
15mm OD X .9mm THICK Cu PIPE<br>SITC of copper pipes manufactured from phosphorous deoxidised non-arsenical copper of grade CW024A (Cu-DHP), manufactured EN 13348:2008 to metric outside diameters and having mechanical properties, pipes shall be of R250 (half hard)temper. Pipes shall be degreased suitable for oxygen use and cleanliness is to be maintained by filling each pipe with dry, clean, oil and oxygen free nitrogen, fitting suitable end caps and protectively wrapping. Solid drawn, seamless, deoxidised, non- arsenical, half hard, tempered and degreased copper tubes manufactured to metric outside diameters and should have mechanical properties in accordance with HTM 02-01 and conforming to EN13348:2008.The pipes should also be accompanied with manufacturer’s test certificate for the physical and chemical composition. Copper Fittings should be as per HTM 02-01. All plastic saddles should have brass screws. as per the specifications and requirements, painting of the pipes installed as per color code for medical gas system is also under the scope of contractor<br>20 mm
12mm OD X .7mm THICK Cu PIPE<br>SITC of copper pipes manufactured from phosphorous deoxidised non-arsenical copper of grade CW024A (Cu-DHP), manufactured EN 13348:2008 to metric outside diameters and having mechanical properties, pipes shall be of R250 (half hard)temper. Pipes shall be degreased suitable for oxygen use and cleanliness is to be maintained by filling each pipe with dry, clean, oil and oxygen free nitrogen, fitting suitable end caps and protectively wrapping. Solid drawn, seamless, deoxidised, non- arsenical, half hard, tempered and degreased copper tubes manufactured to metric outside diameters and should have mechanical properties in accordance with HTM 02-01 and conforming to EN13348:2008.The pipes should also be accompanied with manufacturer’s test certificate for the physical and chemical composition. Copper Fittings should be as per HTM 02-01. All plastic saddles should have brass screws. as per the specifications and requirements, painting of the pipes installed as per color code for medical gas system is also under the scope of contractor<br>20 mm
22 mm BALL VALVE (MGPS)<br>SITC of Line Valves for use in plant rooms and to facilitate the isolation of areas or areas where area zone valve are unnecessary. These shall be of the ball valve type and shall be constructed of a nickel plated brass body, PTFE seats and brass chrome plated ball. The valve shall be operated by a manual operating lever by 90º turn. All medical gas line ball valves shall provide a full bore flow and shall be cleaned for oxygen service and fully tested. The valve assembly shall terminate in copper stub pipes to enable brazing directly into the distribution system using the flux less brazing technique. A locking device shall be provided to lock the valve in either the fully open or fully closed position. Line valves shall be located in readily accessible areas of ducts and shafts, however care should to ensure safety to prevent danger from leakage. Line valve installation should be carried out as per HTM 2022/HTM 02-01 standards.
12 mm BALL VALVE (MGPS)<br>SITC of Line Valves for use in plant rooms and to facilitate the isolation of areas or areas where area zone valve are unnecessary. These shall be of the ball valve type and shall be constructed of a nickel plated brass body, PTFE seats and brass chrome plated ball. The valve shall be operated by a manual operating lever by 90º turn. All medical gas line ball valves shall provide a full bore flow and shall be cleaned for oxygen service and fully tested. The valve assembly shall terminate in copper stub pipes to enable brazing directly into the distribution system using the flux less brazing technique. A locking device shall be provided to lock the valve in either the fully open or fully closed position. Line valves shall be located in readily accessible areas of ducts and shafts, however care should to ensure safety to prevent danger from leakage. Line valve installation should be carried out as per HTM 2022/HTM 02-01 standards.
15 mm BALL VALVE (MGPS)<br>SITC of Line Valves for use in plant rooms and to facilitate the isolation of areas or areas where area zone valve are unnecessary. These shall be of the ball valve type and shall be constructed of a nickel plated brass body, PTFE seats and brass chrome plated ball. The valve shall be operated by a manual operating lever by 90º turn. All medical gas line ball valves shall provide a full bore flow and shall be cleaned for oxygen service and fully tested. The valve assembly shall terminate in copper stub pipes to enable brazing directly into the distribution system using the flux less brazing technique. A locking device shall be provided to lock the valve in either the fully open or fully closed position. Line valves shall be located in readily accessible areas of ducts and shafts, however care should to ensure safety to prevent danger from leakage. Line valve installation should be carried out as per HTM 2022/HTM 02-01 standards.
Oxygen Flow meter with Humidifier Bottle<br>SITC of Flow meter Back pressure Compensated. Flow meter would be accurate gas flow measurement and control within a range of 0-15 liters per minute. It would meet strict precision and durability standards. Flow meter body would be made of brass material. Flow tube and shroud components would be made of clear, impact resistant polycarbonate. The humidifier bottle would be unbreakable polycarbonate material and autoclavable at 134 degrees centigrade. The humidifier would have built in safety valve.
Vacuum regulator with suction bottle<br>SITC of Single piece wall mounted suction collection & regulation unit With jar capacity of 600 ml each shall be provided at each of the bed side. Jars would be made of autoclavable materials. The units shall be clamped neatly to the wall using suitable clamps
Gas / Vacuum Outlets<br>SITC of Gas/Vacuum Outlets with Front loading type terminal outlets designed to dispense medical gases or an inlet for medical vacuum to the secondary equipment flow meters, Surgical Tools, Suction regulators, etc. Terminal unit sealed by O ring. The outlets should Quick Connect Type and gas specificity is accomplished by Diametric indexing / Geometric indexing Should have Push to IN and press-to-OUT mechanism for probes. Allows plugging of probes from front. Parking Type probe / connector Self-sealing valve on disengaging the probe (Quick disconnect) Smooth quite action Non return valve for on line servicing/ repairing , Indexed to eliminate inter-changeability of gas services, Color-coded gas specific front plate Flow rate exceeds the requirements of ISO 9170 – 1. Totally leak proof, safe & easy to operate Configurations possible: surface, flush & Bead-head. The terminal outlets should comply with ISO and NFPA. Body shall be of one piece brass construction.
Area Line Pressure Medical Gas Alarm ( 4 gases)<br>SITC of Four channel microprocessor controlled alarm for pneumatic & vacuum services with Digital display of line pressure for all the services with factory calibrated pressure sensors. Color coded LED display of line pressure status (High-caution normal- caution-low) Audible Alarm for High & Low pressure condition. Test and Alarm Acknowledge (Mute) facility. (Alarm knowledge (mute) time span is programmable from 1 to 60 minutes). Protected programming facility of alarm limits. The electronic circuitry should be such that if the pressure / vacuum in the gas pipeline drops below the present limit, the equipment should give an audio-visual alarm. Visual alarm should remain active even after pressing of “Mute” button. It should come to normal condition only when gas pressure / vacuum return to normal level. Small and compact design. Mounted on a powder coated MS box. Nut & Nipples should be provided for connection with Pneumatic supply complete as required, all QA/QC should be furnished before Engineer (HLL) before installing the system.
BED HEAD PANEL <br>Supply, Installation, testing and commissioning of Bed head panels(1.2m) with Terminal unit provisions as per tender drawing. Provision for Electrical and data points . Accessories<br>including suction holder and one monitor tray
Blaze Systems and Services
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .