| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAdmitted-Finance | ₹30.3 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Finance VILL PO KARASA TEHSIL ROHRU DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 170009 | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Chitar Singh L1 |
|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc.(in pipes and pits) in all kinds of soils such as pick work, jumper work, blasting in soft/hard rock, chiselling/wedging out of rock/where blasting prohibited) saturated soil stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer –in-charge in all leads and lifts. | 47.04 | cum | 300 ₹14,112 |
| 2.00 | Providing and laying cement concrete 1:5:10 (1 Cement: 5 Sand:10 Graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work foundation and plinth complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 16.59 | cum | 5,500 ₹91,245 |
| 3.00Providing and laying cement concrete work using concrete mix of "M-20" ( 1:1.5:3 ) graded stone aggregate 20mm & down gauge nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | ||||
| 3.01 | Foundation,footing,bases of columns & the like & mass concrete complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 21.37 | cum | 8,500 ₹1.8 L |
| 3.02 | Columns,pillars,posts & struts upto floor two level complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 3.97 | cum | 8,500 ₹33,745 |
| 4.00 | Brick work using common burnt clay building bricks (IInd class) in super structure above plinth level upto floor two level in cement mortar 1:6 (1cement:6 sand) complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 27.56 | cum | 10,900 ₹3.0 L |
| 5.00 | Providing and Fixing anodised aluminium work (JINDLE MAKE) for door,window,ventilators and partition with extruded built up standard tubular and other sections of approved make confirming to IS 733 and IS 1285 anodised transparent or dyed to required shade according to IS 1868.(minimum anodic coating of grade AC 15) fixed with rawl plug and screws or with fixing clips,or with expansion hold fastener including necessary filling up of gaps at junctions at top,bottom and sides with required PVC.neoprene felt etc. Aluminium section shall be smooth rustfree,straight,mitred and jointed mechanically where ever required including cleast angle,aluminium,snap beading for glazing/panelling C.P. brass/stainless steel screws . All complete as per architectural drawings and the complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 84.81 | Kg. | 399 ₹33,839.19 |
| 6.00 | Providing and fixing anodized aluminium shutters of doors,windows & ventilators including providing and fixing hinges/pivots and making provision for fixing of fittings whereever required including the cost of PVC/neoprene gasket as required (fittings and glazing/panelling shall be paid for separately) complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 63.06 | Kg. | 530 ₹33,421.80 |
| 7.00 | Providingand fixing anodised alluminium wire gauge shutters for doors and windows complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 68.61 | Kg. | 535 ₹36,706.35 |
| 8.00 | P/F aluminium Grills of required pattrens including fixing with steel screws complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 8.22 | Sqm. | 999 ₹8,211.78 |
Tender Value
₹34.0 L
EMD Value
₹68,016
Closing Date
6 Apr 2026, 11:00 amClosed
EE Jal Shakti Division Larji
EE Jal Shakti Division Larji
(SH- C/O Combined pump house along with providing and fixing of electrical fitting of Pump house) Under PDNA
2026_HPIPH_132686_7
EE Larji NIT NO- 15113-15212 dated 27.03.2026
Open Tender
Civil Works
60 days
Bajaura
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
EE Jal Shakti Division Larji
₹68,016
22 May 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Excavation in foundation and trenches etc.(in pipes and pits) in all kinds of soils such as pick work, jumper work, blasting in soft/hard rock, chiselling/wedging out of rock/where blasting prohibited) saturated soil stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer –in-charge in all leads and lifts. | ||||||
| 2Providing and laying cement concrete 1:5:10 (1 Cement: 5 Sand:10 Graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work foundation and plinth complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | ||||||
| 3Providing and laying cement concrete work using concrete mix of "M-20" ( 1:1.5:3 ) graded stone aggregate 20mm & down gauge nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | ||||||
| 3.01 | Foundation,footing,bases of columns & the like & mass concrete complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | - | cum | - | - | itemH1Code4 |
| 3.02 | Columns,pillars,posts & struts upto floor two level complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | - | cum | - | - | itemH1Code5 |
| 4Brick work using common burnt clay building bricks (IInd class) in super structure above plinth level upto floor two level in cement mortar 1:6 (1cement:6 sand) complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | ||||||
| 5Providing and Fixing anodised aluminium work (JINDLE MAKE) for door,window,ventilators and partition with extruded built up standard tubular and other sections of approved make confirming to IS 733 and IS 1285 anodised transparent or dyed to required shade according to IS 1868.(minimum anodic coating of grade AC 15) fixed with rawl plug and screws or with fixing clips,or with expansion hold fastener including necessary filling up of gaps at junctions at top,bottom and sides with required PVC.neoprene felt etc. Aluminium section shall be smooth rustfree,straight,mitred and jointed mechanically where ever required including cleast angle,aluminium,snap beading for glazing/panelling C.P. brass/stainless steel screws . All complete as per architectural drawings and the complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | ||||||
| 6Providing and fixing anodized aluminium shutters of doors,windows & ventilators including providing and fixing hinges/pivots and making provision for fixing of fittings whereever required including the cost of PVC/neoprene gasket as required (fittings and glazing/panelling shall be paid for separately) complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | ||||||
| 7Providingand fixing anodised alluminium wire gauge shutters for doors and windows complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | ||||||
| 8P/F aluminium Grills of required pattrens including fixing with steel screws complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | ||||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Form6.pdf
Tender Documents • 0.63 MB
Form8.pdf
Tender Documents • 1.43 MB
Terms.pdf
Tender Documents • 0.42 MB
BOQ_196230.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid