Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹63.5 L
EMD Value
₹63,600
Closing Date
30 Nov 2026, 3:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Improvement of road of Sai Vihar, KIIT area and Pragati Vihar area in Ward No. 06
2026_ORULB_146024_2
BMC-EE-Tender Cell-91/2026-27 dt. 11.11.2026
Open Tender
Civil Works - Roads
Percentage
180 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹63,600
Yes
Office Chamber of EE(Central Tender Cell)
13 Nov 2026
13 Nov 2026
30 Nov 2026
13 Nov 2026
30 Nov 2026
13 Nov 2026
13 Nov 2026 - 19 Nov 2026
19 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantalling & removing of Cement Concrete under 3.00mt.height for re-use and depositing the same within 5.00m lead and 1.50mt lift etc complete as per the direction of EIC | 63.56 | Cum | 877.16 | ₹55,752.29 |
| 2 | Earth work in ordinary soil within all leads and lifts dressing and levelling the bed & despositing the excavated materials away from site all labour T& P complete as per the direction of the Engineer-in-charge | 72 | Cum | 175.43 | ₹12,630.96 |
| 3 | Earth work excavation in Hard soil using one cum Bucket Hydraluc Excavator with all leads and lifts and transpotation of excavated material by mechcanical means. and direction of Engg -in- charge | 326.32 | Cum | 209.95 | ₹68,510.88 |
| 4 | Earthwork in excavation in hard soil for foundation including moorum with boulders except sheet rock and boulders requiring blasting including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with initial lead of 0.50 m and initial lift of 1.5m as per direction of E-I-C | 17.14 | Cum | 282.89 | ₹4,848.73 |
| 5 | Supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C | 138.81 | Cum | 588.9 | ₹81,745.21 |
| 6 | Cement concrete in prop. (1:4:8) in foundation using 4 cm size HGCB metal of quality from approved quarry washed and cleaned including hoisting, lowering, laying concrete, ramming, watering, curing etc to required level lincluding cost, conveyance, royalties and taxes of all materials, shoring, shuttering and dewatering with cost of all labours, hire and running charges of washing pumps, sundries and T & P such as concrete mixer, concrete vibrator required for the work etc, complete as per specificationand direction of E-I-C | 215.01 | Cum | 5,856.51 | ₹12,59,208.22 |
| 7 | Providing and Laying Factory made Chamfered edge Cement Concrete Paver Blocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Direction of Engg -In -Charge. 80mm thick C.C. Paver Blocks of M-40 grade With approved colour design Pattern etc complete as per direction of EIC. | 1,861.6 | Sqm | 608.4 | ₹11,32,597.44 |
| 8 | Labour for scrapping, cleaning the road surface applying tack coat using 3.00 Kg of bitumen for 10M2 and laying 75 mm. thick built up spray grouting in two layers 37.50 mm. thick each layer using 0.45 Cum of 25 mm. to 40 mm. size hard grauite metal and 12.00 kg penetration grade of bitumen for 10.00M2 in each layer with 0.12 Cum of 12 mm. chips as key stone for 10M2 spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with P.R.R. including hire and running charges of P.R.R and all other machineries but including costs and conveyance of bitumen metal and chips as per specification and direction of Engineer-in-charge. | 150 | Sqm | 762.61 | ₹1,14,391.5 |
| 9 | Surface dressing of earth work in ordinary or hard soil in road formation according to the direction of the department including cutting or filling earth upto 0.15m depth of surface etc. as required for the work complete as directed by the Engineer-in-charge. | 150 | Sqm | 199.38 | ₹29,907 |
| 10 | R.C.C. work of M20 grade with 20 mm down graded chips (C.B.) including hoisting & laying etc compete of all materials to work site as per specification approved by the department & direction of Engg-in-charge. | 54.15 | Cum | 6,201.98 | ₹3,35,837.22 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
DTCN_91.pdf
Tender Documents • 0.96 MB
BOQ_620425.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .