Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-AOC | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | E SHAMAL L1 |
|---|---|---|---|---|
| 1.00Toilet constrcution | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 1.7 | cum | 221.93 ₹377.5 Lowest |
| 1.00 | OD371907/2024-2025:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges
etc. (MOD 50.6.7.1 of DAR) | 1.7 | cum | 6,014.53 ₹10,230.72 Lowest |
| 1.00 | OD371906/2024-2025:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for superstructure above plinth level up to floor two level including all cost of materials, labour charges etc. complete(MOD 50.6.7.2 of DAR) | 4.8 | cum | 6,789.1 ₹32,608.05 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.26 | cum | 7,066.43 ₹1,830.21 Lowest |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 0.83 | cum | 11,917.14 ₹9,843.56 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 9 | sqm | 845.86 ₹7,612.74 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.9 | sqm | 673.79 ₹606.41 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 66.08 | kilogram | 101.93 ₹6,735.53 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 35.76 | sqm | 325.7 ₹11,647.03 Lowest |
Tender Value
₹1.3 L
EMD Value
₹3,175
Closing Date
14 Aug 2025, 6:00 pmClosed
Assistant Engineer
LSGD Section, Puzhathi Zonal
CONSTRUCTION OF TOILET BUILDING AT KORJAN UP SCHOOL IN DIVISION 11
2025_LSGD_782940_12
AE/LSGD/KMC/Re-Etender/2024-25
Open Tender
Civil Works - Buildings
Item Rate
180 days
LSGD Section, Puzhathi Zonal
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
Yes
₹3,175
Yes
18 Nov 2025
6 Aug 2025
18 Aug 2025
6 Aug 2025
14 Aug 2025
6 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1285334.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .