Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹14.7 Cr
EMD Value
₹29.4 L
Closing Date
5 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
GSU
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where Y= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments'' in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. The tenderer are required to upload "Work Completion certificates" in support of Technical Criteria to prove their suitability as per Annexure B of tender document as detailed in Para 10.00 of TENDER DOCUMENT
Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate
Defination of Similar Work :- Any Civil Engineering work involving PCC/RCC/PSC work.
42 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Labour Cooperative Societies shall submit only 50% of bid security for which the tenderers are required to upload Registration certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that -" We are a Labour Cooperative Society and our Registration No. is .................... with .......................and hence required to deposit only 50% of Bid Security
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security on submission of Registration Certificate issued by appropriate authority. For such firms it is required to upload a copy of Registration Certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that - I/We am/are a Startup firm registered by ........................ Department of Industrial Policy and Promotion (DIPP) and my registration number is ................ valid upto ...................... (Copy enclosed) and hence exempted from submission of Bid Security.
THE OFFERS WITHOUT EARNEST MONEY EXCEPT IN CASE OF EXEMPTION CLAIMED AS PER COMMERCIAL COMPLIANCE OF NIT WILL BE SUMMARILY REJECTED.
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: (1) scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender (2) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e excluding the last date of submission of bids).The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e excluding the last date of submission of bids).
For tenders having advertised value more than Rs. 10 crore wherein eligibility criteria includes bid capacity also, the tenderer will be qualified only if its available bid capacity is equal to or more than the total bid value of the present tender. Annexure VI of GCC April 2022 and Advance Correction Slip No.11 (Rly. Board letter No.2022/CE-I/CT/GCC2022/Policy/Pt.I (E- 3320424) Dated 13.03.26
The quantities shown above are approximate and to give a General guideline Railway reserves the right to increase or decrease or to delete any of the items
All rates quoted in the tender shall be deemed to be inclusive of all Taxes royalties payable by the contractor s to the Government or public body or local authority and no additional amount will be paid or claim entertained on this account by the Railway
It is responsibility of the tenderer that they ensure to see any corrigendum of the tender to check the corrigendum on the website from time to time
General arrangement drawing for the work can be seen in the office of the Dy. CE/GSU & XEN/GSU Kota office Western Central Railway at any time during the office hours These drawing are only for the guidance of contractors Detailed working drawing if required based generally on the drawing mentioned above and various conditions mentioned in tender documents shall be submitted by the tenderer for approval of the same by Railway
If any partner(s) of a partnership firm expires after the submission of its tender or after the acceptance of its tender, the Railway shall deem such tender as cancelled/contract as terminated under clause 61 of the Standard General Conditions of Contract, unless the firm retains its character as per partnership agreement. If a sole proprietor expires after the submission of tender or after the acceptance of tender, the Railway shall deem such tender as cancelled / contract as terminated under clause 61 of the Standard General Conditions of Contract.
The contractor shall employ the following Qualified Graduate Engineer during execution of the alloted work a One Qualified Graduate Engineer when cost of work is to be executed is Rs 200 lakh and above, and b One Qualified Diploma Holder Engineer when cost of work to be executed is more than Rs 25 lakh, but less than Rs 200 lakh In case the Contractor fails to employ the Qualified Engineer as above shall be liable to pay an amount of Rs 40000.00 and Rs 25000.00 for each month or part thereof for the default period for the provisions
It is the responsibility of the Contractor to arrange the Payment of the labour employed for the work through Bank as per Minimum Wages Act
Price Variation Clause (PVC) shall be applicable only in tender having advertised value above Rs. 2 Crores (GCC-JLUY-2022- Advanced Correction Slip no-1).
I n case o f a n y wrong information submitted b y tenderer, the contract shall be terminated, Earnest Money Deposit (EMD), Performance Guarantee (PG) and Security Deposit ( S D ) of contract forfeited and agency barred for doing business on for 2 (Two) years.
Contractor is to abide by the provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of Indian Railways General Condition of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The deatils regarding Registration/ up dation of Portal is mentioned in tender document.
ILLEGIBLE DOCUMENTS UPLOADED ARE LIABLE TO BE REJECTED
(a) In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Bid Security besides banning of business for a period of upto five years. (b) In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Bid Security, Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of up to five years.
Indian Railways Standard General Conditions of Contract, April 2022 (GCC, April 2022) with correction slips issued up to date of inviting tender will be applicable for this tender.
Balance Work of Development of infra structure at Hindaun city (HAN) Goods shed.
GSU-KOTA-04R-2026~WCR
GSU-KOTA-04R-2026
Open
Works - General
10 Months
Kota, Rajasthan
₹0
₹29.4 L
10 Oct 2026
10 Oct 2026
22 Oct 2026
195 items across 3 schedules · ₹21,42,130.51 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | cum | — | 120 | 411.3 | 49,356 |
| 2 | cum | — | 240 | 205.45 | 49,308 |
| 3 | cum | — | 9535 | 286.85 | 27,35,114.75 |
| 4 | cum | — | 1720 | 253.95 | 4,36,794 |
| 5 | cum | — | 140 | 368.65 | 51,611 |
| 6 | cum | — | 170 | 104.5 | 17,765 |
| 7 | cum | — | 200 | 2,161.2 | 4,32,240 |
| 8 | Sqm | — | 450 | 28.15 | 12,667.5 |
| 9 | cum | — | 150 | 7,365.15 | 11,04,772.5 |
| 10 | cum | — | 20 | 7,226.95 | 1,44,539 |
| 11 | cum | — | 1736.5 | 6,833.4 | 1,18,66,199.1 |
| 12 | cum | — | 465 | 6,670.25 | 31,01,666.25 |
| 13 | cum | — | 6.8 | 9,375.2 | 63,751.36 |
| 14 | cum | — | 20 | 8,843.45 | 1,76,869 |
| 15 | Sqm | — | 450 | 307.95 | 1,38,577.5 |
| 16 | Sqm | — | 65 | 370.85 | 24,105.25 |
| 17 | cum | — | 95 | 8,364.2 | 7,94,599 |
| 18 | cum | — | 25 | 10,719.3 | 2,67,982.5 |
| 19 | Sqm | — | 2190.5 | 307.95 | 6,74,564.48 |
| 20 | Sqm | — | 4979 | 669.55 | 33,33,689.45 |
| 21 | Sqm | — | 330 | 766.55 | 2,52,961.5 |
| 22 | Sqm | — | 360 | 608.35 | 2,19,006 |
| 23 | Sqm | — | 380 | 804.25 | 3,05,615 |
| 24 | Sqm | — | 5 | 1,580.9 | 7,904.5 |
| 25 | Kg | — | 155300 | 89.65 | 1,39,22,645 |
| 26 | Kg | — | 52400 | 89.65 | 46,97,660 |
| 27 | cum | — | 709.02 | 8,683.8 | 61,56,987.88 |
| 28 | cum | — | 960 | 10,306.2 | 98,93,952 |
| 29 | cum | — | 80 | 8,288.35 | 6,63,068 |
| 30 | Sqm | — | 100 | 837.85 | 83,785 |
| 31 | Sqm | — | 70 | 1,018.05 | 71,263.5 |
| 32 | cum | — | 150 | 8,414.65 | 12,62,197.5 |
| 33 | cum | — | 85 | 8,190.9 | 6,96,226.5 |
| 34 | cum | — | 250 | 7,873.2 | 19,68,300 |
| 35 | cum | — | 370 | 7,676.3 | 28,40,231 |
| 36 | cum | — | 625 | 6,653.45 | 41,58,406.25 |
| 37 | Sqm | — | 50 | 4,425.35 | 2,21,267.5 |
| 38 | Each | — | 7050 | 33.8 | 2,38,290 |
| 39 | Sqm | — | 210 | 6,057 | 12,71,970 |
| 40 | Sqm | — | 390 | 4,898.65 | 19,10,473.5 |
| 41 | Sqm | — | 180 | 1,063.45 | 1,91,421 |
| 42 | Each | — | 2 | 234.9 | 469.8 |
| 43 | Each | — | 2 | 75.55 | 151.1 |
| 44 | Each | — | 4 | 53.25 | 213 |
| 45 | Metre | — | 10 | 408.25 | 4,082.5 |
| 46 | Sqm | — | 10 | 2,455.1 | 24,551 |
| 47 | Sqm | — | 30 | 3,194.4 | 95,832 |
| 48 | Metre | — | 50 | 545.6 | 27,280 |
| 49 | Sqm | — | 25 | 9,642.6 | 2,41,065 |
| 50 | Kg | — | 5300 | 93.05 | 4,93,165 |
| 51 | Kg | — | 65100 | 111.95 | 72,87,945 |
| 52 | Kg | — | 350 | 154.9 | 54,215 |
| 53 | Each | — | 20 | 185.2 | 3,704 |
| 54 | Kg | — | 1450 | 88.5 | 1,28,325 |
| 55 | Kg | — | 2900 | 142.3 | 4,12,670 |
| 56 | Sqm | — | 250 | 545 | 1,36,250 |
| 57 | Sqm | — | 50 | 1,706.6 | 85,330 |
| 58 | Sqm | — | 100 | 935.6 | 93,560 |
| 59 | Sqm | — | 100 | 1,416.65 | 1,41,665 |
| 60 | Sqm | — | 1050 | 3,908.8 | 41,04,240 |
| 61 | Sqm | — | 325 | 2,677.9 | 8,70,317.5 |
| 62 | Metre | — | 3800 | 163.65 | 6,21,870 |
| 63 | Each | — | 30 | 308.45 | 9,253.5 |
| 64 | Metre | — | 250 | 319.75 | 79,937.5 |
| 65 | Each | — | 20 | 132 | 2,640 |
| 66 | Each | — | 22 | 115.95 | 2,550.9 |
| 67 | Sqm | — | 2550 | 671.55 | 17,12,452.5 |
| 68 | Metre | — | 40 | 450.6 | 18,024 |
| 69 | Sqm | — | 300 | 1,948.95 | 5,84,685 |
| 70 | Sqm | — | 400 | 339.7 | 1,35,880 |
| 71 | Sqm | — | 80 | 324.3 | 25,944 |
| 72 | Sqm | — | 40 | 382.1 | 15,284 |
| 73 | Sqm | — | 1200 | 307.25 | 3,68,700 |
| 74 | Sqm | — | 1850 | 214.3 | 3,96,455 |
| 75 | Sqm | — | 150 | 162.55 | 24,382.5 |
| 76 | Sqm | — | 150 | 158.95 | 23,842.5 |
| 77 | Sqm | — | 1850 | 137.85 | 2,55,022.5 |
| 78 | Sqm | — | 425 | 191.4 | 81,345 |
| 79 | Sqm | — | 450 | 121.45 | 54,652.5 |
| 80 | cum 1238.74 | — | — | 2,007.1 | 24,86,275.05 |
| 81 | cum | — | 10 | 1,698.45 | 16,984.5 |
| 82 | Sqm | — | 3000 | 179.65 | 5,38,950 |
| 83 | cum | — | 600 | 219.35 | 1,31,610 |
| 84 | Sqm 1018.15 | — | — | 180.5 | 1,83,776.08 |
| 85 | cum | — | 2250 | 1,937.6 | 43,59,600 |
| 86 | cum 1247.25 | — | — | 1,624.5 | 20,26,157.63 |
| 87 | cum 1467.08 | — | — | 1,837.25 | 26,95,392.73 |
| 88 | cum | — | 186.72 | 888.3 | 1,65,863.38 |
| 89 | cum 5051.05 | — | — | 865.8 | 43,73,199.09 |
| 90 | Sqm | — | 20562 | 21.8 | 4,48,251.6 |
| 91 | cum | — | 180 | 9,492.9 | 17,08,722 |
| 92 | Litre | — | 60990 | 48.15 | 29,36,668.5 |
| 93 | per cm depth per cm width per metre length | — | 39050 | 4.7 | 1,83,535 |
| 94 | per cm depth per cm width per metre length | — | 84400 | 7.5 | 6,33,000 |
| 95 | Sqm | — | 220 | 623.8 | 1,37,236 |
| 96 | cum | — | 40 | 8,613.55 | 3,44,542 |
| 97 | cum | — | 3800 | 8,277.55 | 3,14,54,690 |
| 98 | Sqm | — | 1550 | 1,719 | 26,64,450 |
| 99 | Sqm | — | 3050 | 1,011.2 | 30,84,160 |
| 100 | Sqm | — | 2200 | 2,617.15 | 57,57,730 |
| 101 | Each | — | 4 | 5,781.35 | 23,125.4 |
| 102 | Each | — | 6 | 5,540.55 | 33,243.3 |
| 103 | Each | — | 2 | 1,913.75 | 3,827.5 |
| 104 | Each | — | 8 | 1,679.6 | 13,436.8 |
| 105 | Each | — | 10 | 1,382.3 | 13,823 |
| 106 | Each | — | 2 | 90.95 | 181.9 |
| 107 | Each | — | 2 | 45.25 | 90.5 |
| 108 | Each | — | 2 | 1,411.15 | 2,822.3 |
| 109 | Metre | — | 90 | 1,018.05 | 91,624.5 |
| 110 | Each | — | 2 | 530.7 | 1,061.4 |
| 111 | Each | — | 2 | 671.2 | 1,342.4 |
| 112 | Each | — | 2 | 620.35 | 1,240.7 |
| 113 | Each | — | 2 | 392.9 | 785.8 |
| 114 | Each | — | 2 | 573.6 | 1,147.2 |
| 115 | Metre | — | 12 | 439.9 | 5,278.8 |
| 116 | Metre | — | 12 | 501.6 | 6,019.2 |
| 117 | Metre | — | 20 | 268.2 | 5,364 |
| 118 | Metre | — | 200 | 304.15 | 60,830 |
| 119 | Metre | — | 40 | 373.35 | 14,934 |
| 120 | Metre | — | 100 | 491.2 | 49,120 |
| 121 | Metre | — | 90 | 893.2 | 80,388 |
| 122 | Metre | — | 100 | 267.5 | 26,750 |
| 123 | Metre | — | 200 | 417.95 | 83,590 |
| 124 | Metre | — | 800 | 654.2 | 5,23,360 |
| 125 | Metre | — | 1000 | 919.1 | 9,19,100 |
| 126 | Each | — | 60 | 757.1 | 45,426 |
| 127 | Each | — | 30 | 1,513.7 | 45,411 |
| 128 | Each | — | 10 | 327.95 | 3,279.5 |
| 129 | Each | — | 60 | 532.35 | 31,941 |
| 130 | Each | — | 8 | 461.75 | 3,694 |
| 131 | Each | — | 68 | 878.25 | 59,721 |
| 132 | Each | — | 5 | 2,227.6 | 11,138 |
| 133 | Each | — | 2 | 190.1 | 380.2 |
| 134 | Quintal | — | 4 | 8,191.75 | 32,767 |
| 135 | Metre | — | 280 | 1,210.5 | 3,38,940 |
| 136 | Metre | — | 450 | 1,511 | 6,79,950 |
| 137 | Each | — | 80 | 284.75 | 22,780 |
| 138 | Each | — | 160 | 343.55 | 54,968 |
| 139 | Each | — | 4 | 4,500.25 | 18,001 |
| 140 | Each | — | 4 | 6,661.8 | 26,647.2 |
| 141 | Litre | — | 14500 | 9.7 | 1,40,650 |
| 142 | Each | — | 4 | 109.85 | 439.4 |
| 143 | Each | — | 25 | 143.3 | 3,582.5 |
| 144 | Each | — | 4 | 183.4 | 733.6 |
| 145 | Each | — | 40 | 96.45 | 3,858 |
| 146 | Each | — | 2 | 161.55 | 323.1 |
| 147 | Metre | — | 180 | 902.05 | 1,62,369 |
| 148 | Kg | — | 200 | 564.8 | 1,12,960 |
| 149 | Metre | — | 150 | 592.05 | 88,807.5 |
| 150 | Metre | — | 90 | 1,416.3 | 1,27,467 |
| 151 | Metre | — | 135 | 1,561.7 | 2,10,829.5 |
| 152 | Metre | — | 250 | 951.95 | 2,37,987.5 |
| 153 | cum | — | 35 | 1,302.3 | 45,580.5 |
| 154 | cum | — | 25 | 1,309 | 32,725 |
| 155 | Metre | — | 50 | 2,082.1 | 1,04,105 |
| 156 | Each | — | 2 | 280.95 | 561.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
HANGoodsShedGAD_page-00021.pdf
ATTACHMENT
TENDRDOCUMENTHAN.pdf
ATTACHMENT
HANGOODSSHEDSPECIALCONDITIONS.pdf Special Conditions
ATTACHMENT
ACS-11-GCC-2022.pdf
ATTACHMENT
PCECircular11.pdf
ATTACHMENT
GCC-2022-ACS10_merged_compressed_1.pdf
ATTACHMENT
GCCACS12_compressed.pdf
ATTACHMENT
HANGOODSSHEDSPECIALCONDITIONS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .