Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.3 LAccepted-AOC AT PROFESSOR COLONY P O MAITHON DIST DHANBAD 828207 | DHANBAD | JHARKHAND | 828207 | ₹11.3 L | L-1 | Accepted-AOC As per TC recommendation. |
| 2 | L-2₹11.6 LRejected-Finance AT 246 NIRSA P O NIRSA DIST DHANBAD 828205 | DHANBAD | JHARKHAND | 828205 | ₹11.6 L | L-2 | Rejected-Finance As per TC recommendation. |
| 3 | Rejected-Technical N A | - | - | Rejected-Technical As per TC recommendation. |
Tender Value
₹11.3 L
EMD Value
₹14,200
Closing Date
27 Feb 2026, 5:00 pmClosed
AE (Civil)
Office of The General Manager, Mugma Area, P.O-Mugma, Dist.- Dhanbad, 828204
Construction of Drain from pond and behind Block 02 to Hume pipe culvert at Nirsa OCP under Lakhimata Group of mines.
2026_ECL_353363_1
ECL/GM/MA/CE/25-26/eTender/221 Dt. 16.02.2026
Open Tender
Civil Works - Buildings
60 days
Nirsa OCP
Please refer Tender documents.
4 documents required · 4 mandatory
₹14,200
24 Mar 2026
17 Feb 2026
28 Feb 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
17 Feb 2026 - 24 Feb 2026
Based on analysis
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources).
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:Cement Mortar 1:6 (1 cement : 6 coarse sand).
12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_366149.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid