| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC BILASPUR TEHSIL BILASPUR DISTRICT RAMPUR UTTAR PRADESH | BILASPUR | RAMPUR | UTTAR PRADESH | ₹7.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.7 LRejected-AOC BILASPUR TEHSIL BILASPUR DISTRICT RAMPUR UTTAR PRADESH | BILASPUR | RAMPUR | UTTAR PRADESH | ₹7.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹7.7 LRejected-AOC | ₹7.7 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M/S MUZAKKIR HUSAIN CONTRACTOR L2 | ARSHI KHAN & SONS L3 | dhwani enterprises and contractor L1 |
|---|---|---|---|---|---|---|
| 1.00Ward-10 Nagar Palika Parichetra bilaspur ke antargat Upar Sainjani Canal Par V.R.B. Nirman Karya (As per Estimate) | ||||||
| 1.01 | Earth work in embankment in ordinary soil excavation to be in form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 600 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil within 30 m distance as directed by Engineer in charge & also including all cost of material, labour & T&P etc. complete. | 91.25 | M3 | 239 ₹21,808.75 | 240 ₹21,900 | 239 ₹21,808.75 |
| 1.02 | Earthwork excavation in foundation in dry soil (loam clay or sand) including lift upto 1.50m and lead upto 30 m and including back filling, watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer in charge | 299.41 | M3 | 199 ₹59,582.59 | 200 ₹59,882 | 199 ₹59,582.59 |
| 1.03 | Laying local sand under P.C.C. concrete including all cost of labour, material and T&P etc. complete. | 7.59 | M3 | 1,200 ₹9,108 | 1,200 ₹9,108 | 1,199 ₹9,100.41 |
| 1.04 | P.C.C. 1:3:6 in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 21.15 | M3 | 6,900 ₹1.5 L | 6,900 ₹1.5 L | 6,900 ₹1.5 L |
| 1.05 | 1st class Brick work in 1:4 cement and coarse sand mortar including cost of material, T&P and labour etc complete etc. | 65.6 | M3 | 5,110 ₹3.4 L | 5,110 ₹3.4 L | 5,109 ₹3.4 L |
| 1.06 | Lean concrete (1:4:8) filled Between land wings wall and abutment i/c all cost of materials, labour, T&P etc. complete | 2.91 | M3 | 6,850 ₹19,933.50 | 6,850 ₹19,933.50 | 6,850 ₹19,933.50 |
| 1.07 | C.C. (1:2:4) in bed flooring with crushed stone ballast and coarse sand including cost of material, T&P and labour complete. | 3.38 | M3 | 7,000 ₹23,660 | 7,100 ₹23,998 | 7,000 ₹23,660 |
| 1.08 | S/Fixing reinforcement for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete. | 0.74 | M.T. | 83,000 ₹61,088 | 83,000 ₹61,088 | 83,000 ₹61,088 |
| 1.09 | Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. length with all cost of material, T&P and labour complete. | 4 | No. | 115 ₹460 | 116 ₹464 | 116 ₹464 |
Tender Value
Refer Docs
EMD Value
₹18,300
Closing Date
2 Dec 2025, 3:00 pmClosed
EO NPP Bilaspur
NPP Bilaspur
Ward-10 Nagar Palika Parichetra bilaspur ke antargat Upar Sainjani Canal Par V.R.B. Nirman Karya (As per Estimate)
2025_DOLBU_1092295_1
745/nppb/2025-2026/Rajvit-05
Open Tender
Civil Works
120 days
Bilaspur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,062
Executive Officer
₹18,300
9 Dec 2025
21 Nov 2025
2 Dec 2025
21 Nov 2025
2 Dec 2025
21 Nov 2025
Amount
Ward-10 Nagar Palika Parichetra bilaspur ke antargat Upar Sainjani Canal Par V.R.B. Nirman Karya (As per Estimate)
Earth work in embankment in ordinary soil excavation to be in form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 600 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil within 30 m distance as directed by Engineer in charge & also including all cost of material, labour & T&P etc. complete.
Earthwork excavation in foundation in dry soil (loam clay or sand) including lift upto 1.50m and lead upto 30 m and including back filling, watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer in charge
Laying local sand under P.C.C. concrete including all cost of labour, material and T&P etc. complete.
P.C.C. 1:3:6 in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
1st class Brick work in 1:4 cement and coarse sand mortar including cost of material, T&P and labour etc complete etc.
Lean concrete (1:4:8) filled Between land wings wall and abutment i/c all cost of materials, labour, T&P etc. complete
C.C. (1:2:4) in bed flooring with crushed stone ballast and coarse sand including cost of material, T&P and labour complete.
S/Fixing reinforcement for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete.
Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. length with all cost of material, T&P and labour complete.
Two coat painting over abutement cap with bitumen @1.70kg per Sqm. In each coat including supply of all materials, labour and T & P etc. required proper completion of work.
Supply and laying two layer of tarfelt over abutement cap as per direction of the Engineer in charge including necessary overlap including supply of all materials, labour and T & P etc. required proper completion of work.
R.C.C. (1:1.5:3) M-20 in slab with crushed stone ballast and coarse sand including cost of material, T&P and labour complete.
Premould joint filler 25mm thick /m² including supply of all materials, labour and completion of work.
Stuck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand including supply of all materials, labour and completion of work.
Brick on edge in mortar soiling including all cost of labour, material and T&P etc. complete.
Painting two coat with ready mixed paint with superior synthetic enamel paint of standard make brushing to give an even shade and finished and including cleaning the surface of all dirt, dust and other foreign matter, sandpapering and stripping including cost of all materials, labour, T&P etc. complete.
Earth work in cutting to removal of diversion bund to strengthening of banks of canal in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and lead up to 30 m.
M/S MUZAKKIR HUSAIN CONTRACTOR (BID ID -5714561)
ARSHI KHAN & SONS (BID ID -5714906)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.64 MB
BOQ_2006862.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid