Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L Quoted ₹4.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹4.7 LRejected-Finance | ₹4.7 L | L2 | Rejected-Finance High |
Tender Value
₹4.7 L
EMD Value
₹9,400
Closing Date
15 Apr 2026, 12:00 pmClosed
Executive Enginer
Office of the Executive Enginer, R.E.D. Bahraich
Vikas Khan Huzoorpur me Huzoorpur Chaurahe ke paas sarvajanik urinal ka nirman karya_04
2026_REDUP_1133427_4
1277/RED/Etender(37)/2025-26, Dt. 16.03.2026
Open Tender
Civil Works
180 days
Bahraich
Please refer Tender documents.
2 documents required · 2 mandatory
₹692
₹9,400
30 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) maunal means over areas ( exceding 30 cm in dept, 1.5 mtr. In widht as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 mtr. And for all lift as directed y engineer incharge all kind of soil.DSR-2.6.1 | - | CUM | - | - |
| 2 | Excavating. Supplying, stacking and filling of local earth (including roylaty) by mechhanical transport upto a lead of 5 km. also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complate for all lift.2.25A | - | CUM | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)(DSR-4.1.8) | - | CUM | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level) 1:1.5:3
Footing | - | CUM | - | - |
| 5 | Column | - | CUM | - | - |
| 6 | Plinth | - | CUM | - | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement :1.5 coarse sand derived from natural sources : 3 graded stone aggregate20 mm nominal size derived from (Slab) | - | CUM | - | - |
| 8 | Beam | - | CUM | - | - |
| 9 | Column | - | CUM | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . Thermo-Mechanically Treated bars of grade Fe-500D or more.
upto plinth | - | QTL | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 0.42 MB
BOQ_2115663.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid