Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.4 LAccepted-Finance 3279 1 RANJIT NAGAR NEW DELHI 110 008 | NEW DELHI | NEW DELHI | DELHI | 110008 | 1 | Accepted-Finance QUALIFIED | |
| 2 | 5₹16.8 L+₹4.5 L (36.1%)Accepted-Finance | 5 | Accepted-Finance QUALIFIED | |
| 3 | Rejected-Technical | - | Rejected-Technical ISO CERTIFICATION NOT ATTACHED | |
| 4 | Rejected-Technical | - | Rejected-Technical ISO CERTIFICATION NOT ATTACHED | |
| 5 | Rejected-Technical DOONGERPUR RAMPUR RAMPUR RAMPUR RAMPUR UTTAR PRADESH 244901 | RAMPUR | UTTAR PRADESH | 244901 | - | Rejected-Technical ISO CERTIFICATION NOT ATTACHED |
Tender Value
Refer Docs
Closing Date
13 Mar 2021, 4:00 pmClosed
DFO Kargil
Office of the Divisional Forest Officer Kargil
Design, Supply and installation of Polycarbonate polyhouse (200.00Sqm) at Kurbathang forest Nursery Near Council Secretariat
2021_FEE_2409_1
08-FDK Kargil of 2020-21
Open Tender
Civil Works - Others
Item Rate
60 days
Kargil
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Divisional Forest Officer Kargil
Exempted
18 Mar 2021
1 Mar 2021
15 Mar 2021
1 Mar 2021
13 Mar 2021
1 Mar 2021
Amount
SUPPLY AND INSTALLATION OF : Main Structure: Made of 2m thick, GI HS section, for vertical members, roof truss, horizontal runners etc. including cutting, bended in required shape, complete as per requirements ,47 x 47mm ,38 x38mm,32 x32mm ±1mm Doors: 2.0m x 1.0 mm made of G. Sq. pipe with door closer & all hardware.
SUPPLY AND INSTALLATION OF : Structure Glazing: with 8mm thick triple walled U. V. stabilized poly carbonate sheet fixed with aluminium infra covering strip, thermal insulation by silicon sealant. Roof Screen: 75 / 50 % shading net folding system with gear manually operated.
SUPPLY AND INSTALLATION OF : Fogging System: To increase the humidity up-to 80 % 5% by providing fogging Nozzles hanging types (2.5 x2.5m), with fin discharge (28-30 lh) at 4bar pressure, with pump 1.0 HP Disc filter, water tank capacity 1000 litre.
SUPPLY AND INSTALLATION OF : Benching System: Made of GI sq. pipe 2.5 x 1.0 x 0.75. bench no 16
SUPPLY AND INSTALLATION OF : Control Panel: digital control panel to controls temperature with PT 100 sensors. Slow axial fan: made of stainless-steel blade with 1050 mm with 1250mm with 0.5 KW motor 3 phase,2 nos. Electric Fitting: Complete electrical wiring of green house with copper wire, MCB, main switch, light /power point as per requirement.
Earth Work: excavation in trenches & foundation Foundation: Grouting of side poles (1 ¼ ' x 1 ¼ ' x 2.5' below earth surface in cement concrete 1:2:4(1: cement ,4 coarse sand ,4 stone aggregate) PCC: 1:5:10 in foundation Wall: With cc block / stone in 1:6 CM, all side of the Greenhouse 1.5'above ground level and 1.0' below ground level. Plaster: 15mm thick in 1:4 CM (1 cement, 4 fine Sand) Painting: Painting of walls with 2 or more coat of snow came of approved color/ shade.
star trading corporation
M/s Muzafar Ali
M/S Hamza Ali
INTERSTATE ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_6182.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .