Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Finance PLOT NO 3A IDA SEETARAMPATNAM PALONCHA 507 115 BHADRADRI KOTHAGUDEM DISTRICT TELANGANA | PALONCHA | KOTHAGUDEM | TELANGANA | 507115 | ₹14.6 L | L1 | Admitted-Finance |
| 2 | L2₹14.7 L+₹15,440 (1.06%)Admitted-Finance | ₹14.7 L+₹15,440 (1.06%) | L2 | Admitted-Finance |
| 3 | L3₹18.7 L+₹4.2 L (28.7%)Admitted-Finance | ₹18.7 L+₹4.2 L (28.7%) | L3 | Admitted-Finance |
| 4 | L4₹20.7 L+₹6.1 L (41.9%)Admitted-Finance AIRPORT ROAD KOHINOOR MALAPPURAM DIST PIN 673635 | MALAPPURAM | MALAPPURAM | KERALA | 673635 | ₹20.7 L+₹6.1 L (41.9%) | L4 | Admitted-Finance |
| 5 | L5₹30.9 L+₹16.3 L (112.1%)Admitted-Finance | ₹30.9 L+₹16.3 L (112.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MARVEL ENTERPRISES L1 | POWERTECH TRANSFORMER SERVICES L5 | BASAVARAJM L3 | M/S Vasavi Engineering Corporation L2 | MELCON ENGINEERS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | PART A
Receipt, dragging, handling, storage, erection, oil processing, commissioning and handing over the transformer. Price for 1 No. 200MVA, 21/400/√3 kV, 1-Ph, GT at NLC Tamilnadu Power Limited, Tuticorin Thermal power project. (Scope of Work as per Clause 4.1 to 4.5 of tender)
(Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | 10,79,550 ₹12,73,869 | 24,80,000 ₹24,80,000 | 11,00,800 ₹12,98,944 | 8,63,000 ₹10,18,340 Lowest | 13,00,000 ₹15,34,000 |
| 1.02 | PART A
Dragging on rails / sleeper & placement on plinth 200 MVA transformer upto 100 meter dragging
(Lump sum rate per meter shall be quoted here) | 100 | Price per meter | 450 ₹531 Lowest | 3,80,000 ₹3,80,000 | 1,20,000 ₹1,41,600 | 500 ₹590 | 50,000 ₹59,000 |
| 2.01 | PART B (OPTIONAL)
Additional dragging of transformer on rail / sleeper either due to distance being more than that specified in scope of work (Basic lump sum rate per meter shall be quoted here) | 1 | Price per meter | 500 ₹590 Lowest | 3,800 ₹3,800 | 12,000 ₹14,160 | 4,000 ₹4,720 | 5,000 ₹5,900 |
| 2.02 | PART B (OPTIONAL) Additional Turning of transformer by 180 degree for dragging / placement of plinth
(Basic lump sum rate per transformer shall be quoted here) | 1 | Lump Sum | 5,000 ₹5,900 Lowest | 40,000 ₹40,000 | 60,000 ₹70,800 | 1,50,000 ₹1,77,000 | 90,000 ₹1,06,200 |
| 2.03 | PART- B (OPTIONAL) To carryout additional drying of transformer beyond the mandatory cycles) by N2 purging & heating under N2 filled condition. Supply of N2 cylinders having required dew point and heaters shall be contractor scope
(Basic lumpsum rate per cycle shall be quoted here) | 1 | Price per cycle | 54,000 ₹63,720 | 1,00,000 ₹1,00,000 | 1,20,000 ₹1,41,600 | 50,000 ₹59,000 Lowest | 1,30,000 ₹1,53,400 |
| 2.04 | PART- B (OPTIONAL)
EXTRA HIRE CHARGES
Labour charges for repair / rectification / modification / additional work
(Rate per day shall be quoted here) | 1 | Rate per day | 9,000 ₹10,620 | 10,000 ₹10,000 | 27,000 ₹31,860 | 25,000 ₹29,500 | 3,500 ₹4,130 Lowest |
| 2.05 | PART-B (OPTIONAL)
Hire charges for providing major facilities by contractor if needed for additional / extra work. Long boom Cranes suitable for Bushing Erection (Rate per day shall be quoted here) | 1 | Rate Per day | 40,000 ₹47,200 | 25,000 ₹25,000 | 20,000 ₹23,600 Lowest | 50,000 ₹59,000 | 50,000 ₹59,000 |
| 2.06 | PART-B (OPTIONAL) Derrick (Rate per day shall be quoted here) | 1 | Rate Per day | 10,000 ₹11,800 Lowest | 20,000 ₹20,000 | 50,000 ₹59,000 | 25,000 ₹29,500 | 30,000 ₹35,400 |
| 2.07 | PART-B (OPTIONAL)
High Vacuum Filter Machine
For 12000 lph capacity filter machine (Rate per day shall be quoted here)
(Rate per day shall be quoted here) | 1 | Rate Per day | 12,000 ₹14,160 | 14,000 ₹14,000 Lowest | 25,000 ₹29,500 | 25,000 ₹29,500 | 25,000 ₹29,500 |
| 2.08 | PART-B (OPTIONAL) For 10000 lph capacity filter machine (Rate per day shall be quoted here) | 1 | Rate Per day | 8,000 ₹9,440 Lowest | 12,000 ₹12,000 | 19,000 ₹22,420 | 20,000 ₹20,000 | 23,000 ₹27,140 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
20 Aug 2026, 6:00 pmClosed
SMRM
TELK,ANGAMALY
Leading and positioning, Erection, Testing and Commissioning of one no repaired Single Phase, 200MVAGenerator transformer at NLC Tamilnadu Power Limited
2026_TEKL_865229_1
TELK/C AND M/OES/TRER/368/2026
Open Tender
Miscellaneous Works
Item Wise
365 days
NLC Tamilnadu
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Yes
₹20,000
Yes
28 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | PART A
Receipt, dragging, handling, storage, erection, oil processing, commissioning and handing over the transformer. Price for 1 No. 200MVA, 21/400/√3 kV, 1-Ph, GT at NLC Tamilnadu Power Limited, Tuticorin Thermal power project. (Scope of Work as per Clause 4.1 to 4.5 of tender)
(Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | - | - |
| 1.02 | PART A
Dragging on rails / sleeper & placement on plinth 200 MVA transformer upto 100 meter dragging
(Lump sum rate per meter shall be quoted here) | 100 | Price per meter | - | - |
| 2.01 | PART B (OPTIONAL)
Additional dragging of transformer on rail / sleeper either due to distance being more than that specified in scope of work (Basic lump sum rate per meter shall be quoted here) | 1 | Price per meter | - | - |
| 2.02 | PART B (OPTIONAL) Additional Turning of transformer by 180 degree for dragging / placement of plinth
(Basic lump sum rate per transformer shall be quoted here) | 1 | Lump Sum | - | - |
| 2.03 | PART- B (OPTIONAL) To carryout additional drying of transformer beyond the mandatory cycles) by N2 purging & heating under N2 filled condition. Supply of N2 cylinders having required dew point and heaters shall be contractor scope
(Basic lumpsum rate per cycle shall be quoted here) | 1 | Price per cycle | - | - |
| 2.04 | PART- B (OPTIONAL)
EXTRA HIRE CHARGES
Labour charges for repair / rectification / modification / additional work
(Rate per day shall be quoted here) | 1 | Rate per day | - | - |
| 2.05 | PART-B (OPTIONAL)
Hire charges for providing major facilities by contractor if needed for additional / extra work. Long boom Cranes suitable for Bushing Erection (Rate per day shall be quoted here) | 1 | Rate Per day | - | - |
| 2.06 | PART-B (OPTIONAL) Derrick (Rate per day shall be quoted here) | 1 | Rate Per day | - | - |
| 2.07 | PART-B (OPTIONAL)
High Vacuum Filter Machine
For 12000 lph capacity filter machine (Rate per day shall be quoted here)
(Rate per day shall be quoted here) | 1 | Rate Per day | - | - |
| 2.08 | PART-B (OPTIONAL) For 10000 lph capacity filter machine (Rate per day shall be quoted here) | 1 | Rate Per day | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 16.63 MB
BOQ_1464173.xls
BOQ • 0.29 MB
DATE.pdf
PDF • 0.08 MB
d.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .