Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹48.7 L+₹2.1 L (4.55%)Accepted-Finance | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Thambi sebastian L1 | RedRock Developers L2 |
|---|---|---|---|---|---|
| 1.00Side Protection | |||||
| 1.00 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 24 | metre | 1,805.55 ₹43,333.2 Lowest | 1,887.62 ₹45,302.88 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 296 | hour | 461.66 ₹1,36,651.36 Lowest | 482.64 ₹1,42,861.44 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 298.98 | cum | 260.29 ₹77,820.72 Lowest | 272.12 ₹81,357.62 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 331.11 | cum | 8,658 ₹28,66,707.09 Lowest | 9,051.55 ₹29,97,013.46 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.53 | cum | 9,331.75 ₹42,291.49 Lowest | 9,755.92 ₹44,213.83 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 60.31 | sqm | 390.16 ₹23,530.55 Lowest | 407.89 ₹24,599.85 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 510.25 | sqm | 848.31 ₹4,32,850.18 Lowest | 886.87 ₹4,52,525.42 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.75 | cum | 10,067.26 ₹7,550.45 Lowest | 10,524.86 ₹7,893.65 |
| 1.01 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 192.6 | metre | 124.15 ₹23,911.29 Lowest | 129.79 ₹24,997.55 |
Tender Value
₹42.4 L
EMD Value
₹50,000
Closing Date
19 Mar 2026, 5:00 pmClosed
Executive Engineer,Irrigation Division, Malappuram
o/o the Executive Engineer,Irrigation Division, Malappuram
Protecting the banks of Velliyar river at Downstream of Maniyaneerikadavu check dam and Construction of Bathing Ghat at DS right bank Melattur and Keezhattur Panchayath in Malappuram District.General Civil Work 1
2026_Irrig_846031_1
IRR/IA/TR/789/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Maniyaneerikkadavu
Pls refer SBD
12 documents required · 12 mandatory
₹2,760
₹50,000
6 Jun 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
19 Mar 2026
10 Mar 2026
10 Mar 2026 - 19 Mar 2026
Side Protection
60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1429118.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1429118.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 4.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .