| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance | L1 | Accepted-Finance BID IS ACCEPTED DUE TO L1 | |
| 2 | L2₹3.7 L+₹787.46 (0.21%)Rejected-Finance | L2 | Rejected-Finance BID IS REJECTED DUE TO L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical BID IS REJECTED DUE TO NOT QUALIFIED IN TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | JAI LAXMI CONTRACTOR L2 | M/S ARYA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. | 82.64 | CUM | 65 ₹5,371.67 Lowest | 65 ₹5,371.67 Lowest |
| 2.00 | Supply and laying of Ordinary Sand till GL for easily abd early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work. | 3.38 | CUM | 1,390 ₹4,691.25 | 1,200 ₹4,050 Lowest |
| 3.00 | RCC 1:2:4 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge. | 9.49 | CUM | 5,598 ₹53,119.42 Lowest | 5,598 ₹53,119.42 Lowest |
| 4.00 | RCC 1:1.5:3 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge. | 12.04 | CUM | 6,534.1 ₹78,703.24 | 6,534 ₹78,702.03 Lowest |
| 5.00 | Centering & shuttering fo C.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 45.25 | SQM | 417 ₹18,868 Lowest | 417 ₹18,868 Lowest |
| 6.00 | Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 44.66 | SQM | 685 ₹30,595.53 Lowest | 685 ₹30,595.53 Lowest |
| 7.00 | Cutting, Bending, Binding & Placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion materials, labour and T&P etc. | 0.41 | MT | 73,876 ₹30,067.53 Lowest | 73,876 ₹30,067.53 Lowest |
| 8.00 | Providing & fixing of NP-3 hume pipe of 1000 mm dia including cost of all material, labour,carriage, loading, unloading etc. complete as directed by engineer in charge | 22.5 | RM | 6,667 ₹1,50,007.5 Lowest | 6,667 ₹1,50,007.5 Lowest |
| 9.00 | Supplying & Fixing B.M. plate 150 X 150 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. | 1 | NOS | 570 ₹570 | 500 ₹500 Lowest |
| 10.00 | Supplying & Fixing Marble Name & year plate 450 X 300 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. | 1 | NOS | 675 ₹675 | 600 ₹600 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
30 May 2026, 11:00 amClosed
EE, MGCCD 14, GARHMUKTESHWAR
EE, MGCCD 14, GARHMUKTESHWAR
7 CONSTRUCTION OF PIPE SYPHON AT KM. 15.620 OF HASANPUR DY
2026_UPIDC_1144240_9
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
90 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹18,000
Yes
9 Jun 2026
23 May 2026
30 May 2026
23 May 2026
30 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. | 0.4 | CUM | 100 | ₹40 |
| 2 | Supply and laying of Ordinary Sand till GL for easily abd early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work. | - | CUM | 100 | - |
| 3 | RCC 1:2:4 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge. | - | CUM | 10 | - |
| 4 | RCC 1:1.5:3 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge. | 1 | CUM | 10 | ₹9.99 |
| 5 | Centering & shuttering fo C.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 1 | SQM | 10 | ₹9.99 |
| 6 | Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. | 1 | SQM | 10 | ₹9.99 |
| 7 | Cutting, Bending, Binding & Placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion materials, labour and T&P etc. | - | MT | 10 | - |
| 8 | Providing & fixing of NP-3 hume pipe of 1000 mm dia including cost of all material, labour,carriage, loading, unloading etc. complete as directed by engineer in charge | - | RM | 10 | - |
| 9 | Supplying & Fixing B.M. plate 150 X 150 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. | - | NOS | 10 | - |
| 10 | Supplying & Fixing Marble Name & year plate 450 X 300 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. | - | NOS | 10 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.72 MB
7.pdf
Tender Documents • 2.37 MB
BOQ_2158509.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .