| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹8.0 L+₹8,469.58 (1.06%)Accepted-Finance KONDOTTY PO KONDOTTY PIN 673638 | KONDOTTY | MALAPPURAM | KERALA | 673638 | L2 | Accepted-Finance L2 | |
| 3 | L3₹8.9 L+₹93,178.04 (11.7%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MANORANJ C.P L1 | RAMAKRISHNAN K L2 | Prashanth M K L3 |
|---|---|---|---|---|---|---|
| 1.00Lab block | ||||||
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 54.13 | sqm | 66.56 ₹3,602.63 Lowest | 67.27 ₹3,641.06 | 74.35 ₹4,024.27 |
| 1.00 | 15.11.2:Removing mortar from and cleaning stones and concrete articles ( net quantity of stacks of cleaned materials will be measured):In cement mortar | 10.2 | cum | 625.05 ₹6,375.51 Lowest | 631.7 ₹6,443.34 | 698.2 ₹7,121.64 |
| 1.00 | 15.10.1:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In lime mortar | 1.55 | cum | 1,328.21 ₹2,060.05 Lowest | 1,342.34 ₹2,081.97 | 1,483.64 ₹2,301.13 |
| 1.00 | OD194338/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 0.99 | cum | 7,168.68 ₹7,075.49 Lowest | 7,244.94 ₹7,150.76 | 8,007.56 ₹7,903.46 |
| 1.00 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 1.58 | cum | 6,189.98 ₹9,804.93 Lowest | 6,255.84 ₹9,909.25 | 6,914.34 ₹10,952.31 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.35 | cum | 8,741.69 ₹3,059.59 Lowest | 8,834.69 ₹3,092.14 | 9,764.65 ₹3,417.63 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 4.9 | sqm | 843.33 ₹4,132.32 Lowest | 852.3 ₹4,176.27 | 942.02 ₹4,615.9 |
| 1.01 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 14.21 | sqm | 338.01 ₹4,801.43 Lowest | 341.61 ₹4,852.57 | 377.57 ₹5,363.38 |
| 1.01 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 317.68 | kilogram | 102.38 ₹32,524.08 Lowest | 103.46 ₹32,867.17 | 114.36 ₹36,329.88 |
Tender Value
₹8.5 L
EMD Value
₹21,176
Closing Date
7 Mar 2026, 3:00 pmClosed
Assistant Executive Engineer
PWD Buildings Subdivision Kannur
LAC ADS District AYURVEDA HOSPITAL KANURCONSTRUCTION OF CAUSALITY BLOCK
2026_PWD_842475_1
PWD/BLDG/18566/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,176
Yes
23 May 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
7 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Lab block | |||||
| 1.001 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 54.13 | sqm | - | - |
| 1.002 | 15.11.2:Removing mortar from and cleaning stones and concrete articles ( net quantity of stacks of cleaned materials will be measured):In cement mortar | 10.2 | cum | - | - |
| 1.003 | 15.10.1:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In lime mortar | 1.55 | cum | - | - |
| 1.004 | OD194338/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 0.99 | cum | - | - |
| 1.005 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 1.58 | cum | - | - |
| 1.006 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.35 | cum | - | - |
| 1.007 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 4.9 | sqm | - | - |
| 1.008 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 14.21 | sqm | - | - |
| 1.009 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 317.68 | kilogram | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1421463.xls
BOQ • 0.34 MB
sbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .