| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.1 LAccepted-AOC THRISSUR THRISSUR KERALA 680582 | THRISSUR | KERALA | 680582 | L1 | Accepted-AOC L1 | |
| 2 | L2₹83.3 L+₹5.0 L (6.39%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | l3₹89.0 L+₹10.7 L (13.7%)Rejected-AOC | l3 | Rejected-AOC L3 |
Tender Value
₹83.3 L
EMD Value
₹50,000
Closing Date
1 Apr 2020, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division Thrissur
GENERAL EDUCATION DEPT ANNUAL PLAN 2019 20 CONSTRUCTION OF SCHOOL BUILDING FOR G H S S FOR HIGH SCHOOL WING MARATHAMKODE KUNNAMKULAM THRISSUR
2020_PWD_351894_1
110/19-20/EE
Open Tender
Civil Works - Buildings
Item Rate
365 days
Marathamkode
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
online
₹50,000
Yes
14 Sept 2020
19 Mar 2020
4 Apr 2020
19 Mar 2020
1 Apr 2020
19 Mar 2020
Amount
CIVIL WORKS
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.7 : Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.11.1 : Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
5.9.16.1 : Edges of slabs and breaks in floors and wallsUnder 20 cm wide
od50774/2019_2020 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work above plinth level upto floor V level
od50775/2019_2020 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work upto plinth level
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.1 : Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
od50776/2019_2020 : Supplying and fixing press steel door of standard pattern with frame as per profile of IS 4351 of section 105 x 60 mm using 18 G (TATA Galvano) sheet and shutters made of section 75 x 30 cm for outer styles and horizontal members and then inserted with enclosed and stiffened sheet 26 CR as per specified with zinc cromate primer coat measured in sequence metre totally including all charges for fixing handle but hinges etc .complete.
od50777/2019_2020 : Pressed steel window of standard pattern with frame as per profile of IS 4351 of section 105x60mm using 18G (TATA Galvano ) sheet and shutters made of section 75x30cm for outer styles and horizontal members and then inserted with enclosed and stiffned sheet 26CR as per specification with MS plain rod grill work and Zincromate primer coat measured in sequence
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
5.30 : Add for plaster drip course / groove in plastered surface or moulding to R.C.C. projections.Add for plaster drip course / groove in plastered surface or moulding to R.C.C. projections.
od50778/2019_2020 : Supplying water cutting 25 mm wide and 15 mm thick in CM 1:3, including all labour,material, conveyance charges etc complete
13.85.3 : Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile Organic Compound) content.With water thinnable cement primer on walls surface having VOC content less than 50 grams / litre
13.83.2 : Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.Two coats
13.84.2 : Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.Two coats
11.41.2 : Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm.
10.28 : Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
50.10.1 : Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
od50780/2019_2020 : Providing corrugated G.I. hard colour powder coated trafford sheet 0.4 mm thick roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces),excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
od50781/2019_2020 : supplying and fixing granite stone on which the matter engraved, the cost including all labour,materials,conveyance etc complete as per the direction of the engineer at site.
od50782/2019_2020 : supplying and fixing foundation stone with engraving the matter,including the labour,material,coveyance charges etc complete as per direction of engineer at site.
od50784/2019_2020 : Painting letters of 23cm, 25cm,30cm hight (Block, Rommon, Italic or Indian ) with synthetic enamal paint including all cost of materials labourcharges scaffolding,conveyance etc. complete. <br>
Ashin Dev
V P ANTHONY
Bidder Name
V P ANTHONY
P C Devassy
Ashin Dev
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_494337.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .