Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC 2 2 LAXMI NAGAR SUPELA BHILAI DURG CHHATTISGARH 490023 UDYAM CG 05 0000169 | DURG | CHHATTISGARH | 490023 | ₹23.7 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹23.7 LRejected-Finance | ₹23.7 L | L2 | Rejected-Finance IInd Lowest |
| 3 | L3₹24.0 LRejected-Finance | ₹24.0 L | L3 | Rejected-Finance IIIrd Lowest |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹23.7 L
EMD Value
₹2.4 L
Closing Date
13 Jan 2026, 12:00 pmClosed
Shri Krishna Kumar
Office of the EE, C.D. PWD, Chandauli
Pachavaniya se Keradih marg par puliya marammat sahit Vishesh Marammat ka karya
2026_CEUVZ_1103744_20
EE Ref No. 2777/4A Dt. 24.12.2025
Open Tender
Civil Works - Roads
60 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹2.4 L
Yes
Chandauli
13 May 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
5 Jan 2026
Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular sub base by providing well graded material spreading in uniform layer with moter grader on prepared surface at OMC and compacting with smooth wheel roller to achieve the desired density complete as per techanical specation Clause 401. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing , laying , spreading and compacting of stone aggragates 45-63 mm specific size in 75 mm compacted thickness to water bound macadam of G-II specification including spreading in uniform thickness, hand packing, rolling with static roller 8-10 tones in stage to proper grade and camber applying and brooming requiste type of sreening / binding materials crushed 2.8 mm stone dust to fill up the interstices of coarse aggregate, watering and compacting as per directed by E/I, as per techanical specification no 405. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing , laying , spreading and compacting of stone aggragates 22.4-53 mm size in 75 mm compacted thickness to water bound macadam of G-III specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 8-10 tones in stage to proper grade and camber applying and brooming requiste type of sreening / binding materials stone dust to fill up the interstices of coarse aggregate, watering and compacting as per directed by E/I, as per techanical specification no 405. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 kg/sqm using manual Mechaincal Means as per techinical specification clause 502. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumin pressure distributer at the rate of 0.30 kg per sqm in the norms bituminious surface cleaned with machanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing Laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm & 11.2 mm aggregate either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base. Including mixing in a suitable plant or mixol laying and rolling with a three wheels 80-100 KN static roller capacity, finished to required level and grade.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying of seal coat sealing the voids in a bituminious surface laid to specification to the specified levels,using crushed stone chipping 6.7 mm size and penetration bitumen grade V.G.-10 as per techinical Specification Clause 510. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) .
Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, spreading grading to required slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) .
Dismantaling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 as per SI No. 5 (2.6 b) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per SI No. 280. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
C.C.with M-20 (1:2:4) cment,coarse sand & 20mm size stone aggregate including s/o all material labour T&P etc required for proper completion of the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
C.R with cement and coarse sand mortar in proportion of 1:4 respectively for foundation including cost of all material, labour, T&P etc. required for proper completion of work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
C.R with cement and coarse sand mortar in proportion of 1:4 respectively for sub structure including cost of all material, labour, T&P etc. required for proper completion of work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
R.C.C. in 1:1.5:3 cment,coarse sand&20mm size stone aggregate including s/o all material labour T&P etc required for proper completion of the work . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured as per SI 504 P-30. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying filter media with 45-90 mm stone ballast in side of abutments and wing wall including cost of all material, labour, T&P etc. required for proper completion of work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing weep holes in brick masonry/ stone masonry plain/ reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure slope of 1(V) 20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 as per SI P-51. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL as per SI P-51. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
P/L , fixing, jointing 600 mm NP-3 Hume Pipe including Collers / Spigot jointed etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying Pitching including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 including supply of all materials labour and T & P etc. required for proper completion of the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 for Divergon work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 for Divergon work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
Tendernotice_2.pdf
PDF • 1.90 MB
BOQ_2035692.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid