| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.7 CrAccepted-AOC | ₹94.7 Cr | L1 | Accepted-AOC REASONABLE LOWEST BIDDER |
| 2 | L2₹97.9 CrRejected-Finance 8TH FLOOR SETHI TRUST BUILDING UNIT II BHANGAGARH G S ROAD GUWAHATI 781005 | KAMRUP METRO | ASSAM | 781005 | ₹97.9 Cr | L2 | Rejected-Finance NOT BEING LOWEST BIDDER |
| 3 | L3₹98.5 CrRejected-Finance F 18 ANSAL COMPLEX OPP JWALA HARI MARKET PASCHIM VIHAR NEW DELHI 110063 | NEW DELHI | WEST DELHI | DELHI | 110063 | ₹98.5 Cr | L3 | Rejected-Finance NOT BEING LOWEST BIDDER |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT BEING ELIGIBLE AS THE FIRM IS NOT FULFILLING CRITERIA AS PER NIT |
| 5 | Rejected-Technical | - | - | Rejected-Technical NOT BEING ELIGIBLE AS THE FIRM IS NOT FULFILLING CRITERIA AS PER NIT |
Tender Value
₹104 Cr
EMD Value
₹15 L
Closing Date
5 Feb 2025, 6:00 pmClosed
CHIEF ENGINEER AF SHILLONG
HQ CHIEF ENGINEER AF SHILLONG ZONE MILITARY ENGINEER SERVICES ELEPHANT FALLS CAMP PO NONGLYER SHILLONG 793009
WORK SERVICES FOR INDUCTION OF CERTAIN TECHNICAL UNITS AT AF STN TEZPUR ON ENGINEERING PROCUREMENT AND CONSTRUCTION EPC MODE
2024_MES_680666_1
88605
Open Tender
Civil Works
730 days
GE(P)(AF)TEZPUR
AS PER NIT CONDITIONS
8 documents required · 8 mandatory
₹3,000
GE(P)(AF)TEZPUR
₹15 L
Yes
16 Jul 2025
22 Oct 2024
7 Feb 2025
22 Oct 2024
5 Feb 2025
20 Nov 2024
23 Oct 2024 - 11 Nov 2024
Amount
DESIGN AND CONSTRUCTION OF INFRASTRUCTURE FOR INDUCTION OF CERTAIN TECHNICAL UNITS AT AIR FORCE STATION TEZPUR ON ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) MODE including all internal and external services, complete all as specified in the scope of work, Drawings and specifications and other parts of the tender documents.
AMC by OEM of AC Plant including repairs of Cooling Tower, Ducts, Pumps, Hot Water Generator, AHU of BOCC, Gurt Complex, SSC & ASB Complex for period of 01 year maintenance including spare parts, consumables like refrigerant gas, lubricants etc. Major and minor repairs necessary for smooth operation of AC Plant. Any defective equipments parts of AC Plant shall be replaced without any extra cost”. Note: (i) The AMC of 1st year of maintenance will start by the next day after completion of DLP period. (ii) All the other items/ parts which are not mentioned in the item, if required necessary for smooth operation of AC Plant shall be deemed to be included in the rate quoted.
AMC by OEM of AC Plant including repairs of Cooling Tower, Ducts, Pumps, Hot Water, Generator, AHU of BOCC, Gurt Complex, SSC & ASB Complex for period of 01 year maintenance including spare parts, consumables like refrigerant gas, lubricants etc. Major and minor repairs necessary for smooth operation of AC Plant. Any defective equipments parts of AC Plant shall be replaced without any extra cost”. Note: (i) The AMC of 2nd year of maintenance will start by the next day after completion of AMC 1st year. (ii) All the other items/ parts which are not mentioned in the item, if required necessary for smooth operation of AC Plant shall be deemed to be included in the rate quoted.
AMC by OEM of AC Plant including repairs of Cooling Tower, Ducts, Pumps, Hot Water, Generator, AHU of BOCC, Gurt Complex, SSC & ASB Complex for period of 01 year maintenance including spare parts, consumables like refrigerant gas, lubricants etc. Major and minor repairs necessary for smooth operation of AC Plant. Any defective equipments parts of AC Plant shall be replaced without any extra cost”. Note: (i) The AMC of 3rd year of maintenance will start by the next day after completion of AMC 2nd year. (ii) All the other items/ parts which are not mentioned in the item, if required necessary for smooth operation of AC Plant shall be deemed to be included in the rate quoted. Note:The AMC for the period of two years after completion of work ie during DLP is deemed to be included in the quoted lumpsum and nothing extra shall be permissible to the contractor for the same.
Outsourcing for Manning & Operation of AC Plant for 03 shifts of 08 Hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at BOCC & Gurt Complex and 02 shifts of 8 hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at SSC & ASB for the period of 01 year after the date of completion of work”.
Outsourcing for Manning & Operation of AC Plant for 03 shifts of 08 Hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at BOCC & Gurt Complex and 02 shifts of 8 hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at SSC & ASB for the period of 01 year after the completion of 1st year
Outsourcing for Manning & Operation of AC Plant for 03 shifts of 08 Hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at BOCC & Gurt Complex and 02 shifts of 8 hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at SSC & ASB for the period of 01 year after the date of completion of 2nd year”.
Outsourcing for Manning & Operation of AC Plant for 03 shifts of 08 Hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at BOCC & Gurt Complex and 02 shifts of 8 hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at SSC & ASB for the period of 01 year after the date of completion of 3rd year”.
Outsourcing for Manning & Operation of AC Plant for 03 shifts of 08 Hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at BOCC & Gurt Complex and 02 shifts of 8 hours each per day by one skilled AC Refrigerator Mechanic in each shift and each location at SSC & ASB for the period of 01 year after the date of completion of 4th year
City Promoter and Buildwell Pvt. Ltd. (BID ID -3226652)
PRABHU AGARWALLA CONSTRUCTION PVT LTD (BID ID -3207674)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.29 MB
Tenderdocument.rar
Tender Documents • 16.23 MB
Tenderdocument_2.rar
Tender Documents • 21.39 MB
Tenderdocument.pdf
Tender Documents • 12.08 MB
Download all tender documents and submit your bid