Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹5.5 L+₹13,937.40 (2.59%)Rejected-AOC AITHARA KALEELAZHIKATHU VEEDU ODANAVATTOM PO | IDUKKI | KERALA | 685533 | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹6.9 L+₹1.5 L (27.5%)Rejected-AOC N A | L3 | Rejected-AOC L3 Bidder |
| Sl No | Description | Qty | Unit | ASOKAN. V L2 | THOMAS JOHN L3 | Skyarc constructions L1 |
|---|---|---|---|---|---|---|
| 1.00Road Forming | ||||||
| 1.00 | 4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method | 50 | cum | 2,641 ₹1,32,050 | 3,275.69 ₹1,63,784.5 | 2,500 ₹1,25,000 Lowest |
| 2.00Road work | ||||||
| 2.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 375 | sqm | 14 ₹5,250 | 16.92 ₹6,345 | 10 ₹3,750 Lowest |
| 2.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 37.95 | sqm | 267 ₹10,132.65 Lowest | 359.13 ₹13,628.98 | 295 ₹11,195.25 |
| 2.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 56.25 | cum | 6,926 ₹3,89,587.5 | 8,589.45 ₹4,83,156.56 | 6,780 ₹3,81,375 Lowest |
| 2.00 | 5.28:Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound in expansion joints. | 900 | per cm depth per 1 m | 5 ₹4,500 Lowest | 6.61 ₹5,949 | 5 ₹4,500 Lowest |
| 2.00 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 18.75 | cum | 546 ₹10,237.5 Lowest | 678.33 ₹12,718.69 | 640 ₹12,000 |
Tender Value
₹7.4 L
EMD Value
₹18,430
Closing Date
10 Nov 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Assistant Executive Engineer KIP LB Subdivision No 13 Kollam
D E P O S I T K I P L B E d a k k i d a m Gurunadhanmukal canal Bund Road concreting work in Kareepra grama panchayath Second Reach General Civil Work
2025_Irrig_817926_1
IRR/PII/TR/6038/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Edakkidam jn
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,625
₹18,430
20 Jan 2026
1 Nov 2025
12 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
Amount
Road Forming
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
Road work
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.28:Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound in expansion joints.
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
ASOKAN. V (BID ID -2425767)
THOMAS JOHN (BID ID -2434639)
Bidder Name
THOMAS JOHN
ASOKAN. V
Skyarc constructions
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.79 MB
BOQ_1370714.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .