| 1 | L1₹8.9 LAccepted-AOC VELLAPILLIL H NADUKKARA AVOLY PO MUVATTUPUZHA PIN CODE 686670 | ERNAKULAM | KERALA | 686670 | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical KERALA KL | THIRUVANANTHAPURAM | KERALA | 695001 | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | ASHRAF PE L2 | githu vs L1 | Jayaraj M G L3 |
|---|---|---|---|---|---|---|
| 1.00retaining wall | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 33 | cum | 245 ₹8,085 Lowest | 247.06 ₹8,152.98 | 257.63 ₹8,501.79 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.3 | cum | 7,700 ₹25,410 | 7,607.64 ₹25,105.21 Lowest | 7,932.89 ₹26,178.54 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 17 | sqm | 375 ₹6,375 | 370.32 ₹6,295.44 Lowest | 386.16 ₹6,564.72 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 16.5 | cum | 10,100 ₹1,66,650 | 10,058.73 ₹1,65,969.05 Lowest | 10,488.77 ₹1,73,064.71 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 96.8 | sqm | 750 ₹72,600 Lowest | 805.17 ₹77,940.46 | 839.6 ₹81,273.28 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 16.94 | cum | 12,500 ₹2,11,750 | 12,248.52 ₹2,07,489.93 Lowest | 12,772.18 ₹2,16,360.73 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,575 | kilogram | 110 ₹3,93,250 | 107.82 ₹3,85,456.5 | 107.7 ₹3,85,027.5 Lowest |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 24.6 | cum | 720 ₹17,712 | 699.48 ₹17,207.21 Lowest | 729.39 ₹17,942.99 |
Tender Value
₹9.3 L
EMD Value
₹23,296
Closing Date
1 Nov 2025, 3:00 pmClosed
Executive Engineer
O/o the Executive Engineer, LSGD Division, Kakkanad, Ernakulam
Refer tender document
2025_LSGD_805284_2
ET181/DPEKM/EE/LSGD/25-26
Open Tender
Civil Works - Others
Item Rate
180 days
kakkanad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,055
Yes
₹23,296
Yes
6 Jan 2026
25 Oct 2025
3 Nov 2025
25 Oct 2025
1 Nov 2025
25 Oct 2025
Amount
retaining wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
ASHRAF PE (BID ID -2421483)
Jayaraj M G (BID ID -2420080)
Bidder Name
githu vs
ASHRAF PE
Jayaraj M G
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1363308.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewnit.pdf
Tender Documents • 0.03 MB
Requisitionfore-payment.pdf
Tender Documents • 0.17 MB
BOQ_1363308.xls
BOQ • 0.25 MB
viewsbd.pdf
Tender Documents • 1.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .