Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | Admitted-Finance |
| 5 | Admitted-Finance 4 9 JAMBULINGAPURAM K VELAYUTHAPURAM POST KALUGUMALAI VIA KOVILPATTI TK TUTICORIN 628 552 | TUTICORIN | TUTICORIN | TAMIL NADU | 628552 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
15 Mar 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE GL GCC TRICHY
O/o. SE GCC TRICHY
Introduction of 1 No KCO 9M tower Between Loc 3 and 4 in the proposed strengthening of 110 KV LILO of Trichy Samayapuram 110KV line to kambarasampettai 110 KV SS under DCW basis
2024_EB_432081_1
GCC 057 GL 013 2023 2024
Open Tender
Civil Works
Works
90 days
Kambarasampettai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,000
Yes
4 Apr 2024
29 Feb 2024
16 Mar 2024
29 Feb 2024
15 Mar 2024
29 Feb 2024
Amount
Conducting check survey,fixing of location and pit marking for tower foundation as per the approved profile cost of survey equipment tools & plants including cost of all T & Ps, transport, labour, lead lift etc complete as directed by engineer.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in SDR not requiring blasting inlcuding all cost of lead lift etc complete.
Earthwork excavation in MR & DMR requiring blasting inlcuding all cost of lead lift etc complete.
Earthwork excavation in Hard rock mearured in solid including blasting & stacking inlcuding all cost of lead lift etc complete.
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of template labour, fabrication charges etc complete.(KCO tower with or with out extension) .
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges,labour, fuel, oil, transport etc complete.
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
PCC1:3:6 using 20mm metal for foundationfor tower concrete with out form work including cost of all materials, lead, lift , etc complete .
PCC1:2:4 using 20mm metal for foundation for tower concrete with form work including cost of all materials, lead, lift , etc complete .
Refilling with the excavated earth other than sand including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete. KCO tower
supply & Providing earthing as per approved specification and as directed by the site engineer including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Removal of surplus earth whereever necessary including transport up to 2KM away from the site ,loading & unloading etc complete.
Labour & Transport and erection of GI tower parts including in accordance with boards design as per drawing & tightening punching of bolt & nuts transport charges to each location ,final checking cost of T &P,labour, lead, lift etc complete . ( Under LC)
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete
Painting with two coats of using best quality anticorrosive paint over tower leg at a height of 1.00m above coping including cost of all materials,labour, lead lift etc complete in all respects.
Providing welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level 1 cm each side at two places opposite to each other after tightening and punching of bolt & nuts including painting the welded portion of bolt and nuts two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost ofwelding rod ,hire charges of diesal generator and welding transformer, paint and all T & P including cost of all materials labour,lead, lift etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN disc insulators from department store with supply & fixing of suspension fitting for panther with all allied hard ware fittings including transport T & P including all cost of labour, lead, lift, T & P etc complete without PA rod for panther
Labour charges for transporting and hoisting of 7 units of 90 KN disc insulators from department store with supply & fixing of suspension fitting for panther with all allied hard ware fittings including transport T & P including all cost of labour,lead, lift, T & P etc complete with PA rod for panther
Labour charges for transporting and hoisting of 8units of 120 KN disc insulators from department store with supply & fixing of Single tension fitting SB damper with all allied hard ware fittings including transport T & P including all cost of labour,lead, lift, T & P etc complete
Labour charges for stringing of 6 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles, paying out, jointing, rough sagging, tensioning, clipping, Supply of hardware fitting providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P, moving the drum to work spot all labour, lead, lift, etc complete in all respects. (under LC)
Releasing, lowering and restringing of existing OPGW 48fiber with all acessories including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete. (under LC)
supply & transport & Labour charges for fixing of Number Plate , Danger Board ,Phase plate set of three in tower as directed by the engineer at site including all cost of labour transport, lead, lift, etc complete.
Supply,fabrication and fixing of name board with 18 gauge plate with one coat red oxide and two coat enamel paint for back ground lettering with enamel of approved colour fixing in tower as directed all materials labour,lead, lift, etc, complete .for name board size approved by the engineer incharges of works.
Providing temporary guys with steel wires and turn buckles including necessary excavation for fixing RSJ/rail bit or concrete blocks for anchorage dismantling after after completion of stringing works including cost of all materials, lead, lift, labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete
Labour charges for removal of Small trees
Clearing Juliflora jungle including all cost of labour, lead, lift etc complete.
Providing special type trussels forP&T,road crossing during stringing work with casurina props so as to avoid accident and dameges to conductor and earth wire on both side of crossing including cost of all materials,labour, lead lift etc. Complete in all respects.
Labour charges for Dismantling of existing 6 wire leopard conductor and devlouted to store including cost of all materials,T &Ps lead, lift ,etc., complete. (under LC )
Relasing & lowering and restringing of existing 6 wire leopard conductor including cost of all materials, T &Ps lead, lift ,etc., complete. (under LC )
Lowering & dismantling of tension insulators (8 units) with fitting and devlouted to store including cost of all major & minor T & P with all lead,lift etc complete. (Under LC)
Labour charges for Dismantling the existing tower in complete member by member to devlouted to store including cost of all materials, T &Ps lead, lift ,etc., complete including cost of all materials, T &Ps lead, lift etc., complete. (under LC)
Releasing & lowering and rehoisting of 7 units of single suspension insulators with fittings including all cost of labour,lead, lift, T & P etc complete.
Releasing & lowering and rehoisting of 8 units of single suspension insulators with fittings including all cost of labour,lead, lift, T & P etc complete .
Applicable GST 18%
Samsudeen
s.velusamy contractor
Haribalakrishnan
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
M.S.Gnanam
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .