Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹120.3 CrAccepted-Finance C 1M SEC 133 WISH TOWN NOIDA GAUTAM BUDDH NAGAR UTTAR PRADESH 201 304 | ₹120.3 Cr | L1 | Accepted-Finance Being L1 Bidder |
| 2 | L2₹121.6 Cr+₹1.3 Cr (1.05%)Rejected-Finance NIRJULI SHORT CUT PO PS NIRJULI PAPUM PARE ARUNACHAL PRADESH 791109 | NIRJULI | PAPUM PARE | ARUNACHAL PRADESH | 791109 | ₹121.6 Cr+₹1.3 Cr (1.05%) | L2 | Rejected-Finance Being L2 Bidder |
| 3 | L3₹123.0 Cr+₹2.7 Cr (2.23%)Rejected-Finance SHREE HEERA DHAM BATHAIN ROAD KOSHI KALAN 281403 MATHURA UTTAR PRADESH | MATHURA | UTTAR PRADESH | 281403 | ₹123.0 Cr+₹2.7 Cr (2.23%) | L3 | Rejected-Finance Being L3 Bidder |
| 4 | L4₹128.5 Cr+₹8.2 Cr (6.81%)Rejected-Finance | ₹128.5 Cr+₹8.2 Cr (6.81%) | L4 | Rejected-Finance Being L4 Bidder |
| 5 | L5₹132.3 Cr+₹12 Cr (9.98%)Rejected-Finance | ₹132.3 Cr+₹12 Cr (9.98%) | L5 | Rejected-Finance Being L5 Bidder |
| Sl No | Description | Qty | Unit | Mayasheel Ventures Limited L9 | MS. INDIRA TECHI L6 | Kram Infracon Private Limited L1 | TTC INFRA INDIA L5 | MKC Infrastructure Ltd L8 | MS GANESH RAM DOKANIA L7 | Ganpati Bharat Private Limited L4 | M/s Nabam Tullon LLP L2 | Shree Girrajjee Infra Heights Private Limited L3 | Bhartia Infra Projects Ltd L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | WIDENING/IMPROVEMENT OF ROAD DITTE-DIMME-MIGGING ON ROAD BETWEEN KM 53+00 TO KM 92+25 DESIGN CHAINAGE KM 51+015 TO 87+740 (DESIGN LENGTH 36.725 KM) FROM CL-09 TO NHDL SPECIFICATION UNDER 105 RCC/761 BRTF IN AOR OF (P) BRAHMANK IN ARUNACHAL PRADESH ON EPC MODE | 1 | Nos | 1,54,52,00,000 ₹1,54,52,00,000 | 1,34,20,00,001 ₹1,34,20,00,001 | 1,20,30,00,000 ₹1,20,30,00,000 Lowest | 1,32,30,00,000 ₹1,32,30,00,000 | 1,53,83,00,000 ₹1,53,83,00,000 | 1,46,90,59,000 ₹1,46,90,59,000 | 1,28,49,00,000 ₹1,28,49,00,000 | 1,21,56,78,240 ₹1,21,56,78,240 | 1,22,98,11,000 ₹1,22,98,11,000 | 1,82,00,00,000 ₹1,82,00,00,000 |
Tender Value
₹211.7 Cr
EMD Value
₹2.1 Cr
Closing Date
23 Apr 2026, 11:00 amClosed
Chief Engineer Project Brahmank
HQ Chief Engineer Project Brahmank Passighat, East Siang (AP)
WID IMPVT OF RD DDM BET KM 53 TO KM 92.25 DESIGN CHAINAGE KM 51.015 TO 87.74 DESIGN LENGTH 36.725 KM FROM CL 09 TO NHDL SPECN UNDER 105 RCC 761 TF IN AOR OF PROJECT BMK IN AP ON EPC MODE
2026_BRO_754982_1
CE (P) BMK/EPC/01/2025-26
Open Tender
Civil Works - Roads
Lump-sum
730 days
DDM Road
As per RFP
4 documents required · 4 mandatory
₹35,400
Chief Engineer Project Brahmank
₹2.1 Cr
HQ Chief Engineer Project Brahmank Pas
18 Aug 2026
2 Mar 2026
24 Apr 2026
2 Mar 2026
23 Apr 2026
26 Mar 2026
3 Mar 2026 - 26 Mar 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | WIDENING/IMPROVEMENT OF ROAD DITTE-DIMME-MIGGING ON ROAD BETWEEN KM 53+00 TO KM 92+25 DESIGN CHAINAGE KM 51+015 TO 87+740 (DESIGN LENGTH 36.725 KM) FROM CL-09 TO NHDL SPECIFICATION UNDER 105 RCC/761 BRTF IN AOR OF (P) BRAHMANK IN ARUNACHAL PRADESH ON EPC MODE | 1 | Nos | 100 | ₹100 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
DCAFinal.pdf
Tender Documents • 3.97 MB
DESIGNREPORT.pdf
Additional Documents • 12.03 MB
BOQ_845609.xls
BOQ • 0.27 MB
RFP.pdf
Tender Documents • 21.80 MB
amdt.pdf
PDF • 0.34 MB
Main12.pdf
PDF • 8.33 MB
Main11.pdf
PDF • 23.41 MB
DWGVol2.pdf
PDF • 29.30 MB
DWGPNP.pdf
PDF • 28.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .