Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-AOC | ₹28.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.4 L+₹2.0 L (6.98%)Rejected-Finance | ₹30.4 L+₹2.0 L (6.98%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Praveen Chauhan L2 | JITENDER SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all heights, depths and in all kinds of soils including saturated soils comprisng of pick work jumper work, blasting work both in soft and hard chisselling/wedging out of rock (where blasting is prohibted)and their intermediate classification with in all leads and lifts, stacking the excavated rock, soil not more than 3 (Three) meters clear from the edge of excavation and then returning the stacked soil in 15Cm (Fifteen centimetre) layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads lifts.and carriage of material as per the direction of the Engineer In charge. | 321.17 | Per cubic metre. | 190 ₹61,022.3 Lowest | 210 ₹67,445.7 |
| 2.00 | Supplying and filling in plinth with sand under floors, including watering, romming, consolidating and dressing complete as per HP.PWD specification, including carriage of all labour equipments and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges. | 1.59 | Per cubic metre. | 2,500 ₹3,975 | 2,100 ₹3,339 Lowest |
| 3.10 | Providing form work with steel plates 3.15 mm. (Three point fifteen milimetre) thick welded with angle iron in frame 30x30x5mm (Thirty into thirty into Five millimetre) So as to give a fair finish including centring, shuttering, strutting and propping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs (Four metre) and removal of the same for in situ reinforced concrete and plain concrete work in Flat surfaces such as soffits of suspended floors, roofs, landing and the like Floors etc. upto 200mm. ( Two hundred milimetre) In thickness. including all leads, lifts and carriage of materials, as per the direction of the Engineer In charge. | 19.03 | Per square metre | 413 ₹7,859.39 | 350 ₹6,660.5 Lowest |
| 3.20 | Providing form work with steel plates 3.15 mm. (Three point fifteen milimetre) thick welded with angle iron in frame 30x30x5mm (Thirty into thirty into Five millimetre) . So as to give a fair finish including centring, shuttering, strutting and propping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs (Four metre) and removal of the same for in situ reinforced concrete and plain concrete work in Beams, cantilever, girders and lintels.Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels not exceeding 1 mtr. (One metre) In depth in all heights from floor, including all leads, lifts and carriage of materials, as per the direction of the Engineer In charge. | 7.06 | Per square metre | 350 ₹2,471 | 300 ₹2,118 Lowest |
| 3.30 | Providing form work with steel plates 3.15 mm. (Three point fifteen milimetre) thick welded with angle iron in frame 30x30x5mm (Thirty into thirty into Five millimetre) . So as to give a fair finish including centring, shuttering, strutting and propping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs (Four metre) and removal of the same for in situ reinforced concrete and plain concrete work in Edge of slabs and breaks in floors and walls, including all leads, lifts and carriage of materials, as per the direction of the Engineer In charge. | 36.15 | Per running meter | 130 ₹4,699.5 | 110 ₹3,976.5 Lowest |
| 4.00 | Providing form work with steel plates 3.15 mm. (Three point fifteen milimetre) thick welded with angle iron in frame 30x30x5mm (Thirty into thirty into Five millimetre) So as to give a fair finish including centring, shuttering, strutting and propping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs (Four metre) and removal of the same for in situ reinforced concrete and plain concrete work in Vertical surface such as wall (any thikness partitions and the like i/c attd. Buttresses, pilasters plinth and string courses and the like including all leads, lifts and carriage of materials, as per the direction of the Engineer In charge. | 305.65 | Per square metre | 390 ₹1,19,203.5 | 250 ₹76,412.5 Lowest |
| 5.00 | Providing and laying cement concrete 1:6:12 [One cement isto Six sand isto Twelve graded stone aggregate 40 mm (Fourty millimetre) nominal size] and curing complete excluding cost of form work in Foundation and plinth including all leads lifts and carriage of materials, as per the direction of Engineer-Incharge. | 9.38 | Per cubic metre. | 3,900 ₹36,582 Lowest | 4,100 ₹38,458 |
| 6.00 | Providing and laying Damp proof corse 50mm thick with C.C 1:2:4 (one cement isto two Sand isto Four graded stone aggregate 20mm (twenty millimetre) nominal size) and curing complete in all leads,lifts and other incidental chargesas per the direction of the Engineer In charge. | 9.47 | Per square metre | 350 ₹3,314.5 | 240 ₹2,272.8 Lowest |
| 7.00 | Applying a coat of hot bitumen (mexphelt 80/100 ( Eighty / Hundred) or equivalent) sing 1.70kg (One point Seventy Kilograme) per sqm damp proof course after cleaning the surface with a piece of cloth lightly soaked with kerosine oil in all leads,lifts and other incidental charges | 9.47 | Per square metre | 155 ₹1,467.85 | 120 ₹1,136.4 Lowest |
| 8.00 | Providing and laying cement concrete 1:4:8 [One cement isto foure sand isto Eight graded stone aggregate 40 mm (Forty) milimetre nominal size] and curing complete excluding cost of form work and reinforcement for concrete work in in Foundation and plinth Including all leads lifts and carriage of materials, as per the direction of Engineer-Incharge | 247.32 | Per cubic metre. | 4,200 ₹10,38,744 Lowest | 5,000 ₹12,36,600 |
Tender Value
₹31.6 L
EMD Value
₹63,500
Closing Date
10 Aug 2022, 10:30 amClosed
EXECUTIVE ENGINEER
RAJGARH DIVISION HPPWD RAJGARH
C/O Vetnery Dispensary building at Phagoo Tehsil Rajgarh Distt. Sirmour (H.P.) (SH Site Development , Building portion, Septic Tank, Soak Pit , Rain water Harvesting Tank ,Water supply Sanitary Installation etc.)
2022_PWD_63385_6
No.PW.RGH.Tender-2022-23-4970 dt. 2.8.22
Open Tender
Civil Works
Item Rate
270 days
RAJGARH DIVISION HPPWD RAJGARH
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,500
₹63,500
22 Aug 2026
3 Aug 2022
10 Aug 2022
3 Aug 2022
10 Aug 2022
3 Aug 2022
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .