Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | L1 | Accepted-AOC Accepted lowest amount | |
| 2 | L2₹12.0 L+₹29,392.90 (2.51%)Rejected-AOC | L2 | Rejected-AOC Rejected highest amount | |
| 3 | L3₹12.1 L+₹43,441.54 (3.71%)Rejected-AOC | L3 | Rejected-AOC Rejected highest amount |
Tender Value
₹12.7 L
EMD Value
₹31,777
Closing Date
27 Oct 2022, 5:00 pmClosed
Rijesh A
Assistant Executive Engineer, Irrigation-Mechanical Subdivision, Perumbavoor
GENERAL-PVIP-Repair works and painting to the regulator shutters of bifurcation point at Adiyodi and greasing and oiling of head regulator shutters at Chenkara (Mechanical works) -General Mechanical Work
2022_Irrig_515708_1
IRR/MH/TR/3565/2022_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
270 days
Adiyodi Kothamangalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,777
Yes
27 Nov 2022
13 Oct 2022
31 Oct 2022
13 Oct 2022
27 Oct 2022
13 Oct 2022
13 Oct 2022 - 27 Oct 2022
Amount
Dismantling the existing shutter and hoist with rollers, painting the shutter and hoist and erection of shutter and hoist after patch working and painting
OD5887/2022-2023:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embedded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery labour etc. complete as directed by the departmental officer at the site.(Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80 % )
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
OD5886/2022-2023:Erection of the canal shutter (Up to 2 Tonne weight) /Hoist Bridge /Platform including hand rails . lader etc for the same including, alignment correcting and setting complete including cost of all labour, machinery , incidental and conveyance, lead and lift charges etc complete but excluding cost of material already supplied.
Replacing the existing rubber seal and fixing new one
OD5889/2022-2023:Dismantling the existing rubber seal including cost labour, tools and etc
85.116:Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing
85.118:Supplying and fixing in correct position with specified initial interface L-type / bulb nose rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings
Supply of Materials and Patchwork of shutter
OD5910/2022-2023:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
OD5911/2022-2023:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
OD5909/2022-2023:Patchwork of mechanical structures and accessories as per approved specifications, drawings anddirections of deptl fficer at site including cost of labour, machinery, all leads and lifis, incidental andhandling charges etc complete but excluding cost of material already supplied
Overhauling of roller
OD5940/2022-2023:Dismantling, refitting and overhauling the roller including cost of materials, labour, tools & plants etc complete
OD16125/2022-2023:Supply of Self aligned spherical roller bearing 22314-E including cost of conveyance
Demolishing and concreting
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Overhauling the hoisting mechanism
OD6010/2022-2023:Applying cardium compound on wire rope in sufficient thickness. including cost of all materials, labour etc complete
OD6011/2022-2023:Supply and stacking of New bearing and Sleeve to suit for shaft<br>of diameter 50 mm.
OD6013/2022-2023:Supply of gear oil for top up oil level of reduction gear boxes
OD6014/2022-2023:Replacement of damaged oil seal and drain plug of the reduction gear box, including all material, labour charge, hire charges of plants etc.
OD6015/2022-2023:Overhauling of hoisting unit by replacing damaged plummer block bearing rubber coupling bush, nuts & bolts. Greasing all plummer blocks, pulley, Gears and all other moving parts. Alignment checking & correcting of entire mechanisms. Top up gear oil. Instructions from departmental officers at site. Including cost of materials labour charges etc. (excluding cost of plummer block bearing,gear oil) complete
Greasing the hoisting mechanism, filling gear oil, applying cardium compoundand greasing rollers of Chenkara regulator shutters
OD6022/2022-2023:Applying cardium compound on wire rope in sufficient thickness. including cost of all materials, labour etc complete
OD6023/2022-2023:Supply of gear oil for top up oil level of reduction gear boxes
OD6024/2022-2023:Greasing the roller assembly using Pneumatic greasing machine including cost<br>of all materials, labour and machinery etc. complete
OD6027/2022-2023:Greasing the hoisting mechanism including gears, plummer blocks etc and filling the gear oil in the gear box including cost of materials labour etc complete (Excluind cost of gear oil)
ASHIFUL HAK.C
P.Damodaran, G.R.Industries
Bidder Name
MOHAMMED MUSTHAFA V
P.Damodaran, G.R.Industries
ASHIFUL HAK.C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_739597.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .