| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | ₹6.6 L | L1 | Accepted-Finance Being lowest bid L1 |
| 2 | L2₹7.0 L+₹44,533.24 (6.76%)Rejected-Finance | ₹7.0 L+₹44,533.24 (6.76%) | L2 | Rejected-Finance Being higher than L1 Bid |
| 3 | L3₹7.8 L+₹1.2 L (17.6%)Rejected-Finance | ₹7.8 L+₹1.2 L (17.6%) | L3 | Rejected-Finance Being higher than L1 Bid |
| Sl No | Description | Qty | Unit | FC TECNRGY PRIVATE LIMITED L1 | DGR SUSTAINABILITY PVT LTD L3 | BHHO TECH SOLUTIONS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE ‘A’ PART-I (Shifting of fuel cell based Hybrid Power augmentation system ) | ||||||
| 1.01 | Scope of work includes dismantling of the complete system at existing sites and reinstallation at the new site. Following effort will be involved. (a) Deployment of dedicated service Engineer for the duration of entire project. (b) Hiring labour for on site installation and support activities. (c) Dismantling effort for complete system. (d) Re-installation of complete system at new location incl installation of new earthing systems, lightning Arrestor (LA) setup and use of chemical earthing solution. (e) Miscallaneous accessories electrical equipment and spares and other consumables required for re-installation. | 2 | Set | 3,29,586 ₹6,59,172 Lowest | 3,87,592.9 ₹7,75,185.8 | 3,51,852.62 ₹7,03,705.24 |
Tender Value
₹6.6 L
EMD Value
₹13,200
Closing Date
6 Jul 2026, 11:30 amClosed
SO1 (Wks), HQ 5 Sect AR
SO1 (Wks), HQ 5 Sect AR
Provision for shifting of Fuel Cell based hybrid power augmentation system for COB Mimi and COB Pungro of 41 Assam Rifles.
2026_ARMHA_913024_1
VIII.28028/30 AR/Fuel Cell/Engr/2026-27/18
Open Tender
Electrical Works
Item Rate
180 days
Pungro
As per tender documents
2 documents required · 2 mandatory
₹1,000
SO1 (Wks) HQ 5 Sect AR
₹13,200
15 Sept 2026
15 Jun 2026
7 Jul 2026
15 Jun 2026
6 Jul 2026
15 Jun 2026
15 Jun 2026 - 6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE ‘A’ PART-I (Shifting of fuel cell based Hybrid Power augmentation system ) | |||||
| 1.01 | Scope of work includes dismantling of the complete system at existing sites and reinstallation at the new site. Following effort will be involved. (a) Deployment of dedicated service Engineer for the duration of entire project. (b) Hiring labour for on site installation and support activities. (c) Dismantling effort for complete system. (d) Re-installation of complete system at new location incl installation of new earthing systems, lightning Arrestor (LA) setup and use of chemical earthing solution. (e) Miscallaneous accessories electrical equipment and spares and other consumables required for re-installation. | 2 | Set | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_959553.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .