Tender Value
₹4.1 L
EMD Value
₹8,296
Closing Date
20 Jul 2026, 3:00 pm
Chief Executive Officer
O/O CEO MNP
Const.of Community hall at Tulabagan near the land of Nirmal Sarkar of Ward no.14 under Mohanpur Municipal Council during the year 2026-27.
2026_Urban_74463_1
14/MMC/MNP/2026-27 dt,02/07/2026
Open Tender
Civil Works
180 days
Asper DNIT
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹8,296
7 Jul 2026
7 Jul 2026
20 Jul 2026
7 Jul 2026
20 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil cum | 14.41 | cum | 231.6 | ₹3,337.59 |
| 2 | Supplying and filling in plinth, under floor, foundations etc.with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | 1,177.3 | ₹1,176.12 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering - -All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | cum | 8,980 | - |
| 4 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | - | kg | 103.9 | - |
| 5 | Centering shuttering including struttings, propping etc.and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank | - | sqm | 333.9 | - |
| 6 | Centering shuttering including struttings, propping etc.and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 1 | sqm | - | - |
| 7 | Centering shuttering including struttings, propping etc.and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | 1 | sqm | 570 | ₹569.43 |
| 8 | Centering shuttering including struttings, propping etc.and removal of form work for: Suspended floors, roofs, landings, balconies and accessplatform with timber planks | - | sqm | 577.1 | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) cum | 1 | cum | 11,080.4 | ₹11,069.32 |
| 10 | Reinforced cement concrete work in walls (anythickness), including attached pilasters, buttresses,plinth and skirting courses, fillets, columns, pillars,piers, abutments, posts and struts etc. upto floor fivelevel excluding cost of centring, shuttering, finishing and reinforcement- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 10,461.4 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
DNIeT14.pdf
Tender Documents • 4.09 MB
BOQ_75792.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid