Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 CrAdmitted-Finance | ₹7.8 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s United Jehlum Road & Roof Builders L1 |
|---|---|---|---|---|
| 1.00 | Design & Construction of 1x50 Mtr motrable Bridge with carriageway width of 5.5m over Nallah Ningli near Shrunz Water Fall on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE).
The job includes design & construciton of the bridge in totality as per the latest IRC Codes & MORTH specifications including soil investigation. Design, construciton of sub-structure & superstructure (With Suitable Bearings, Drainage spouts along expansion/ contraction joints, approaches & other appurtenances) and finally load testing duly approved by the department incl. construction of approaches of required length minimum 105 mt (or as per the directions of Engineer in charge) on each side by way of earth cutting, filling, construction of protection works ie. R/ walls ,Edge walls, B/walls, laying of pipes, , laying of GSB, WBM grade II, WMM incl. Macadamization, river training works for 100mtrs each on upstream and downstream side, including painting with enamel paint, lighting of bridge etc (Complete Job in all respects) | 1 | job | 7,85,00,000 ₹7,85,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹15.8 L
Closing Date
12 Mar 2024, 4:00 pmClosed
Executive Engineer
RnB Division Baramulla
Design and Construction of 1x50 Mtr Span Trussed Girder Bridge over Nallah Ningli near Shrunz Water Fall.
2024_PWDJK_246631_1
186/14059-68/2023-24/RnB/Bla Dated 07.03.2024
Open Tender
Civil Works
Percentage
365 days
Baramulla
Please refer Tender documents.
11 documents required · 11 mandatory
₹8,500
Executive Engineer RnB Division Baramulla
₹15.8 L
16 Aug 2024
7 Mar 2024
13 Mar 2024
7 Mar 2024
12 Mar 2024
7 Mar 2024
Amount
Design & Construction of 1x50 Mtr motrable Bridge with carriageway width of 5.5m over Nallah Ningli near Shrunz Water Fall on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE). The job includes design & construciton of the bridge in totality as per the latest IRC Codes & MORTH specifications including soil investigation. Design, construciton of sub-structure & superstructure (With Suitable Bearings, Drainage spouts along expansion/ contraction joints, approaches & other appurtenances) and finally load testing duly approved by the department incl. construction of approaches of required length minimum 105 mt (or as per the directions of Engineer in charge) on each side by way of earth cutting, filling, construction of protection works ie. R/ walls ,Edge walls, B/walls, laying of pipes, , laying of GSB, WBM grade II, WMM incl. Macadamization, river training works for 100mtrs each on upstream and downstream side, including painting with enamel paint, lighting of bridge etc (Complete Job in all respects)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .