Tender Value
₹10.9 Cr
EMD Value
₹3.8 L
Closing Date
1 Oct 2026, 4:00 pm4d left
Additional Chief Engineer (P&C)
Supply, Erection, Testing& Commissioning of 132KV 2x(3+0) 1Cx800sq.mm U/G cable for of 2nd circuit of 132KV D/C Varshamedi-Wankaner line at 132KV Mota Dahisara S/s.(Route Length-1.1Km)
341911
ACE(P&C)/Contracts/E-508/TL/UG/132kV/S&L,E/TN-13
Open
Electrical Works
Works
Vadodara
32 documents required · 27 mandatory · 5 optional
₹11,800
Gujarat Energy Transmission Corporation Vadodara
₹3.8 L
8 Sept 2026
8 Sept 2026
8 Sept 2026
1 Oct 2026
8 Sept 2026
Particulars of Item Unit Supply Qty.
Supply of 76/132 kV(E) 1 core 800 sq. mm.
Aluminium conductor XLPE insulated Copper
1 wire screened,Poly AL-Poly, Aluminium wire Mtr.
armoured,HDPE outer sheathed power cable
AS PER TECHNICAL SPECIFICATION. Drum
length 700 mtr min.
Earthing/Sheath bonding Cable 6.6 kV 1Cx240
sq. mm. Copper conductor,XLPE insulated
cable as per technical specification
Supply of 1Cx240 sq mm Copper conductor,
XLPE insulated Earth continuity cable
connecting earth pit to earth pit (1.1 kV class)
Supply of 132 KV Class-SM 7KJ/KV Lightening
4 Arrestor with required all the accessories and Nos.
clamp and connectors to provide on tower end
5 Supply of Joint suitable for Midpoint bonding Nos.
system/ Cross bonding of screen (required for
sheath voltage control ) including copper casing
for power cable considering 1 no. per cable.
Supply of straight through joint including copper
6 casing for power cable considering 1 no. per Nos.
7 Supply of Dry type self supported End Nos.
Termination for power cable suitable for S/S
end & on tower at appx. 40 Mtr height.
Supply of Three phase & single phase earth
Link Box with SVL
Supply of Three phase & single phase earth
Link Box without SVL
Supply of lattice support structure for 132 kV
cable system at sub-station end
Supply of GI tower material 220 kV DD+3 Mtr
extn. GI Monopole suitable for D/C Cable
termination ( 6 nos cable & including Cable MT.
termination & LA mounting arrangement, ladder
etc in all respect (a)Steel Part (MS)
(b) Steel Part(HT) MT.
12 GI Bolts & nuts MT
Fibre Optic Approach Cable ( DWSM - Dual
window single mode, 48F-2 Run for 132kV
double circuit each) - with installation hardware
like ties / clips / cleats, conduits, HDPE ducts,
supports, fittings, accessories etc).(Supply Part)
Ref. 1) DE(Project) Input Mail on Dt.27.06.2025
R0- Erection Part : 132 kV 2x(3+0) 1Cx800 sq. mm U/G cable laying for LILO of 2nd ckt. of 132kV
D/C Varshamedi-Wankaner line at 132KV Mota Dahisara
(Poly-AL-Poly 800 sqmm). ( From LILO Tower ( DD+3) cable termination tower to 132 kV
Motadahisara SS
Description Unit Quantity
Detailed survey for optimum and most feasible route and preparation of
proposal with all detailing
Under ground laying / installation of 132 KV (E),6 Nos. of 1 core 800 sq.
mm. XLPE insulated Power Cable ,Double circuit(3 Nos./circuit) in
trefoil formation with 2 nos. earth continuity cable ( 1No./circuit) and
FOAC cable (As per Annexure -II) (FOAC cable shall be laid in HDPE
pipe - One pipe per FOAC cable) inclusive of all requisite materials (like
sand, pre cast slabs, trefoil clamps(mounted at min. 3 Mtr spacing), phase
identification tag, pre warning tape, route marker, HDPE pipe etc.),
supervision, testing of installation, pre-commissioning tests etc and
associated civil works with open excavation in any type of soil as per
specs & approved drawing. (GETCO/E/132KV-DC/Cable/01. R0)
--do-- but for Road/Nala Crossing with open excavation and laying NP4
class RCC Hume Pipe 1 no. for each trefoil and laying of cable in HDPE
pipe (min. 0.6 Mpa class) 1 no. per cable in trefoil formation ,FOAC cable
3 (As per Enclosed Annexure-II) (FOAC cable shall be laid NP4 class RCC Mtr.
hume pipe & in 40 mm dia HDPE pipe (min. 0.6 Mpa class) - One pipe per
FOAC cable)as per approved drawing. (GETCO/E/132KV-DC/Cable/01.
--do-- but for Crossing with Trenchless digging and laying of cable in PVC
pipe (min. 0.6 Mpa class) 1 no. per cable and trefoil in HDPE pipe (min.
0.6 Mpa class), FOAC cable (As per Enclosed Annexure-II) (FOAC cable
shall be laid in double HDPE pipe (min. 0.6 Mpa class) - One pipe per
FOAC cable) as per approved drawing. (GETCO/E/132KV-DC/Cable/01.
Laying/dressing of 132 kV (E) 1 core 800 sq. mm. XLPE insulated Power
Cable for Double circuit ( 6 nos, 1 cable per phase) at both
ends inclusive of all requisite materials (like trefoil clamps, phase
identification tag, Ladder etc.), supervision, testing of installation, pre-
commissioning tests etc and associated civil/mechanical works on
overhead line transmission tower structure / Monopole suitable for cable
5 termination including required fabrication work for providing 4 th cross Job
arm, mounting of Surge Arrester,Ladder and End Termination as per
approved drawing and FOAC cable in HDPE pipe as per instruction.Scope
also includes cable protection arrangement at tower base, jumpering works
on tower with supply of required clamps & connectors and reqiured
maintainance free earth pit ( total 6 nos, 3 nos/ckt) with GI earthing strip for
LA & providing tower earthing as per GETCO standard practice.
Installation of Joint suitable for Midpoint bonding system/ Cross bonding of
screen (required for sheath voltage control ) including copper casing for
power cable complete in all respect including required civil works
considering 1 no. per cable
Installation of straight through joint including copper casing for power cable
7 complete in all respect including required civil works considering 1 no. per Nos.
Installation of Composite Dry type Polymeric Premolded End
Termination for power cable complete in all respect with required
8 fabrication on tower side, Scope also includes suitable clamp and Nos.
connectors etc. complete in all respect with providing maintainance free
earthing pit & GI earthing strip of each cable.
Description Unit Quantity
Installation of Composite Dry type Polymeric Premolded End
Termination for power cable complete in all respect with required
fabrication on lattice support structure at S/S end Scope also includes
Civill work for required lattice galvanized structure, suitable clamp and
connectors etc. complete in all respect, providing maintainance free
earthing pit & GI earthing strip of each phase of cable
Installation of Three phase earth Link Box with SVL for each circuit with
10 supply & installation of maintainance free earthing pit per circuit & required Nos.
GI earthing strip including required fabrication of structure, civil work if any.
Installation of Three phase earth Link Box without SVL for each circuit
(Single phase Link box without SVL for spare cable ) with supply &
installation of maintainance free earthing pit per circuit & required GI
earthing strip including required fabrication of structure, civil work if any.
Excavation excluding back filling, but including shoring, shuttering,
dewatering, tree cutting for tower footings, etc. for
(a) Normal soil either dry or wet / sandy soil
(b) Black cotton soil either dry or wet.
(C) Normal Submerge/marine soil where dewatering is necessary
(d) Black cotton Submerge/marine soil where dewatering is necessary
Installation of steel reinfoorcement in concret foundation including supply of
MS bars, binding wire and their cutting,bending, binding & laying in position
19 as per drawing. MT
Description Unit Quantity
Stub Setting Including back fiiling but excluding excavation and concreting
etc. for all type of towers/extensions except special towers.(Weight of
20 Stub,Cleat & Template with Bolt & Nuts of Stub & Template shall be MT
Up to 6mtr extension
Concreting of foundation by M15 (1:2:4) mixture including shoring,
shuttering, dewatering etc. for normal tower / tower with extension up to
21 mtr. (Rates are with cement.) Cu.m
Concreting of foundation by M20 (1:1.5:3) mixture including shoring,
shuttering, dewatering etc. for normal tower / tower with extension up to
22 mtr. (Rates are with cement.) Cu.m
Grounding of towers with Pipe Type earthing including excavation and back
filling and supply of all materials like 32mm Dia heavy duty 3 mtr Long G.I
23 pipe & 50 x 6 mm G.I flat , bolt - nuts , salt , coal/charcoal etc as per Set
Grounding of tower with COUNTER POSE TYPE earthing including
excavation and back filling and supply of all material like GSS Wire, lugs,
24 bolt - nuts , salt , coal/charcoal etc as per drawing. Set
Erection of Super Structure up to 6 mtr extension including tree cutting
fixing of tower accessories,attachments except ACD/DP/NP/PP/CIP and
excluding tack welding of bolts. This includes taking delivery of tower
25 materials and bolt-nuts from GETCO's Store etc. for normal, extension & MT
special towers at destination and keeping them in safe custody and
transporting the same to erection site.
Fixing of Anti-climbing devices incuding supply of Barbed wire.
(except special tower)
Fixing of DP/NP/PP/CIP including supply of plates and supply of GI Bolt
nuts & tack welding as per drawing.
Tack welding of nuts upto approx 10 mtrs height or two bottom most panel
from ground level at three places on the nuts diametrically and applying
29 zinch rich paint immediately after tack welding. Per Bolt
Painting of name of line , location number, colour code and telephone
number on tower for information of concerned substation including supply
30 of paints etc.
Description Unit Quantity
a) all four legs
Laying of Two continuous Runs (no in between splicing) of Fibre Optic Approach Cable ( DWSM - Dual window
single mode, 24F/48F) - with installation hardware like ties / clips / cleats, conduits, HDPE ducts, supports, fittings,
accessories etc) along with 132kV/220kV cable system strictly as per approved method of construction i.e MOC.
Proposed FOAC cable shall be spliced to existing OPGW/FOAC cable after rearranging. Following shall be strictly
followed for installation
- Two to Three rings of extra loop length shall be kept buried underground at foot of both end termination tower
after laying FOAC cable with 132kV/220kV cable as per MOC.
- Each run of FOAC cable length remaining outside the ground level shall be at least two times the height of each
termination tower at both end and it should be brought upto third cross arm of termination tower through HDPE
pipes properly tied with tower.
- Length of FOAC cable (i.e Approximately tower height) after bringing the FOAC cable above third cross shall be
managed in rings by properly fixing clamp arrangement to hold up on end termination tower. Also, each run of
FOAC cable shall be terminated at individual joint box on each termination tower.
- After laying FOAC cable, each length shall be tested for end to end test using power meter and OTDR. Test
Report provided in GETCO technical specification shall be duly sealed and signed with date, name & designation
of testing person, executing contractor and witnessing officer one each from telecom as well as TR/Const.
nominated from respective EE(Telecom) and EE(TR)/EE(const.) respectively.
(1) Complete Installation of OPGW cable (24/48 Fibers) including laying , providing required hardwares, in line
splices to be encased in Fibre Optic Splice Enclosures, Laying & termination of a fibre optic approach cable
required to connect Overhead Fiber Optic Cable (OPGW) between the final in line splice enclosure on the
gantry/tower and the Fibre Optic Distribution Panel (FODP) to be installed within the building at both the sub-
station ends as per technical specification.
(2) Link up of OPGW Cable including all related activities.
(3) After completion of arrangement work of OPGW, for 132kV/220kV line, it shall be tested for End to End test &
test report duly sealed & signed with name and dated signature of testing personal, Witnessing Officer of GETCO,
executing contractor to whom GETCO has placed order as well as concern EE (Const.) alongwith .SOR files shall
be submitted for approval. However, other testing requirement during work execution shall also be carried out at
each stage of work as per standard formats of "Letter- CE (Proj)- Guidelines - OPGW Execution.pdf " (letter
CE(P)/EE(TR-II)/T-1/4281, Dtd: 25.11.2014).
(4) Also, regarding guideline for executing work of OPGW laying on various 400kV, 220kV and 132kV
transmission line, a further addendum to letter "CE (Proj)- Guidelines - OPGW Execution.pdf" has been issued
vide letter CE (Project)/EE (Telecom)/OPGW/1294, Dtd: 13.08.2020.
(5) A joint verification with field officer for work executed/done shall be invariably completed as per standard
revised format-A.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
6.EMD BG Format.pdf
4. MAAT LA Networth Form.pdf
5.POA Of JV Agreement-Format.pdf
6.EMD BG Format.pdf
7.SD cum PBG Format.pdf
8.Form of LD undertaking 1A.pdf
9.Form of LD undertaking 1B.pdf
10.Revised Annexure-C -Joint Deed of Undertaking.pdf
11.Annecure-B -Joint venture agreement.pdf
12.ON - Ammendment for ROW clause Tender Copy.pdf
13.ONLINE SCHEDULE TECH - E-508.pdf
14.Online Schedule-QR-E-508.pdf
15.Public Procurement Circular of GOI.pdf
16.Letter for CBuD.pdf
17.132 kV 1Cx800 sq. mm UG cable - R3 june 2023.pdf
18.132 kV MOC final - S. Copy.pdf
19.400 220 132 kV LA R6 June 22.pdf
20.Amendment- Structure weight.pdf
21Ammendment for TTR validity 26.02.2026.pdf
22.HW ACCS PANTHER CONDUCTOR.pdf
23.OPGW (48F) specs final-R2-11.09.2023 final.pdf
24.R5 May 24- Silicon Rubber - Print Copy.pdf
25.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
26.SUPPLY ERECTION OF 220KV LINES WO COND.pdf
27.TOWER MATERIAL-220KV LINE-ZEBRA.PDF
28.132KV LILO Mota dahisata FOAC.pdf
30.Relationship clause Circular latest.pdf
29.BOQ E-508.pdf
1.Part-1-132KV Varshamedi Wankaner LILO at Mota Dahisara E-508.pdf
2.Ammend-1 Part-1-132KV Varshamedi Wankaner E-508.pdf
3.Tender notice-132KV Varshamedi Wankaner E-508.pdf
File and Drawing List-E-508.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .