| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC NR SUJAL AGRO S NO 192 POGLU PATIYA NATIONAL HIGHWAY NO 8 PRANTIJ SABARKANTHA GUJARAT 383205 | PRANTIJ | SABARKANTHA | GUJARAT | 383205 | ₹1.6 Cr | 1 | Accepted-AOC Bidder has quoted lowest among all TACA bidders. |
| 2 | 2₹4.5 CrRejected-Finance ROSE VILLA PUNEDI BENA KAULAR MERCES VASAI WEST THANE MAHARASHTRA 401202 | PALGHAR | MAHARASHTRA | 401202 | ₹4.5 Cr | 2 | Rejected-Finance Bidder has quoted higher amount compared to L-1 Bidder. |
| Sl No | Description | Qty | Unit | PANAM ENGINEERS LIMITED L1 | V TECH OFFSHORE SERVICES PVT. LTD. L2 |
|---|---|---|---|---|---|
| 1.00Supply & Installation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines in ONGC Hazira Plant | |||||
| 1.10 | Supply of material, equipment forInstallation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines with all associated structural, as per SOW at ONGC Hazira Plant | 1 | Nos | 81,35,000 ₹96.0 L | 2,98,58,261 ₹3.5 Cr |
| 1.20 | Site installation/ erection of equipment & mechanical / piping /instrumentation and commissioning of Installation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines | 5 | Nos | 54,23,600 ₹64.0 L | 79,64,565 ₹94.0 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹3.7 L
Closing Date
17 Feb 2026, 3:00 pmClosed
GM(SCM), HPO, SCM Department
GM (SCM) Head Procurement Officer, 1st Floor, Satellite Building, Supply Chain Management Department, ONGC Hazira Plant, Surat, Gujarat
SUPPLY AND INSTALLATION OF DOUBLE BLOCK AND BLEED (DBB) SYSTEM IN KRU FURNACE FUEL GAS LINES AT HAZIRA PLANT
2026_ONGC_262934_1
8A5RC26001
Open Tender
Oil/Gas
425 days
ONGC HAZIRA PLANT SURAT
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹3.7 L
2 Apr 2026
14 Jan 2026
18 Feb 2026
14 Jan 2026
17 Feb 2026
14 Jan 2026
14 Jan 2026 - 23 Jan 2026
Supply & Installation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines in ONGC Hazira Plant
Supply of material, equipment forInstallation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines with all associated structural, as per SOW at ONGC Hazira Plant
Site installation/ erection of equipment & mechanical / piping /instrumentation and commissioning of Installation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines
Notes to Price Format
The bidder to quote prices inclusive of all applicable taxes/duties for completion of services as per scope of work. No payment other than above line items shall be made during the contract period.
The rates mentioned above inclusive of mobilization, de-mobilization. The charges for packing, transportation (to & fro), insurance etc. shall be payable at actual subject to submission of documentary evidence and limited to the amount quoted.
No advance payment shall be made by ONGC. Payment shall be made as per payment terms mentioned in SCC.
Bidder are required to ascertain themselves, the prevailing rates of GST and all other taxes and duties as applicable on the scheduled date of submission of Price Bids and ONGC would not undertake any responsibility whatsoever in this regard.
Price validity shall be for the entire period of the contract including extension thereof if any.
The contractor shall provide all the necessary compliances/ Invoice/ documents for enabling ONGC to avail input tax credit benefits, in respect of the payments of GST which are payable against the contract.
GST registration number of ONGC, Hazira Plant Surat is 24AAACO1598A4ZQ; PAN No: AAACO1598A.
For quoting rate of GST: Bidder to quote the numerical value of the GST percentage without % symbol.
As mentioned under Price Schedule and operationally pertains to Condensate Processing group, one point responsibility is desired to be fixed on one Single Contractor. As such, the entire work of “Supply & Installation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines in ONGC Hazira Plant" essentially required to be undertaken by one single contractor only. Bidders to note that work to be awarded based upon TOTAL COST FOR THE ENTIRE WORK, including GST in INR (Same will be considered for Evaluation).
Bidders to note that the entire work of “Supply & Installation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines in ONGC Hazira Plant" includes both material & services requirements as mentioned in the scope of work. Hence for the entire work completion all activities, which are deemed to be performed, executed and supplied by the contractor for completion of work as stipulated in the Scope and cost thereof is to be included. Non- familiarity and non- identification by the Bidder/ Contractor, of any works will not be considered as a reason either for extra claims or for not carrying out the work in strict conformity with specifications and instructions of Company Representative and Contract Document.
Bidder is required to quote for entire work & lowest qualified bidder will be finalized based upon the bidder who has quoted for the entire work of scope all activities for “Supply & Installation of Double Block and Bleed (DBB) System in KRU Furnace Fuel Gas Lines in ONGC Hazira Plant”. Partial bidding will not be considered for ascertaining lowest bidder. Bidders are required to acquaint themselves with the actual site conditions & understand that the requirement of all types of material, tools tackles, etc. & all other activities is in their scope Accordingly, Bidder should prepare their estimates and absorb all variations in their quoted prices.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
TenderDocumentsDBB.rar
Tender Documents • 20.17 MB
BOQ_304743.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid