Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹2.5 L
Closing Date
9 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ENGINEERIN
14 conditions · 3 needing a document upload
"The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V=Advertised value of the tender in crores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIIB (as per standard tender document), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. (As per Rly. Board letter No. 2022/CE-I/CT/GCC- 2022/Policy dated 14.07.2022, advanced correction slip No. 1). "
Tenders costing more than 50.00 Lakhs:- As a proof of experience/competency, The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Similar Nature of Work: Any civil work other than track work.
15 conditions · 5 needing a document upload
Tenderers are required to upload self-attested/digitally signed scanned copy of eligibility documents such as mandatory credentials, affidavit, partnership deed, power of attorney, PAN, GST/TIN Firm/Company registration/MOA/MOU/AOA etc.
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. (Annexure-VII-A).
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: (i) A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. (ii) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids. (i.e. excluding the last date of submission of bids. (iii) Non submission of scanned copy of Bank Guarantee with the bid on e- tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. (iv) The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. (v) The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected (vi) The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. (vii) The envelope shall be addressed to the officer and address as mentioned in the tender document. (viii) If the envelope is not sealed and marked as instructed above, the Authority assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder. (Annexure-VII-A, as per attached standard tender documents & Annexure-VI-A of GCC-2022).
Tenderers are advised to submit self-attested/digitally signed copy of Bank particulars i.e. Bank name, Bank Account No. IFSC code as per Annexure-XII of Tender Document for any smooth transactions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are not required to submit uploaded Tender document which has uploaded for the information & knowledge of Tenderers. (2) Tenderers are advised to check the Tender Schedule Items, conditions/eligibility criteria etc. before quoting the rates for E-Tendering. (3) No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenders shall be treated as NULL & Void. (Authority: - HQ/NR Letter No. 74-W/0/Pt. XXV/WA/Loose Dated: 07.04.2015.
Tenderers are advised to make workers wage/salary payment through workers bank account to ensure making payment during the wage period in Railway's Shramik Kalyan portal.
Provision of full length Shunting neck by extension of line no. 1 towards Nangal Dam end at Kiratpur Sahib station on SIR-NLDM section.
OT-299-UMB-2025-26
OT-299-UMB-2025-26
Open
Works - General
8 Months
Ambala, Haryana
₹0
₹2.5 L
9 Mar 2026
16 Feb 2026
23 Feb 2026
87 items across 2 schedules · ₹1,87,67,859.82 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | soil to of | 100 Sqm | 8000.00 | 528.37 | 42,269.6 |
| 2 | for to the the in of the be the be for this of | Kilometre | 0.73 | 1,53,238.46 | 1,11,864.08 |
| etc. to to for of as | — | — | — | — | |
| 3 | Using Soil Class SQ1 | cum | 24000.00 | 319.97 | 76,79,280 |
| 4 | in as by | Metre | 100.00 | 190.96 | 19,096 |
| 5 | the | Sqm | 140.00 | 137.13 | 19,198.2 |
| 6 | on 35 | cum | 25.00 | 1,956.04 | 48,901 |
| 7 | not | cum | 70.00 | 1,083.73 | 75,861.1 |
| 8 | GP, in of etc. and | cum | 170.00 | 3,110.58 | 5,28,798.6 |
| 9 | in the top of | Each | 2.00 | 862.59 | 1,725.18 |
| 10 | all | cum | 70.00 | 441.93 | 30,935.1 |
| 11 | be | HP Hour | 1200.00 | 31.66 | 37,992 |
| of be | — | — | — | — | |
| 12 | Under Conditions not requiring Traffic Block | Set | 2.00 | 7,574.37 | 15,148.74 |
| on for all of of and of 20 of by | — | — | — | — | |
| 13 | Derailing Switch | Set | 1.00 | 11,143.8 | 11,143.8 |
| the all as of to No 2. for P. | — | — | — | — | |
| 14 | For 52 Kg - 90/72 UTS Rail | Each | 4.00 | 7,753.04 | 31,012.16 |
| of to IR's by by | — | — | — | — | |
| 15 | For 52 Kg - 90/72 UTS Rail | Each | 120.00 | 6,287.43 | 7,54,491.6 |
| to to by rail & | — | — | — | — | |
| 16 | Rail length up to 13m - Under Conditions not requiring Traffic Block | RM | 1460.00 | 18.63 | 27,199.8 |
| of by bar the | — | — | — | — | |
| 17 | 50 | Each | 30.00 | 175.58 | 5,267.4 |
| 18 | in of at of m on | Each | 2.00 | 809.12 | 1,618.24 |
| 19 | all to line as of | cum | 1204.50 | 46.75 | 56,310.38 |
| and bed the of & per etc. in for | — | — | — | — | |
| 20 | per | TRM | 730.00 | 314.22 | 2,29,380.6 |
| lift. rail site of in (1) | — | — | — | — | |
| 21 | Without Rail tensor | TRM | 600.00 | 38.41 | 23,046 |
| 22 | cut of out or of by (2) of | Each | 4.00 | 2,067.78 | 8,271.12 |
| to per of | — | — | — | — | |
| 23 | For 52 Kg Rails | RM | 1500.00 | 45.36 | 68,040 |
| of of (3) (4) of of / (7) of 1. or the pre the out of | — | — | — | — | |
| 24 | For day time block working | TRM | 200.00 | 21.76 | 4,352 |
| 25 | New Line Section, not opened for traffic | TRM | 800.00 | 11.83 | 9,464 |
| all lift in- per 01 Rail per of | — | — | — | — | |
| 26 | 52 Kg - 90 UTS - Outside Track | Each | 300.00 | 181.81 | 54,543 |
| 27 | 52 Kg - 90 UTS- On Running Line | Each | 25.00 | 219.83 | 5,495.75 |
| all all by No. | — | — | — | — | |
| 28 | Outside Track | Each | 600.00 | 65.23 | 39,138 |
| 29 | On Running Line | Each | 60.00 | 83.55 | 5,013 |
| up | — | — | — | — | |
| 30 | is or | MT | 75.92 | 120.88 | 9,177.21 |
| / | — | — | — | — | |
| 31 | is or | MT | 10.00 | 121.72 | 1,217.2 |
| in | — | — | — | — | |
| 32 | is or | MT | 75.92 | 90.68 | 6,884.43 |
| line to or to if & | — | — | — | — | |
| 33 | is or | MT | 334.00 | 91.66 | 30,614.44 |
| in / of | — | — | — | — | |
| 34 | not | MT | 7.00 | 121.28 | 848.96 |
| 35 | Lead beyond 100 Km and up to 150 Km | MT | 417.00 | 854.52 | 3,56,334.84 |
| in or any | — | — | — | — | |
| 36 | From Truck / Trailer | MT | 334.00 | 90.56 | 30,247.04 |
| in or 50 any | — | — | — | — | |
| 37 | From Truck / Trailer | MT | 7.00 | 91.55 | 640.85 |
| SEJ & & | — | — | — | — | |
| 38 | From Truck / Trailer | MT | 10.00 | 118.18 | 1,181.8 |
| the for | — | — | — | — | |
| 39 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 500.00 | 858.69 | 4,29,345 |
| 40 | Tractor with Trolley for local transportation or other misc. works. | Hour | 1000.00 | 200.69 | 2,00,690 |
| Schedule total | ₹1,10,12,038.22 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NIT-54-UMB-25-26.pdf
ATTACHMENT
TNN-54C-WorksDSR-UMB-2025-26.pdf
ATTACHMENT
SafetyInstructionatWorksSite.pdf
ATTACHMENT
AdcanceCorrectionslips12345678910ACS10clarification.pdf Advance Correction Slips of GCC
ATTACHMENT
GeneralConditionsforcivilworks.pdf
ATTACHMENT
AdcanceCorrectionslips12345678910ACS10clarification.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .