Tender Value
₹14.2 L
EMD Value
₹35,700
Closing Date
28 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Managing Director, KLD Board
Gokulam, Pattom P.O., Thiruvananthapuram - 695 004
Renovation of A2 Quarters
2026_KLDB_879077_1
CE/16/2026
Open Tender
Civil Works - Others
Percentage
180 days
Mattupatti
Please refer Tender Documents
7 documents required · 7 mandatory
₹2,950
₹35,700
14 Oct 2026
14 Oct 2026
30 Oct 2026
14 Oct 2026
28 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation of A2 quarters at Mattupatty farm | |||||
| 1.01 | Dismantling of flushing cistern of all types (C.I. / PVC/ Vitrous China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | 3 | Nos | 811.06 | ₹2,433.18 |
| 2 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.
In lime mortar | 6.44 | m3 | 737.45 | ₹4,749.18 |
| 3 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 8.99 | m3 | 1,003.22 | ₹9,018.95 |
| 4 | Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:
Of area 3 sq. metres and below | 9 | Nos | 333.19 | ₹2,998.71 |
| 5 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
For thickness of tiles 10 mm to 25 mm | 56 | m2 | 66.59 | ₹3,729.04 |
| 6 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 16.78 | m3 | 112.37 | ₹1,885.57 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.88 | m3 | 7,027.98 | ₹13,212.6 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:
1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.99 | m3 | 8,857.07 | ₹26,482.64 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 1.39 | m3 | 11,852.29 | ₹16,474.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_1494350.xls
BOQ • 0.35 MB
prilia2quarters.pdf
Other Document • 0.11 MB
decla2quarters.pdf
Other Document • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .