Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC P O BINNAGURI 735203 DISTT JALPAIGURI W B | JALPAIGURI | WEST BENGAL | 735203 | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹23.8 L+₹34,776.45 (1.49%)Rejected-Finance PO PS BANARHAT DIST JALPAIGURI PIN 735202 W B | JALPAIGURI | WEST BENGAL | 735202 | L2 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 3 | L3₹2.5 L−₹20.9 L (89.3%)Rejected-Finance GARRISON ENGINEER GE NORTH BINNAGURI | JALPAIGURI | WEST BENGAL | 735232 | L3 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | Shri Amarnath Sah L3 | M/s Om Prakash Agarwala L2 | BBKundu L1 |
|---|---|---|---|---|---|---|
| 1.00 | Disconnecting all in coming and outgoing cables capacity of 400 to 500 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.
(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | 1 | EACH JOB | 7,500 ₹7,500 | 5,000 ₹5,000 Lowest | 7,999 ₹7,999 |
| 2.00 | Disconnecting all in coming and outgoing cables capacity of 200 to 315 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.
(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | 2 | EACH JOB | 6,500 ₹13,000 | 4,300 ₹8,600 Lowest | 6,999 ₹13,998 |
| 3.00 | Disconnecting all in coming and outgoing cables capacity of 100 to 150 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.
(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | 2 | EACH JOB | 5,500 ₹11,000 | 3,600 ₹7,200 Lowest | 5,999 ₹11,998 |
| 4.00 | Draining out all the transformer oil ,dismantling and inspection of transformer core and winding including taking out burnt out winding/insulation of LV / HV strips/coils , Reassembling of core and winding, drying out in vacuum chamber till specified IR values are obtained and providing new insulation materials, gasket, nuts , bolts, checking of leakages and rectifying the same by welding etc and replacement of silica gel for distribution transformer of capacity 400 to 500 KVA 11000/433, complete all as specified and as directed.
Note: (i) Materials required such as winding, LV/HV bushes, Silica gel breather etc will be measured and paid separately.
(ii) Cost of trnasormer oil for cleanaing by hosing down shall be deemed include in the Quoted rate .
(iii) Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side and ATC horn surge arrester for replacement shall be measured and paid separately under relevant item. | 1 | EACH JOB | 7,000 ₹7,000 | 4,800 ₹4,800 Lowest | 6,999 ₹6,999 |
| 5.00 | Draining out all the transformer oil ,dismantling and inspection of transformer core and winding including taking out burnt out winding/insulation of LV / HV strips/coils , Reassembling of core and winding, drying out in vacuum chamber till specified IR values are obtained and providing new insulation materials, gasket, nuts , bolts, checking of leakages and rectifying the same by welding etc and replacement of silica gel for distribution transformer of capacity 200 to 315 KVA 11000/433 Volt, complete all as specified and as directed.
Note: (i) Materials required such as winding, LV/HV bushes, Silica gel breather etc will be measured and paid separately.
(ii) Cost of trnasormer oil for cleanaing by hosing down shall be deemed include in the Quoted rate .
(iii) Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side and ATC horn surge arrester for replacement shall be measured and paid separately under relevant item. | 2 | EACH JOB | 6,000 ₹12,000 | 4,300 ₹8,600 Lowest | 5,999 ₹11,998 |
| 6.00 | Draining out all the transformer oil ,dismantling and inspection of transformer core and winding including taking out burnt out winding/insulation of LV / HV strips/coils , Reassembling of core and winding, drying out in vacuum chamber till specified IR values are obtained and providing new insulation materials, gasket, nuts , bolts, checking of leakages and rectifying the same by welding etc and replacement of silica gel for distribution transformer of capacity 100 to 150 KVA 11000/433 Volt, complete all as specified and as directed.
Note: (i) Materials required such as winding, LV/HV bushes, Silica gel breather etc will be measured and paid separately.
(ii) Cost of trnasormer oil for cleanaing by hosing down shall be deemed include in the Quoted rate .
(iii) Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side and ATC horn surge arrester for replacement shall be measured and paid separately under relevant item. | 2 | EACH JOB | 5,000 ₹10,000 | 3,600 ₹7,200 Lowest | 54,999 ₹1,09,998 |
| 7.00 | Supply and winding of 11/0.433 KVHV coils,using new copper wire/strip of proper size including insulating materials (double insulation)as per existing size of core of transformer complete incl heating, complete all as specified and as directed. | 250 | KG | 1,550 ₹3,87,500 | 1,050 ₹2,62,500 Lowest | 1,349 ₹3,37,250 |
| 8.00 | M & L for winding off 11/0.433 KV LV coils coils,removing U/S insulating materials, double reinsulation with insulating papers using same copper strip and rewinding as per existing size of core of transformer, complete all as specified and as directed. | 165 | KG | 625 ₹1,03,125 | 480 ₹79,200 | 409 ₹67,485 Lowest |
| 9.00 | Supply only breather assembly of approved make filled with silica gel suitable for distribution transformer of capacity 100 to 150 KVA Volt, complete all as specified and as directed. | 2 | EACH | 1,500 ₹3,000 | 1,000 ₹2,000 Lowest | 1,509 ₹3,018 |
| 10.00 | Supply only breather assembly of approved make filled with silica gel suitable for distribution transformer of capacity 200 to 315 KVA Volt, complete all as specified and as directed. | 3 | EACH | 1,800 ₹5,400 | 1,400 ₹4,200 Lowest | 1,609 ₹4,827 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
3 Jun 2026, 6:00 pmClosed
CWE BINNAGURI
HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232
REPAIR/MAINT OF EXTERNAL HT ELECTRIFICATION NETWORKS, HT CABLE, HT EQUIPMENTS AND CONNECTED ITEM AT NORTH ZONE AREA UNDER GE (N) BINNAGURI
2026_MES_765118_1
8368/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE NORTH BINNAGURI
AS PER NIT
8 documents required · 8 mandatory
₹500
GE NORTH BINNAGURI
₹60,000
Yes
1 Jul 2026
13 May 2026
5 Jun 2026
13 May 2026
3 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting all in coming and outgoing cables capacity of 400 to 500 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.
(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | 1 | EACH JOB | 1 | ₹1 |
| 2 | Disconnecting all in coming and outgoing cables capacity of 200 to 315 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.
(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | 2 | EACH JOB | 1 | ₹2 |
| 3 | Disconnecting all in coming and outgoing cables capacity of 100 to 150 KVA 11000/433 Volt Distribution transformer and removing the transformer from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the bushes / bus bars, using insulation tape and testing complete all as specified and as directed.
(Note:- Gasket set, LT/HT side ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil shall be measured and paid separately in respective items.) | 2 | EACH JOB | 1 | ₹2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
8368TENDERDOCUMENTS.pdf
Tender Documents • 1.01 MB
BOQ_856945.xls
BOQ • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .