Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC HDM O O EXECUTIVE ENGINEER HSVP DIVISION SONIPAT | ₹1.8 L Quoted ₹1.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 LRejected-AOC | ₹1.9 L | L2 | Rejected-AOC L2 |
Tender Value
₹1.9 L
EMD Value
₹3,810
Closing Date
4 Apr 2026, 5:00 pmClosed
Pawan Kumar
DIV Sonepat
Annual maintenance of Water supply and sewerage scheme in Sector - 23, U/E, Sonipat
2026_HBC_511553_1
20269C6A7F12 A3F8 4EDB 8CAD 43A90213A569243HSV
Open Tender
Civil Works
90 days
Sonepat
2 documents required · 2 mandatory
₹250
₹3,810
Yes
9 Apr 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
4 Apr 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. | - | P.Cum | 0.57 | - |
| 2 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | 1 | P.Sqm | - | - |
| 3[14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum | |||||
| 4 | [21.43]Extra over the rate laid down in this schedule for cement concrete work more making and finishing benching and complicated floor work in manholes, including formation of channels and bulldozing and smooth finishing the surface accurately to template. | - | Per Sqm benching and flooring surface measures horizontaly | 0.84 | - |
| 5[21.57.1.4]Providing masonry plugs to ends of sewers of all types with 11.43 cm thick brick wall in cement sand mortar 1:7 with 12 mm thick cement plaster 1:6 (as required by the engineer-in-charge). 1.4. For Circular sewers having internal diameter - 200 mm | |||||
| 6[21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | |||||
| 7[21.94.3]Providing salt glazed stone ware pipes grade ‘A’ in standard length of 600 mm each pipe marked with IS: 651 and their lowering, cutting, jointing and testing as described in item No. 21.38, 21.39, item 21.40 including the cost of jointing materials as well as carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction of Engineer-in-charge. 3. 200mm i/d | |||||
| 8 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1 | P.Cum | 0.31 | ₹0.31 |
| 9 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | - | P.Cum | 0.67 | - |
| 10 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | - | P.Sqm | 0.09 | - |
stage.html
html • 0.04 MB
technical_590353.pdf
techsummary_590353.pdf
finance_590353.pdf
BOQ Comparative Chart
xlsx
finsummary_590353.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_590353.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid