Tender Value
₹30.3 L
EMD Value
₹30,340
Closing Date
1 Oct 2026, 4:00 pm4d left
The Superintending Engineer
Soil Investigation for 66kV Nadabet-Jaloya line locations Under Palanpur Circle
344511
PTC/ET/97/2026
Open
Civil Works
Works
Banaskantha
12 documents required · 11 mandatory · 1 optional
₹1,180
Gujarat Energy Transmission Corporation Ltd
₹30,340
11 Sept 2026
11 Sept 2026
11 Sept 2026
1 Oct 2026
11 Sept 2026
Name of work: Soil Investigation for 66kV Nadabet-Jaloya line locations
Under Palanpur Circle
Tender Notice.
Integrity Pact.
Instructions to Bidders.
Qualification Requirement.
Conditions of Contract.
General Conditions of Contract.
Standard Field Quality Plan.
Technical Specifications.
Forms & Appendices to be filled in by the bidders.
Technical Specifications for Civil Works.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
E-TENDER NOTICE
SE (TR) invites “On line Tenders” (e-tendering) for the Work of: Soil Investigation for 66kV
Nadabet-Jaloya line locations Under Palanpur Circle. From registered Contractors in
appropriate class with GETCO / Central / State Government / Railway/Semi. Govt. and who has
executed civil works successfully as mentioned in Qualification requirement criteria given in the
tender document. Bidders should fulfill the all the qualification criteria. Otherwise, their bids will
not be considered & price bid will not be opened. All the bidders should have valid e-tender
vender registration.
Tender Papers & Specifications may be down loaded from Web site https://getco.nprocure.com
(For view, down load and on line submission) and GUVNL / GETCO web sites www.gseb.com &
www.getcogujarat.com (For view & download only). All tender documents are to be uploaded
through online only (mandatory) on (n) procure portal including scanned copy of duly attested
Tender fee, EMD and Integrity Pact.
Sr. Description Civil Works Details
1 Tender No. PTC/ET/97/2026
2 Sr. No. PTC/ET/Civil/17/2026
3 Name of work Soil Investigation for 66kV Nadabet-Jaloya line locations
Under Palanpur Circle
4 Tender Cost Rs 30,33,834.16/- (including GST & WC)
(Payment of EMD will be accepted by RTGS / NEFT / online only).
6 Tender Fee (Non- Rs.1180/- (1000+180 GST@ 18%)
Payment of Tender-Fee will be accepted by RTGS/NEFT Online only).
7 Time Limit 04 Calendar Months
8 Appropriate Class Class- “E1” & above
9 On line (E-tendering)
tender/ offer submission
last date up to 16.00 hours
only (This is mandatory)
10 Date of opening of Tender
fee, EMD cover, and
integrity pact in on – line
opening at 16.01 Hours.
11 Type of Tender Percentage Basis on FIRM PRICE
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Bidder has to upload scanned copies of original (Notarized / self-attested copies of
original – as specified in tender document) documents with bid and no physical
documents to be submitted by bidder.
Bidders have to submit technical bid as well as Price bid in electric format only on above
mentioned website till the date and time shown above. However, of anywhere in tender
documents submission of other than this document physical submission mentioned to
The Tender Fee amount should be paid by NEFT/RTGS/Online only at the office address
specified in the tender document. Payment of EMD should be made by RTGS/NEFT/on
line only. After the payment through RTGS/NEFT bidder has to mail following details:
the transection slip of payment made by RTGS/NEFT is to be uploaded in N- procure
with tender documents.
Sr. No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details by email on the same date of payment so that receipt can
GETCO Beneficiary Bank detail is as under:
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
3 Name of Bank Bank of Baroda
4 Branch Code PALANP
5 Address of Bank Ground Floor, Meeta Hospital Building, Opp. New Bus
Stand, College Road, Palanpur, Gujarat -385001
6 IFSC Code BARB0PALANP (Fifth digit is “0” Zero)
7 PAN No AABCG4029R
8 TAN No AHMG02636E
9 GST No 24AHMG02636E1DV
5. In case short submission of documents with bid and / or clarification if any required from the
bidder, the required details / documents may be asked from bidder in physical form.
6. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF from)
remain legible and should not be password protected.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
7. All the relevant scanned documents as per requirement of the tender are to be upload through
online only on n procure portal including Tender fee receipt, EMD receipt and attested Integrity
Pact. (All tender documents including Price bid are not to be submitted with the physical
8. Tender will be evaluated on Data / Details / Documents of the online offer only.
9. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in
scheduled time.
10.The bidders are required to fill up all the online annexure / forms. This is intended for
transparency and speedy evaluation of the bids. Instead of simply confirming / attached in bid,
the Bidder shall fill in the particulars against appropriate place in respect of each line
appearing in each online annexure. Wherever required, bidder shall invariably have to upload
supporting authentic documents in the online bid.
(In the absence of required details in the online annexure, the owner has every right to
evaluate the bids accordingly and bidder cannot raise any objection against any point during
11.Bidders are requested to remain in touch with the web-site for any amendment / corrigendum
or extension of due date etc
12.The Earnest Money Deposit and tender fee will be accepted by NEFT/RTGS/online only. EMD
and Tender Fee in NEFT/RTGS/online only with different purchaser or agency shall not be
accepted. Tender without EMD receipt and tender fee receipt shall be rejected. Two separate
transaction for Tender fee and EMD should be submitted.
13.The GETCO reserves the right to award the work to one or more bidders, considering their
technical and financial capacity OR to reject any or all tenders or accept any tender without
assigning any reason thereof.
Any technical questions, information and clarifications that may be required pertaining to this
enquiry should be referred to: The Superintending Engineer (TR), Gujarat Energy
Transmission Corporation Limited, Circle Office, Palanpur – 385
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe” website.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED, PALANPUR
Name of Work: Soil Investigation for 66kV Nadabet-Jaloya line locations Under Palanpur Circle
Ref: PTC/ET/97/2026
To create environment where Business Confidence is built through Best Business Practices and
is fostered in an atmosphere of trust and respect between providers of goods and services and
their users for the ultimate benefit of society and the nation.
GETCO COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical standards in Not to bring pressure / recommendations
business and profession. outside GETCO to influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat, inducement or
Satisfaction of stakeholders Pressure of any kind on GETCO or any of its
employeesunder any circumstances.
To ensure to fulfill the terms of agreement / To be prompt and reasonable in fulfilling the
contract and to consider objectively the contract, agreement, legal obligations.
viewpoint of parties.
To ensure regular and timely release of To
payment on due dates for work done. provide goods and / or services timely as per
agreed quality and specifications at minimum
To ensure that no improper demand is made by To abide by the general discipline to be
employees or by anyone on our behalf. maintained in our dealings.
To give maximum possible assistance to all the To be true and honest in furnishing information
Vendors / Suppliers / Service provider and including payment to agents / sub-agents.
others to enable them to complete the contract
To provide all information to suppliers/ Not to divulge any information, business
contractors relating to contract / Job which details available during the course of business
facilitate him to complete the contract / job relationship to others without the written
successfully in time. consent of GETCO.
To Not to enter
ensure minimum hurdles to Vendors/ suppliers into carter/syndicate / understanding whether
/contractors in completion of agreement / formal/non formal so as to influence the price.
contract /work order.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(Undertaking in Regard to Stop deal / Banned for Business dealing / Black list thereof)
SUB: Undertaking in Regard to Stop deal / Banned for Business dealing / Black List thereof
Ref: Tender No:
All Bidders will have to furnish the following undertaking duly filled in, signed and stamped for
Each quoted item of the tender along with the technical Bid.
Hereby certify that
And their proprietor / any partner / any director of the firm is not stop deal and / or Banned / black
Listed by GUVNL and or its any of the subsidiary company viz. GSECL /GETCO /DGVCL
/MGVCL/UGVCL /PGVCL for the tendered item.
Contractor’s Signature with Seal & Date.
Seal of the Company.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Tender Acceptance letter
TENDER NO: - PTC/ET/97/2026
Sub: Soil Investigation for 66kV Nadabet-Jaloya line locations Under Palanpur Circle.
In connection with above subject, I/we confirm the following:
1) I / we, the undersigned, have read and examined each page/document of above tender
documents in detail.
2) I / we declare that we accept all the conditions of the above tender unconditionally / I We don’t
have any objection for any clause, point or condition. If there will be any deviation found, in bid,
the offer shall be out rightly rejected without assigning any reason thereof.
3) In any legal implication in future if any, this document can be used as authentic consent from
Signature of Authorized Representative of Company / Agency
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Suptd. Engr / Ex.Engr.
(Location Address)
Sub.: CA Certificate for payment of GST and uploading of the invoice details on GSTN portal
This is to certify that M/s (Name of the Party and Address) have completed the work / supply of
(Nature of Work) against (Work Order No. and date). It is further certified that the GST charged
on the bills of the said work order are paid to Government and accurate & correct details of such
invoices are also uploaded on the GSTN portal within the stipulated time. It is further certified
that GST charged from GETCO has neither been refunded nor is refund claim pending with
GST Department.
Name of the Firm
Firm Registration No.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(ON LETTERHEAD OF COMPANY/FIRM)
Suptd. Engr / Ex.Engr.
(Location Address)
Sub.: (Nature of Work with Order No. of GETCO) -- Submission of Undertaking thereof
I/we hereby undertake that if GST Charged on the invoices of the above stated order is not paid/
short paid to government or if I/we fail to upload the details or uploads inaccurate particulars on
GSTN portal within the stipulated time limit, GETCO shall have the right to recover the amount of
GST along with penal interest at the rate of 15 % p.a.
I/we, hereby undertake that in the event of any refund of GST either full or part if received by
me/us in future in respect of the goods and/or services for the above state order, I/we shall pass
on the same to GETCO without any formal claim to that effect from GETCO.
Name of the Supplier / Contractor
Name, Signature of the Authorised Signatory
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
A/T ACCEPTANCE LETTER: -
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
The Superintending Engineer
Gujarat Energy Transmission Corporation Ltd,
Circle Office, Nr. Circuit House
We hereby acknowledge, agree and accept your A/T under reference above with terms and
conditions mentioned therein.
Designation ___________________
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
KNOW ALL MEN BY THESE PRESENTS THAT We, __________________________________________
(hereinafter called THE CONTRACTOR, which expression shall, where the context so admits include their
heirs, executors, administrations and legal representatives, successors and permitted assigns) are hereby
held and firmly bind unto the GUJARAT ENERGY TRANSMISISON RORPORATION LTD. (hereinafter
called the GETCO, which expression shall where the context so admits, include its successors and assigns)
to refund the full amount of steel, cement and other materials supplied by the GETCO under the terms and
against any loss, damage or deterioration of whatsoever nature occurs to the said materials supplied by the
GETCO and which are in the custody of the contractor at his works site on behalf of the GETCO at
________________________________________ or if any of the said materials when inspected by any
officer authorized by the GETCO in this behalf of found to be damaged, lost, deteriorated in quality or
quantity, the contractor hereby agree to pay the full amount forthwith the GETCO and hereby bind himself
to indemnity and at all times keep indemnified the GETCO against all loss, damage and deterioration to the
cement, steel and any materials supplied by the GETCO within 30 days, the market value of such loss,
damage and deterioration in full to the GETCO and shall also authorize the GETCO to deduct the said sum
from any due to the contractor or any such which at any time may become due to the contractor or any
referred contractor or any other entered into by the contractor with the GETCO.
AND WHEREAS THE CONTRCTOR do hereby agree to be responsible for safe custody, protection and
preservation of the said materials against all risks and against loss, damage and deteriorations of
whatsoever nature in respect of the said materials while it remain in the custody and possession of the
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized
NOW the conditions of the above written bond are such the contractor shall pay the full amount
forthwith to Board in the event of loss, damage or deterioration or whatsoever except due to circumstances
arising out of war or natural calamities in respect of the materials supplied by the GETCO and shall fully
land effectually indemnify and keep indemnified the GETCO against such loss, damage and deterioration in
The contractor shall keep the said materials open at all times for inspection by the officer authorized
by the GETCO and produce at any time when demanded.
IN WITNESS WHEREOF WE, the ____________________________________________ hereto
sign at _____________________(signature of the contractor with his name, designation & official seal) on
In presence of:- …………………………………………….
(with name, full address & signature).
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Technical Specification & Commercial Conditions
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(A) INSTRUCTIONS TO THE BIDDERS
(A1) SCOPE OF WORK:
Major works covered in this work are “Soil Investigation for 66kV Nadabet-Jaloya line locations Under
Palanpur Circle” as per specifications and terms mentioned here under.
(1) The site of proposed work is situated at Palanpur TR Circle jurisdiction. The works shall be carried
out as per tender specifications & detailed work order.
(2) Any activity not specifically mentioned in the tender but necessary in the opinion of engineer in charge
of work must be carried out for successful completion of the job, on getting approval of competent
authority of GETCO.
(3) Before taking up construction activity; the agency has to cut the trees which obstruct the working, of
any diameter, bushes, vegetation, i.e. roots, plant, shrubs, grass etc including stacking and crediting
to GETCO as directed with no extra cost.
(4) Site visit: The bidder is advised to visit the site and examine the site condition. Where in the work is
proposed to be carried out and to get himself fully acquainted at his own responsibility for all
information that may be necessary for quoting the tender bid and entering in to contract. All cost and
liabilities arising out of the site visit shall be at bidder account.
(A2) Earnest money Deposit:
1. Bidders are requested to pay an earnest money deposit (1 % of estimated cost) by
NEFT/RTGS/online only for the amount as specified in the tender notice. Payment of EMD any
other form other than NEFT/RTGS/Online shall not be accepted. EMD and Tender Fee
NEFT/RTGS/online only with different purchaser or agency shall not be accepted.
2. The EMD shall be submitted along with submission of Technical bid only. In no case it shall be
submitted with sealed cover of Price Bid.
3. Tenders not accompanied by EMD shall be rejected.
4. If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the EMD shall be
forfeited and the tenderer may be disqualified from tendering for further works of GETCO.
5. The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned to the
successful tenderer after he furnishes the Security Deposit for performance and duly enters in to the
contract. If he fails to furnish the SD or to execute the contract for the work offered to him, his EMD
shall be forfeited and the tenderer may be disqualified from tendering for further works for GETCO.
(A3) (1) COMPLETION PERIOD:
The time limit for the completion of the above work will be 04 calendar Months from the
commencement of the work, which will be given by the competent authority.
One month additional will be considered for the rainy season if the scheduled execution period falls
within the period from 1st July to 31st October. In case the duration of execution is not exactly falls for a
period of 1st july to 31st October, the proportionate days will be given based on the duration falls
between period 1st July to 31 st October e.g.
If entire duration falls between 1st July to 31st October, 30days allowable towards rainy days.
If the execution period falls short by four months, then the proportionate days shall be calculated based
on following formula:
Daily allowable on account of rainy period =30xN/120, where N = numbers of days falling between 1 st July
to 31st October.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Note- While applying this formula no extension of time limit shall be permitted on account of delay due to
15 days additional will be considered where hard rock strata are available.
Delay due to power supply will be considered in TLE only if the agency applies for power supply to
DISCOM within 5 days from the date of issue of LOI. It is necessary for bidders to apply within 5days
from the date of LOI for temporary power connection considering 5days required by distribution
company to provide the power connection as per their SOP, making thereby availability of power supply
on 10th day of LOI. Any delay in making the application for temporary power connection beyond initial
5 days shall be on account of bidder.
(A4) SECURITY DEPOSIT:
As per prevailing rules of the Corporation, 5% of the contract value shall be paid as ‘Security Deposit’. As
per Government of Gujarat vide circular No. JNV.10212/520A dtd. 26.06.2012 & GERC audit report,
contractor has to pay 100 % S. D. shall be paid at Circle Office, Palanpur as early as possible, from
receipt of letter of intent either
a) In form of DD in favour of "Gujarat Energy Transmission Corporation Ltd. " of any
Nationalized Bank payable at Palanpur OR
b) In form of Bank Guarantee of any Nationalized Bank as per the approved format
of the Corporation valid for minimum period of time limit plus guarantee period of one year.
Alternatively, 100 % S. D. may be submitted on receipt of LOI. The security deposit will be refunded
only after the completion of 1(ONE) year guarantee period of work completed or finalization of final bill
whichever is later.
If Security Deposit is not paid within 15 days of issue of LOI, EMD paid will be forfeited and Corporation
will not deal with party for the period of 2(TWO) years.
(A5) Other Instructions:
1 Tenders must be submitted in the enclosed schedule of work & quantities. Those received in any other
form will not be accepted. They should be accompanied by a covering letter in which the bidder should
give all information as called for in the specifications & any other point which he would like to be
considered along with the tender.
2 The Schedule-B shall be filled up with the quoted % above or below & shall be submitted online
3 The bidders shall note that no deviations from the technical specifications or commercial conditions
with this bid are acceptable & it will be presumed that the bidder agrees entirely with the specifications
& general terms &conditions of the contract.
4 The Corporation reserves the right to accept any tender irrespective of whether it is lowest or not or to
reject all the tenders without assigning any reasons thereof. Tenders departing from the technical
Specification or the method of bidding in a radical manner may also be rejected.
5 On acceptance of the tender the name(s) of the accredited representative(s) of the tenderer who would
be responsible for taking instructions from the Engineers of the Corporation shall be communicated to
the Superintending Engineer (TR), Gujarat Energy Transmission Corporation, Circle Office, Palanpur.
6 Proof of payments of taxes made by the Contractor to the appropriate departments shall be produced to
Gujarat Energy Transmission Corporation failing which appropriate amount shall be withheld on getting
information / instruction from the concerned departments.
6A.1 GST Registration:
The Bidder should have to take registration under the “GOODS AND SERVICE TAX(GST)”. Bidder
has to register online in given link before bidding. Link for the same is
www.getcogujarat.com/gst. The certified Xerox copy of such registration shall have to be
submitted along with the bid by the bidder.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
On forfeiture of EMD, SD or guarantee under the terms and conditions of this tender, applicable GST
will also be recovered from the bidder / contractor and GETCO reserves all rights of such recovery of such
forfeited amount along with GST.
PENALTY FOR DELAY:
The completion time allowed for carrying out the work should be strictly observed. For any delay, penalty
will be levied at the rate of ½ % per week or part thereof on delayed portion of the work subject to ceiling
of 10% of total contract value (GST as applicable will be imposed).
6A.2 The prices quoted shall be all inclusive of freight, octroi, transportation, loading, –unloading &
stacking at site of Girders/Towers and line materials received from construction store GETCO Kansari
after observing all store formalities of GETCO.
6A.3 No extra payment toward any type of templates and erection tools /materials will be made.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of the
Supplier from Composition scheme during the tenure of the contract, the rate (i.e. price) mentioned in the
price bid shall be final and any additional GST will have to be borne by the tenderer himself. In no case
additional amount towards GST or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for Composition
Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for
each item of Goods/Service. If not specifically mentioned, then COMPANY will have the option to take the
prices as exclusive of taxes and duties at maximum higher slab rates for the evaluation of the tenders.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess
is not mentioned clearly unless the bidder has opted for Composition Scheme under GST Act, which
should be clearly indicated in the price bid. COMPANY may at its discretion consider such offer with
presumption of highest applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B). The price
bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends to
supply the goods / services, meaning thereby the bidder has to supply the goods / services from the
relevant declared / registered place of supply only.
6A.5 Goods and Service Tax (GST):
The rates are excluding GST at the rate of 9% CGST plus 9% SGST or 18% IGST under the GST law or
as applicable to works contract service from time to time which will be paid extra on a given taxable goods
and/or services.
The amount of GST, Percentage (%) of GST and Cess as applicable should clearly be indicated
separately. (GST/Cess means all applicable Tax/Cess under GST Laws. GST Laws means IGST Act,
GST (Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act,
2017and all related ancillary legislations).
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder, certifying that
you have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not claim
any such Refund, on a future date, from the concerned Authorities and if, any Refund, in respect of such
GST and Cess, is claimed by you, it will be immediately passed on to the COMPANY, without COMPANY
making any specific Claim, for the same, either from the Department or from you.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of the
Supplier from Composition scheme during the tenure of the contract, the rate mentioned in the price bid
shall be final and any additional GST will have to be borne by the tenderer. In no case additional amount
towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause
will not be applicable in case of Supplier / Contractor has opted for Composition Scheme under GST.
Contractor has to provide Tax invoice in a standard format as per CGST act, CGST rules 2017 and GST
invoicing rules containing all details as provided Act and rules. Contractor / Supplier has to mentioned
GST no. of GETCO 24AABCG4029R2ZC in the invoice invariably failure of which payment will not be
GST at the applicable rate will be levied on the total of schedule B. GST will be subject to CGST, SGST,
UTGST, IGST act and rules, regulation and notifications issued by government from time to time.
Contractor has to classify the supply / services according to the HSN / SAC of CGST Act, 2017. GETCO
also reserve the right of classification in case of any misclassification of goods / services.
Further, any additional liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the Supplier/Contractor.
However, any refund received by the supplier / contractor on account of GST charged from the company;
such refund shall have to be passed on to the company, along with interest if any. Such refund along with
interest needs to be passed on suo-moto by the supplier / contractor.
The amount of GST in the invoice will be reimbursed subject to matching of transaction in GST return. In
case of mismatch, amount of GST will be retained from the subsequent invoice of the contractor. For final
bills, GST will be retained and reimbursed on matching the same in GST return and after receipt of
request from the contractor.
Further, the Company has a right to recover the amount of GST along with penal interest at the rate of
15% per annum if GST charged is not paid / short paid to the government or fail to upload the details or
uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
DEDUCTION OF TDS under GST
As per provisions of GST Act, TDS under GST @ 2% (1% CGST & 1% SGST or 2% IGST as applicable)
or at the applicable rate from time to time, will be deducted from the bill of suppliers/contractors at the time
of credit or payment. TDS Certificates in the prescribed format will be issued as per the prescribed rules
6A.6 INPUT TAX CREDIT BENEFIT:
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GST Act, subsequent to the date of submission of the offer, the same should be passed on to COMPANY
and you should inform such changes to COMPANY from time to time.
6A.7 STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or in the
event of introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers offer if it
takes place within the original contractual delivery date will be to COMPANY’s account subject to the claim
being supported by documentary evidence. However, if any decrease takes place after the contractual
delivery date, the advantage will have to be passed on to COMPANY.
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for Composition
Scheme under GST.
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision of
Income-Tax Laws and to that effect a certificate will be issued to the contractor
6C Welfare Cess
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection
items for supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey
projects and civil works.
Contractor shall get registered under Welfare Cess Act before commencement of work.
Office of the Factory Inspector is authorized at present as a registering authority.
quote accordingly.
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive
basis of utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to
the contractor on receipt of request letter along with documentary evidence of payment. For calculation
of welfare cess on supply part, valuation as per MR shall be taken and informed to the contractor for
payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act
and submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of final bill,the contractor has to submit documentary evidence
of payment of welfare cess of previous R.A.Bill as well as of this final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor
has to submit documentary evidence of registration under Welfare Cess Act and evidence of payment
of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
7 The successful contractor will have to sign an agreement as per the Gujarat Energy Transmission
Corporation rules on stamped paper & the necessary stamp duty charges shall be borne by the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
8. The bidder shall visit the site and carefully study the work to be carried. The Corporation will not pay
any extra or rate for any reason in case the contractor claims, after acceptance of contract, to have
misjudged the site condition.
9. The percentage quoted shall include cost towards of all materials, & machinery including equipments,
fixtures, labour, constructional equipments, fuel, scaffolding, staging, ramps, walkways, approach and
haul road, temporary works, etc. bearing permanent or temporary nature necessary for the completion
of the work in all respects, except for those items specifically mentioned to be furnished by the
Corporation. The contractor must also arrange for the transport of materials & include all such costs in
the rates quoted by him for finished work.
10. During the execution of the work if it is found that the work is not progressing as per the Scheduled
Progress Program, approved by the Corporation & planned by the Contractor, due to the reasons
attributable to the Contractor; suitable action shall be taken as per relevant clauses mentioned in
General Conditions of Contract.
11. The contract or any part thereof shall not be subject to change without the written permission of the
Superintending Engineer (TR), Gujarat Energy Transmission Corporation, Circle Office, Palanpur.
385 001 or his authorized representatives.
12. Tender shall remain open for acceptance for a period of 180 days from the date of Technical bid
opening & during this period no bidder shall be allowed to withdraw his tender. Any such withdrawals,
during the said period will entail forfeiture of the earnest money deposited with the tender. The
GETCO will take further action as deemed fit like not to deal with bidder in GETCO works.
13. Further information required, if any, can be had from the office of the Superintending Engineer (TR),
Gujarat Energy Transmission Corporation, Circle Office, Palanpur. 385 001. But it must be clearly
understood that the tenders must be received complete in every respects by the due date & time
14. The notice inviting tender, general instructions to the contractors & all documents of this tender shall
form part of the contract.
15. The works under this contract shall be completed in all respects within stipulated period from the date
of commencement order issued by field office. However, interim mile stones to be jointly fixed after
16. Bidders must quote firm price only, till completion of work under contract, & this is to be confirmed by
bidder while submitting his offer. No escalation towards labor and material / fuel shall be paid in this
execution of contract.
17. Contractor shall pay minimum wages to his laborers as per the Minimum Wages Act, 1948 & rules
there under as applicable from time to time in pursuant to the State Government notification. The
concerned contractor shall submit the details of the payment with due certificate of LWO/IRO of the
18. Once the offer submitted will not be returned back for any reason thereof in any case.
19. Each tender shall contain the name, residence & place of business of person or persons making the
tender & shall be signed by the tenderer with his usual signature with seal of the company.
20. Tender by partnerships shall furnish the full names of all partners. It shall be signed with the
partnership name by one of the members of the partnership or by an authorized representative
followed by the name &designation of the person signing.
21. An attested copy of the constitution of the firm with the name of partners shall be furnished.
Whenever, whether in submission of the tender or later in other matters, the signatures are made by
one person on behalf of Directors or a firm or a corporation, an attested copy of the resolution of the
partners or of law shall be supplied by the tenderer authorizing Witnesses & sureties shall be persons
of status & probity, &their names, occupation & address shall be stated below their signatures. All
signatures shall be dated.
22. Tenders by corporation shall be signed with the legal name of the corporation followed by the name of
the state of incorporation & by the signature & designation of the president, secretary or other perso n
authorized to bind it in the matter with rubber seal of the company.
23. The GETCO reserves the right to delete any item of Schedule-B for which contractor shall not have
any right to claim on this account.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
24. The Bidders shall study the Conditions of site & shall resort to dewatering, where necessary, by
appropriate methods & maintain reasonably dry areas to work at and no extra claim will be
entertaining on this account.
25. The Contractor shall prepare all required roads to execute various items of this Contract & arrange all
transport of materials & all such costs shall be taken care of while quoting the rates.
No extra payments shall be admissible towards such costs. On completion, this shall be cleared if
asked by GETCO at no extra cost.
26. Gujarat Energy Transmission Corporation shall not entertain idle charges for any site conditions or
any circumstances.
27. The Contractor shall take all requisite & necessary care to observe that no damage is occurred to the
Existing structures, if any. For any damage to the Existing Structures of Gujarat Energy Transmission
Corporation the Contractor shall be held responsible.
28. The submission of any bid connected with these document and specification shall constitute on
agreement that bidder shall have no cause of action or claim against the GETCO for rejection of his
bid. The owner shall always be at liberty to reject or accept split any bid or bids at his sole discretion
and any action will not be called into question and the bidder shall have no claim in that regards
against the owner.
29. Recoveries:
(I) In case of any damage to equipment/machinery or structure/building of GETCO or any public property
due to negligence’s of contractor or any other reasons attributed to contractor the decision of E.I.C.
regarding the amount of recovery shall be final and binding.
(II) If the contractor fails to execute the proportionate work as per direction of E.I.C. within the time frame
given for completion of part / whole of the work GETCO shall get the work done through any other
contractor and the cost of execution of such work along with 15% overhead charges shall be
recovered from contractor.
30. Notwithstanding anything contained to the contrary in the specification or tenders in subsequent
exchange of correspondence, the conditions of contract shall be binding on the contractor and any
change or variations expressed or implied, however made in the said conditions shall not be valid or
operative unless expressly sanctioned by the Corporation. The contractor shall be deemed to have
fully informed himself and to have special knowledge of the provisions of the conditions of contract
herein contained.
31 Submissions of tender by a contractor implies that he has read the instructions and condition of
contract herein contained and has made himself aware of the scopes and specifications of the work to
32 These rules and directions shall form part of the contract.
33 Drawings: Drawings required for the works are available with the E.E. (Civil) of Circle Office
Palanpur. They are indicative and for tender purpose only. Bidders shall have to execute the work as
per construction drawings issued from time to time by GETCO.
34 Electricity Connection: The electric power, at site, will be made available at one mutually agreed
point, free of cost (connection only) by Gujarat Energy Transmission Corporation only. Further
distribution will have to be carried out by the contractor as per requirements at their own cost. The
necessary consumption charges will be recovered as per the tariff rate of Gujarat Energy
Transmission Corporation from time to time as per Corporation’s rules.
35 The contractor has to make his own arrangement of water for construction activity at his own cost. The
contractor shall be allowed to draw water from bore well / open well by making his own arrangement
such as drilling, pump with all electrical accessories, pipe line & electricity to run the bore well /open
well from the electric power point provided by DISCOM to them. Water shall be free of cost to the
contractor. The electrical consumption charges to run the bore well / open well shall be borne by the
In those cases, where in bore well has been constructed at the cost of GETCO as per contract, even
then no water charges shall be charged, however electricity connection & electricity charges till the
completion of work shall be to contractor accounts.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
In no case, GETCO is bound to supply water if the ground water sources are not available at site
within premises.
36 Tenders received after time: The tenders received after time and date specified in the tender notice,
will not be accepted. Once the offer submitted by the contractor before due date of submission, the
contractor will not be allowed to submit revised / additional / modified / other even before due date.
However, if the issue and receipt of tender is extended by the Corporation due to any reason, the
contractor may submit the revised offer before due date of submission, if he wishes to submit.
37 The work shall be completed within the period stipulated in the contract. However, it may be noted
that drawings shall be released progressively & site clearance arranged accordingly to the progress of
work at site. Therefore, the contractor has to organize & coordinate the works to suit these. In the
event of any delay due to the above or due to any other reason not attributable to the contractor,
reasonable extension in the completing the work may be given at the discretion & as decided by the
Corporation but no compensation or idle charges will be paid to the contractor under any
38 The price bid/proposals will be opened in the presence of the bidder’s representatives who choose to
attend at the date and time and venue to be notified by the GETCO, after conclusion of the Technical
Evaluation and Post Qualification process.
39 GETCO will not issue any material required for the work. All the materials – tools & tackles, labour
etc. will have to be arranged by the contractor.
40 ACCEPTANCE OR REJECTION OF BID
a) The GETCO reserves the right to accept any tender irrespective of whether it is lowest or not or to
reject all the tenders without assigning any reasons thereof. Tenders departing from the stipulated
technical specifications, commercial conditions or the method of bidding in a radical manner are liable
to be rejected.
b) The bid is liable for rejection prima facie, if it is
c) Without payment of EMD / Tender Fee. Or Payment of EMD / Tender fee in any form other than
NEFT/RTGS/Online only
d) Not in prescribed form.
e) Not bearing signature of the bidder & seal of the company on all the documents accompanying the
f) Not confirming to specifications or conditional tender.
g) Received after expiry of the due date & time.
h) Received by telex or telegram or fax.
i) Submitted by bidders who are listed under declaration of ineligibility for corrupt or fraudulent practices
issued by GETCO, Govt. of Gujarat or its Public Sector under taking.
Tender not fulfilling all the above conditions and those specified in the documents attached or incomplete
in any respect are liable to rejection.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Qualification Requirement
1. Registration: Bidder quoting for the bid shall have Registration and approved vender with Gujarat
Energy Transmission Corporation Limited (GETCO).
2. Experience: Bidder should have experience of similar work including Geo Technical
Investigation/Soil bearing Capacity (SBC) work and as like under single contract as main
contractor for minimum of 50% value of estimated cost of the tender with GETCO/ GEB / Central /
State Government / Railway / Semi- Government / Public Sector Organization within last 5 years.
Attested copy of work orders executed from GETCO/ GEB / Central / State Government / Railway
/ Semi- Government / Public Sector Organization and satisfactory completion certificate from
respective department should be submitted .
3. Solvency: Latest bank solvency certificate (not more than 1-year-old of tender publish as on date) from
any Nationalized/Scheduled Bank of a sum of minimum 20 % of the estimated cost shown in the
tender. The solvency should be in the name of “To Whomsoever it may concern” or “GUJARAT
ENERGY TRANSMISSION CORPORATION LIMITED (GETCO)”.
4. Provident Fund Code: Separate provident fund code number towards firm registered with Regional P.
F. Commissioner.
5. Profit & Loss Account Statement: The Bidder should submit certified Xerox audited copy of the
Balance sheet with profit and loss account of last three Years.
6. Nature of Firm: Attested copy of Partnership Deed with recent Form-G obtained from Registrar of
firms for the current year, Power of Attorney, if any, for signing the bid documents in case of
partnership firm & self-affidavit for proprietorship firm. In case the Form-G is not available for
current year Affidavit cum Undertaking of the firm declaring no change in Form-G is to be submitted.
However, this affidavit cum undertaking should be executed only by partnership firm. The party shall be
liable to give fresh affidavit cum undertaking, after completion of its one year. All such documents shall
have to be NOTARISED
7. Goods & Service Tax (GST) Registration: The Bidder shall be registered under the GST Act and a
certified copy of such registration under the GST act indicating the GSTIN shall have to be submitted
along with the bid by the bidder
8. I.T. PAN CARD: The bidder should submit the attested soft copy of PAN Card of their firm.
9. Certificate: Bidder quoting for the bid shall have certificate from NABL.
10. Annexure: All the Annexure must be filled by the Contractor on their own Letter pad as per
the format attached duly signed and all details filled properly.
All the documents to be submitted in soft copy shall be self-attested/notarized.
Signature of Contractor Superintending Engineer,
GETCO, Circle Office,
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
For Proprietorship firm only
AFFIDAVIT CUM UNDERTAKING
(On Rs.300/- stamp paper duly notarized)
We, Shri (names of all partners and POA holder) of M/s._______________
(name of partnership firm) having registered place of business at_____________________
do hereby solemnly state and affirm on Oath as under:
1. That Form G up to last entry dated has been
submitted to GETCO by us.
2. That since this Form G is not of current year, it is affirmed that
whatever entries specified by Registrar of Firms in this submitted Form G is true and
correct and that, there is no any modification or change in any of the partners or other
details. It is further affirmed that we are liable & bound to disclose to GETCO
immediately, if there is any change and/or modification in partnership of this firm.
3. That if GETCO finds any undisclosed modification/amendment in
partners or other details at any time, then they shall be entitled to take any legal
action against us / partnership firm. GETCO shall be empowered to stop-deal and
/or black-list our firm for any contract, at such instances.
4. That whatever stated in aforesaid paras and contents therein are
true and correct and shall be binding on all the partners of this partnership firm, which
includes their heirs, representative, assigness, executors etc.
Hence solemnly affirmed on this day of months of 20 at_ _____________
(name & sign of all partners / or POA Holders)
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
For Proprietorship firm only
Self-Affidavit for proprietorship firm
(On Rs.300/- stamp paper duly notarized)
I the undersigned _______________________________________________ hereby solemnly
declare on oath that I am the sole proprietor of the firm ___________________________.
The proprietorship concern is solely owned, managed and controlled by me.
The signature appearing in the contract agreement is signed by me and is true.
I hereby state that whatever is stated herein above is true and correct to the best of my
knowledge and belief.
Hence solemnly affirmed on this _____ day of ___________ of
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GENERAL CONDITIONS OF CONTRACT
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(C) GENERAL CONDITIONS OF CONTRACT
1. Definitions:
(a) The Contract means the documents forming the tender and acceptance thereof, together with the
documents referred to therein or individual work order in the case of term contract, including these
conditions, schedules and / or additional conditions attached to the form of tender or individual work,
order, rate schedule, the specifications and the drawings and all these documents as applicable
taken together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender, the applicable schedules and/or additional
conditions and the specifications and/or drawings as issued to the contractors for the purpose
preparing tender.
(c) The expression “works” or “work” when used in the conditions of contract shall, unless there be
something in the subject or context repugnant to such construction means, the works or the work
contracted to be executed under or in virtue of the contract whether original or altered.
(d) The “Contractor” means the individual or firm or company, whether incorporated or not, undertaking
the works and shall include his or its legal personal representative, successors and permitted
(e) “Corporation” means the Gujarat Energy Transmission Corporation Ltd. and the “Accepting Officer”
means the officer who is authorized to sign and signs the contract on behalf of the “Corporation.”
(f) The letter “EE” means Executive Engineer who in the case of measurement and lump sum contract,
direct the contractor and the letters “ACE” means “Add Chief Engineer” and “CE” means “Chief
Engineer” who administers and in the case of the term contracts directs the contract.
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the Chief Engineer to
supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer to Supdt. Engineer
or the person deputed by him for the particular purpose.
(i) “B.S.” means the “British Standard” as issued by the British Standards institution. “A.S.” means the
American Standards as issued by the American Standard Institutions and “I.S.” means the “Indian
Standards” as issued by the Indian Standards Institutions. Wherever the above-mentioned
abbreviations are preferred to, in the specifications and / or work orders, they mean the addition with
all amendments current at the date of issue of tender documents of work orders.In the case of
measurement and terms of contracts “Specifications” means those contained in Gujarat Energy
Transmission Corporation Ltd. schedule together with any amendments etc. embodied in the tender
documents, “Drawings” refer to those accompanying the tender documents and/or any work orders
referred therein.
(j) The “Contract Sum” means the sum accepted or the sum calculated in accordance with the prices
accepted in the tender and/or the contract rate as payable to the contractor for the full and entire
executing and completion of works.
(k) “The date of completion” is the date or dates of completion of the work or any part of the works set
out or ascertained in accordance with the individual work orders and the tender documents or any
subsequent agreed amendments thereto.
(l) GST/Cess means all applicable Tax/Cess under GST Laws. GST Laws means IGST Act, GST
(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act,
2017and all related ancilliary legislations.
(m) 'Owner' shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its group
companies i.e. GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL and shall include its legal
representatives, successors and assigns.
2.Security Deposit
The contractor shall, within 15 days of the issue of Letter of Intent, pay 5 % as Security Deposit. The
Bank Guarantee from schedule bank in lieu of cash or government securities towards Security Deposit
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
will be accepted providing amount of Security Deposit payable exceeds Rs. 10,000/- .All damages,
costs, charges, expenses and other sums which may be or may become due or payable by the
contractor to the Corporation under the terms of the contract may be deducted from the cash in the
proceeds of sale of the Securities/Bank Guarantee to deposited (which the officer or person to whom
the same may be endorsed as aforesaid is hereby authorized to sell / to encash for that purpose) or
from the interest of any such securities of from any sums due or which may become due to the
contractor by the Corporation or from the whole or the balance unpaid as aforesaid of the encash
securities so deposited being repaid or transferred and returned as may be to contractor after the date
on which the final bill is paid or after the expiry of the date up to which the contractor has to maintain
the work in good order whichever is later.
“For Water Proofing Treatment: -
The contractor shall submit performance guarantee of the waterproofing item at the rate of 20% of cost
of item of work order in the form of DD or in the form of BG of Schedule Bank / Nationalized Bank in
favor of GETCO (A/c Agency) for a period of 5 years from actual date of completion of work on non-
judicial stamp paper of appropriate value in approved format of GETCO. In the event of unsatisfactory
performance of waterproofing work, the agency shall carry out necessary remedial/rectification works
that may be necessary in the opinion of GETCO at no extra cost, failing which BG shall been cashed by
GETCO. The BG shall be released only after satisfactory completion of performance period of
“For Anti-Termite Treatment: -
The contractor shall submit performance guarantee of the anti-termite treatment item at the rate of 20%
of cost of item of work order in the form of DD or in the form of BG of Schedule Bank / Nationalised
Bank in favour of GETCO (A/c Agency) for a period of 5 years from actual date of completion of work
on non-judicial stamp paper of appropriate value in approved format of GETCO. In the event of
unsatisfactory performance of anti-termite treatment work, the agency shall carry out necessary
remedial/rectification works that may be necessary in the opinion of GETCO at no extra cost, failing
which BG shall be encashed by GETCO. The BG shall be released only after satisfactory completion
of performance period of 5 years.”
3. Penalty for the delay
The time limit allowed for carrying out the work as entered in the tender shall strictly observed by the
contractor and shall be reckoned from date of commencement given by concern Authority / DE(Civil).
The work shall throughout the stipulated period of contract proceeds with due diligence (time being
deemed to be essence of contract) and for delay, the contractor shall pay compensation @ 0.5% plus
GST as applicable per week or part thereof on delayed portion subject to maximum 10% plus GST as
applicable of the total contract value of the civil works (end cost with GST & cess as applicable). For
calculating the delayed portion, date of work completion mentioned in work completion certificate shall
In event of failure of the contractor to pay the amount of penalty as demanded, the Owner shall be
entitled to deduct the amount of penalty for delay from the amounts payable under any other contract
with the GUVNL and its subsidiary companies i.e. GETCO, GUVNL, GSECL, MGVCL, DGVCL,
PGVCL, UGVCL. It is permissible for the owner to adjust the amount of Penalty of delay against any
bank Guarantee furnished by the contractor under this contract or any other contract with GUVNL
and/or its subsidiary companies.
4. Action when whole of Security Deposit is forfeited
In any case in which under any clause or clauses of this contract the contractor shall have tendered
himself to pay compensation amounting to the whole of his security deposit (whether paid one sum or
deducted by installments) or in the case of abandonment for the work owing to serious illness or death
of the contractor or any other cause, the Executive Engineer on behalf of the Corporation, shall have
powers to adopt, (a) below and any of the following courses under (b) and (c) as he may deem best
suited to the interest of the Corporation.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the contractor under the
hand of the Executive Engineer shall be conclusive evidence and in that case the security deposit of
the contractor shall stand forfeited and absolutely at the disposal of the Corporation.
(b) To employ labor paid by the Corporation, to supply materials to carry out of the works or any part of the
works debiting the contractor with the cost of the labor and the price of the materials (as to the
correctness of which cost and price the certificate of the Executive Engineer shall be final and
conclusive against the contractor) and crediting him with value of the work done, in all respects in the
same manner and at the same rates as if it had been carried out by the contractor under the terms of
this contract and in that case the certificate of the Executive Engineer as to the value of the work done
shall be final and conclusive against the contractor.
(c) To order that the work of the contractor be measured up and to take such part thereof, as shall be
unexecuted, out of his heads and to give it to another contractor to complete, in which case, any
expenses, which may be incurred in excess of the sum, which would have been paid to the original
contractor, if the whole work had been executed by him as to the amount of which excess expenses the
certificate in writing of the Engineer-in-charge shall be final, conclusive and shall be borne and shall be
paid by the original contractors and shall be deducted from any money due to him by the Corporation
under the contract or otherwise from his security deposit of the proceeds sale thereof or a sufficient part
In the event of the above courses being adopted by the Executive Engineer the contractor
shall have no claim to compensation for any loss sustained by him by reason of his having purchased
or procured any materials or entered into any engagements or made any advances on account of or
with a view to the execution of the work or the performance of the contract. And in case the contract
shall be rescind under the provision aforesaid, the contractor shall not be entitled to recover or be paid
any sum for any works thereof actually performed by him under this contract unless and until the
Executive Engineer shall have certified in writing the performance of such works and the amount
payable to him in respect thereof and he only be entitled to be paid the amount so certified.
5. Notice for unsatisfactory progress
If the progress or a particular portion of the work is unsatisfactory the Executive Engineer whose
decision shall be final, shall notwithstanding that the general progress of work is satisfactory; be entitled
to take action under Clause 4(c) after giving the contractor 10 days’ notice in writing and the contractor
will have no claim for compensation for any loss sustained by him owing to such actions.
6. Action in the case of Default by Contractor
If any case in which any of the powers conferred upon the Executive Engineer by Clauses 4 and
hereof, shall have exercised and the same shall not have been exercised, the non-exercised thereof
shall not constitute a waiver of any of the conditions hereof and such powers shall not withstanding be
exercisable in any further case of default by the contractor for which, by any clauses hereof, he is
declared liable to pay compensation amounting to the whole of his security deposit and liability of the
contractor for past and future compensation shall remain unaffected in the event of the Ex. Engineer
taking action under sub clause (a) or (c) of Clause 4 he may, if he so desires, take possessions of all or
any tools, plants, materials, and stores in such upon the work or the site thereof belonging to the
contractor, or procured by him and intended to be used for the execution of the work of any part thereof
paying for allowing for the same in account at the contract rates, or in the case of a contract rates not
being applicable to current market rates to be certified by the Executive Engineer whose certificate
thereof shall be final. In the alternative, the Executive Engineer may by notice in writing to the
contractor or his clerk of works, foremen or other authorized agent, require him to remove such tools,
plants, materials or stores from the premises within a time to be specified in such requisition to
decisions to the contractor failing to comply with any such requisition, the decision of the Executive
Engineer as to the expenses of any such removal and the amount of the proceed and expense of any
such sale, be final and conclusive against the contractor.
lf the Contractor shall neglect to execute the works with due diligence and expedition or shall
refuse or neglect to comply with any reasonable order given to him, in writing by the Engineer in
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
connection with the works or shall contravene the provisions of the Contract, the Owner may give
notice in writing to the Contractor to make good the failure, neglect or contravention complained of.
Should the Contractor fail to comply with the notice within thirty (30) days from the date of serving the
notice, then and in such case the Owner shall be at liberty to employ other workmen and forthwith to
execute such part of the works as the Contractor may have neglected to do or if the Owner shall think
fit, without prejudice to any other right he may have under the Contract to take the work wholly or in
part out of the Contractor’s hands and re-contract with any other person or persons to complete the
works or any part thereof and in that event the Owner shall have free use of all Contractor’s equipment
that may have been at the time on the Site in connection with the works without being responsible to
the Contractor for fair wear and tear thereof and to the exclusion of any right of the Contractor over the
same, and lf the sum thot the Contractor is entitled to be paid plus the costs incurred by the
Owner in completing the works, exceeds the Contract Price or the entire works if entire works
have been completed or the price for port of the works if part of the works have been
completed. the Contractor shall be liable for such excess.
lf such excess is greater than the sums due to the Contractor, the Contractor shall pay the
balance to the Owner and if such excess is less than the sums due to the Contractor, Owner
shall pay the balance to the Contractor. For facilitating such payment. Owner shall encase the
Bank Guarantees of Contractor available with Owner/s and retain such other payments due to
the Contractor under the Contract in question or any other Contract that the Owner/s may have
with the Contractor. Such payment of excess amount shall be independent of the liquidated damages
for delay which the Contractor shall hove to pay if the completion of works is delayed.
7. Extension of Time Limit
If the contractor shall desire an extension of the time limit for completion of the work on the ground of
his having been unavoidably hindered in it’s execution or on any other ground, he shall apply in writing
to the Executive Engineer and the Executive Engineer may, if in his opinion there are reasonable
grounds for granting extension, recommend such extension as he may think necessary or proper. The
decision of the competent authority in this regard shall be final and binding to the contractor. Any delay
attributed to Corporation shall be compensated only by way of extending the limit.
8. Completion Certificate
On completion of the work the Contractor shall be furnished with Completion Certificate by the
Executive Engineer of such completion but no such certificate shall be given nor shall be the work
considered to be complete until works are taken over and/or duly tested and put to operative as the
case may be, nor until the work shall have been measured by the Engineer-In-Charge or where the
measurement have been taken by his subordinated until they have received the approval of the
Executive Engineer the said measurement being binding and conclusive against the contractor.
9. Effect of the Certificate
No payment shall be made for any work estimated to cost less than Rs.1,000/- till after the whole of
said work shall have been completed and certificate of completion given. But in the case of works
estimated to cost more than Rs.1,000/- Contractor shall on submitting a monthly bill thereof, be entitled
to receive payments. Proportionate to the part of the work then approved and passed by the Engineer-
in-charge, whose certificate of such approval and a passing of the sum requiring bad, unsound,
imperfect or unskillful work to be removed and taken away and reconstructed or rejected nor shall any
such payment be considered as admission of the due performance of the contract or any part thereof in
any respect of the accruing of the claim nor shall conclude, determine or effect in any way the powers
of the Engineer-in-charge as to the final settlement and adjustment of the accounts otherwise or in any
other way, vary or affect the contract. The final bill shall be submitted by the contractor within one
month of the date fixed for completion of work. Otherwise the certificate of Engineer-in-charge of the
measurement and of total amount payable for the work shall be final and binding on all parties.
measurement and of total amount payable for the work shall be final and binding on all parties.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
10. Payment to Contractors
The rates for several items of works estimated to cost more than Rs.1,000/- agreed to within
shall be valid only when the item concerned is accepted, having been completed full, in
accordance with the sanctioned specification. In case, where the items of the work, are not
accepted, as so completed the Engineer-in-charge, may make payment on account of such
items at such reduced rates, as he may consider reasonable in the preparation of final or
running accounts bills.
The Bill shall be submitted by the contractor each month on or before the date fixed by the Engineer-in
- charge, for all works, executed in the previous month and the Engineer-in-charge shall take or cause
to be taken the requisite measurement for the purpose or having the same verified and the claim so far
as it is admissible, shall be adjusted, if possible, within ten days from the presentation of the bills. If the
contractor does not submit the bill, within the time fixed, as aforesaid, the Engineer-in-charge may
depute a subordinate to measure up the said work in the presence of the contractor or his duly
authorized agent, whose counter signature in the measurement shall be sufficient warrant and the
Engineer-in-charge may prepare a bill from such list which shall be binding on the contractor in all
respects. GETCO shall make effort for the payment of bills (RA & final bills) as early as possible,
however no interest is payable on bill amount if there is delay in payment of GETCO for whatever
The company has decided to make payment to suppliers/contractors through RTGS/NEFT by transfer
of funds instead of cheques through regular courier service/RPAD the payment shall be released to
your bank account through RTGS.
Therefore, the suppliers/contractors are requested to furnish the following details in original letter head
with cancelled cheque.
1. Account Number
2. Type of account
4. Branch name & address
5. Contact no. of the branch
7. One cancelled cheque
9. For necessary payment against each consignment of material along with 100% taxes, duties, F & I shall
be duly recorded in the form of TRC & SR note by the field office and works related bills, which shall be
now uploaded on Vendor Management System (VMS) Portal, www.vms.guvnl.com including invoice,
documents which are digitally signed by Vendors / Suppliers/Contractors. The supporting documents
duly signed, stamped and scanned are required to be uploaded. The VMS portal also provides ‘real
time’ tracking of invoice status, to monitor the process of submissions and to receive timely updates
12. Supply of Materials to Contractor
If the specification of the estimated work provides for use of any special description of material to be
supplied from the Corporation’s Stores or if it is required that the contractor shall use certain stores to
be provided by the Engineer-in-charge (such material and stores and the prices to be charged thereof
as here in after mentioned being so far as practicable for the convenience of contractor but not so as in
any way to control, the meaning or effect of the contract specified in otherwise or from the security
deposit or the proceeds of sale thereof if the deposit is held in Government Securities the same or a
sufficient portion thereof, shall be sold for the purpose. All materials supplied to the contract shall
remain the absolute property of Corporation and shall on no account be removed from the site of the
work and shall at all time be open to inspection by the used by him or for any wastage in or damage
thereto. The contractor shall be responsible for the loss, destruction or deterioration of the materials,
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
stores or articles supplied to him by the Corporation even if such loss, destruction or deterioration has
occurred under any circumstances whatsoever beyond his control as if the materials, stores or articles
so supplied were his property.
13. Works to be executed in accordance with specifications, drawings, orders etc.
The contractor shall execute in whole and every part of work in the most substantial and workmanlike
manner and both as regarding materials and in every other respect in strict accordance with the
specification. The Contractor also shall confirm exactly, fully and faithfully to the designs, drawings and
instructions in writing relating to the work signed by the Engineer-in - charge and lodged in his office
and to which the contractor shall be entitled to have access for the purpose of Inspection at such office,
or in the site of the work, during office hours and the
Contractor shall, also if he so requires, be entitled at his own expenses to make or cause to be made
copies of the specification, and of all such designs, drawings and instructions as aforesaid.
14. Alteration in Specifications and Designs not to invalidate Contracts.
The Executive Engineer shall have powers to make any alteration, or addition to the original
specification designs, and instructions that may appear to him to be necessary or advisable during the
progress of the work and the contractor shall be bound to carry out the work in accordance with any
instructions in this connection which may be given to him in writing, signed by the Engineer-in-charge
and such alterations shall not invalidate the contract. Any additional work which the contractor may be
directed to do in the manner above specified as part of the work shall be carried out by the contractor
on the same conditions in all respect on which he agreed to do the main works, and at the same rates
as are specified in the tender for the main work. Where, however, the works is to be executed
according to the designs, drawing and specifications recommended by the contractor and accepted by
the competent authority, the alteration above referred to shall be within the scope of such designs,
drawings, and specifications appended to the tender.
15. Rates for works not entered in Estimate or Schedule of Rate of the District
If the additional and altered work includes any class of work for which no rate is specified in this
contract, then such class of work shall be carried out the rates entered in the Schedule of Rates of the
Division or at the rate mutually agreed upon between the Executive Engineer and the contractor,
whichever are lower. If the additional or altered work for which no rate is entered in the Schedule of
Rates of the Division is ordered to be carried out before the rates agreed upon then the contractor
within seven days of date of receipt by him of the order to carry out the work inform the Executive
Engineer for the rate which in his intension to charge for such class of work and if the Executive
Engineer does not agree to this rate he shall be noticed in writing be at liberty to cancel his order to
carry out such class of work and arrange to carry it out in such manner as he may consider advisable
provided always that if the rates shall have been determined as lastly here in before mentioned then in
such case he shall only be entitled to be paid in respect of the work carried out or expenditure incurred
by him prior to the date of the determination of the rate as aforesaid according to such rate or rates as
shall be fixed by the Executive Engineer. In the event of dispute, the decision of the Superintending
Engineer of the Circle will be final.
16. Extension of Time Limit in consequence of Addition or Alteration.
The time limit for the work shall be extended in the proportion that the increase in its cost occasioned
by alterations or additions bears to the cost of the original contract work and the certificate of the
Engineer-in-charge as to such proportions shall be conclusive. No compensation shall be payable for
Alternation in or Restriction of Work to be carried out. If at any time, after the execution of the contract
documents the Engineer-in-charge shall, for any reason whatsoever, require the whole or any part of
the work, as specified in the tender, to be stopped for any period or shall not require he whole or part of
the work to be carried out at all or to be carried out by the contractor, he shall give notice in writing of
the fact to the contractor who shall thereupon suspend or stop the work totally or partially as the case
may be in any such case, except as provided here under the contractor shall have no claim to any
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
payment or compensation what so ever on account of any profit or advantage which he might have
derived from the execution, of the work in full but which he did not so derive in consequence of the full
amount of work not having been carried out or on account of any loss that he may be put to on account
of materials purchased or agree to be purchased or for unemployment of labour recruited by him. He
shall not also have any; claim for compensation by reason of any alterations having been made in the
original specification, drawings, designs and instructions which may involve any curtailment of the work
as originally contemplated.
17. No claim to compensation on account of loss due to delay in supply of materials by
The contractor shall not be entitled to claim any compensation from Corporation for the loss suffered by
him on account of delay by Corporation in the supply of materials entered in Schedule-A where such
delay is caused by: Difficulties relating to supply of railway wagons
III.Any other reasonable cause beyond the control of Corporation including Shortage of materials to be
supplied by the Corporations & difficulties in time by reaching at the site of any materials equipment. In
the case of such delay in the supply of materials, Corporation shall grant such extension of time for the
completion of the works as shall appear to the Executive Engineer to be reasonable in accordance with
circumstances of the case. The decision in the Executive Engineer as to the extension of time shall be
accepted as final by the contractor.
18. Time Limit for Compensation Claims
Under no circumstances, whatsoever, shall the contractor be entitled to any compensation from
Corporation on any account unless the contractor has claimed in writing to the Executive Engineer
within one month of the cause thereof.
19. Action and Compensation payable in case of Bad Work
If at any time, before the security deposit is refunded to the contractor, it shall appear to the Executive
Engineer or his subordinate in charge of the work that any work has been executed with unsound,
imperfect or unskillful workmanship or with materials of inferior quality or that any materials or articles
provided by him for the execution of the work are unsound or of a inferior quality to that contracted for
or are otherwise not in accordance with the contract, it shall be lawful for Engineer-in-charge to intimate
this fact in writing to the contractor and then no withstanding the fact that the work, materials or articles
complained of, may have been inadvertently passed, certified and paid for, the contractor shall be
bound forthwith to rectify or remove and reconstruct the work so specified in whole or any part, as the
case may require or if so required shall remove the materials or articles so specified and provided other
suitable materials or articles at his own charge and cost, and in the event of his failing to do so within a
period to be specified by the Engineer-in-charge in the written intimation aforesaid the contractor shall
be liable to pay compensation at the rate of one percent on the amount of the estimate for every day,
not exceeding ten days during which the failure so continue and in the event of any such failure as
aforesaid the Engineer-in-charge may rectify or remove and re-execute the work or remove and replace
the materials or articles complained of, as the case may be, at the risk and expense in all respects of
contractor should the Engineer-in-charge consider that any such inferior work or materials as described
above may be accepted, or made use of, it shall be within his discretion to accept the same as such
reduced rates as he may fix thereof. Provided that in the case of any work of which visible check is not
possible, if the Engineer-in - charge or his subordinate in charge of the work feels that such work has
been executed with unsound, imperfect or unskillful workmanship or with materials of inferior quality, he
shall take sample tests at random, cost of which shall have to be borne by the contractor and if after
taking such test, part of such work is found to be defective in any respect or to have been executed
with materials of inferior quality, then the contractor shall be paid for the whole work such amount as
may be fixed by the office of the Engineer-in-charge on the basis of the lowest quality of work found by
him in such samples tests.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Sample Test shall mean:
(i) In relation to poles fixed as line supports, the token of one pole out of every 100 poles after taking it out
from its foundation for inspection.
(ii) In relation to any other work, such test as may be considered necessary, by the Engineer-in - charge or
his subordinate in charge of the work.
Explanation: II
Cost of the sample test shall mean cost incurred for the purpose of taking Samples & test and for
restoring tested work to its original condition.
20. Work to be opened to Inspection, Contractor or Responsible Agent to be present
All works under execution or in course of execution in pursuance of the contract shall at all times be
open to the inspection and supervision of the Executive Engineer and his subordinate and contractor
shall at all times, during the usual working hours and at all other times at which reasonable notice of the
intension of the Executive Engineer or his subordinates to visit the works shall have been given to the
contractor, during which period either he should be present to receive order and instruction, or have a
responsible agent duly accredited in writing, present for that purpose. Orders given to the contractor’s
duly authorized Agent shall be considered to have the same force and effect as if they had been given
to the contractor himself.
21. Notice to be given before work is covered up.
The contractor shall give not less than 5 days’ notice in writing to the Executive Engineer or his
subordinates in charge of the work, before covering up or otherwise placing beyond the reach of
measurement of any work, in order that the same may be measured and correct dimensions thereof,
taken before the same is so covered up or placed beyond the reach of measurement and shall not
covered up or placed beyond the reach of measurement and work without the consent in writing of
Executive Engineer or his subordinate in charge of work, If any work shall be covered up or placed
beyond the reach without such notice having been given or consent obtained, the same shall be
uncovered at the contractor’s expense, and in default thereof, no payment or allowance shall be made
for such work, or for the materials, with which the same, was executed.
22. Contractor’s Liabilities
The Contractor shall supply, at his own cost, all materials (except such special materials, if any as may
be supplied form the Corporation stored in accordance with the contract) plant, tools, appliances,
implements, ladders, cordage, tackles, scaffolding and any temporary works which may be required for
the proper execution of the work., in the original, altered or substituted form and whether included in the
specification or other document forming part of the contract or referred to in these conditions or not and
which may be necessary for the purpose of satisfying or complying with the requirements of the
Engineer-in-charge as to any matter on which under these conditions, he is entitled to be satisfied or
which he is entitled to require together with carriage thereof to and from the work, the contractor shall
also supply without charge, the requisite number of persons for setting out works, and counting,
weighting and assisting in the measurement of, examinations at the time and from time to time of the
work or materials, failing this, the same may be provided by the Engineer-in-charge at the expenses of
the contractor and the expenses may be deducted from any money due to the contractor under the
contract or from his security deposit or the proceeds of sale thereof or of a sufficient portion thereof the
contractor shall provide all necessary fencing and light required to protect the public from accident and
shall also be bound to bear expenses of defense of every suit, action or other legal proceedings of law
that may be brought by any person for injury sustained. Owing to neglect of the above precautions and
to pay any damage and costs which may be awarded in any such suit, action or proceedings to any
such persons or which may with the consent of the contractor be paid in compromising any claim by
any such person.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
23. Contractor Liable for all Damages
Compensation for all damage done intentionally or unintentionally by contractor’s laborer, whether in or
beyond the limit of Corporation’s property, shall be estimated by the Executive Engineer, or such other
office, as he may appoint and the estimate of the Executive Engineer, subject to the decision of the
Superintending Engineer, on appeal, shall be final and the contractor shall be bound to pay the amount
of the assessed compensation demand, failing which, the same will be recovered from the contractor
as damages or deducted by the Engineer in charge from any sums that may be due to or become due
from Corporation to the contractor under this contract or otherwise. The contractor shall bear the
expenses of defending any action or other legal proceedings that may be brought by any person for
injury sustained by him owing to neglect of precautions to prevent the spread of fire and he shall also
pay any damage and costs that may be awarded by the court if in consequence.
24. Rescission of Contract and Forfeiture of Deposit.
The contractor shall not assign or sublet, without the written approval of the Engineer-in-charge and if
the contractor assign or sublet his contract, or attempt to do so or become insolvent or commence any
proceedings to be adjudicated as insolvent or make any composition with creditors, attempt to do so,
the Engineer-in-charge may, by notice in writing rescind the contract. Also, if any bribe, gratuity, gift,
loan, perquisite, reward or advantage pecuniary or otherwise shall either directly or indirectly be given,
promised or offered by the contractor or any of his servants, or agents, or any person to the employee
of Corporation in any way relating to his office or employment or if nay such officers or persons shall
become in any way directly or indirectly interested in the contract, the Executive Engineer may, by
day’s notice in writing, rescind the contract. In the event of a contract being rescinded the Security
Deposit of the contractor shall there upon stand forfeited and be absolutely at the disposal of
Corporation and the same consequences shall ensure as it the contract has been rescinded under
clause 4 thereof and in addition the contractor shall not be entitled to recover or be paid for any work
thereof actually performed under the contract.
25. Compensation
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of Corporation, without reference to
the actual loss or damage sustained and whether any damage has not been sustained.
26. Change in the constitution of firm to be notified
In the case of tender by partners of a firm, any change in the constitution of firm shall be forthwith
notified by the contractor to the Executive Engineer for his information.
27. Works under direction of Superintending Engineer.
All works to be executed under the contract shall be executed under the direction and subject to the
approval of the Superintending Engineer of the Circle, Engineer-in-charge for the time being who shall
be entitled to direct at what point or points and in what manner they are to be commenced and from
time to time carried on.
28. Decision of Superintending Engineer to be final.
Except where otherwise specified in contract and subject to the power delegated to him by Corporation
under the Corporation’s rule, then in force the decision of the Superintending Engineer of the Circle /
EIC. for the time being shall be final, conclusive and binding on all of the specification, designs,
drawings and instructions herein before mentioned and as to the quality of workmanship or material
used on the or as to any other question, claim, right matter or thing whatsoever in any way arising out
of or relating to the contract, designs, drawings, specifications, estimates, instructions, orders or these
conditions or otherwise concerning, the works or the execution or failure to execute the same, whether
arising during the progress of the work or after the completion or abandonment thereof.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
29. Arbitration
🔹 Dispute Resolution Mechanism
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this
contract with reference to the construction, interpretation, breach, termination or validity thereof
(hereinafter referred to as “the Dispute”) shall, upon the written request of either Party, be referred to
the authorized representatives of the Disputing Parties for resolution. The authorized representatives
shall promptly meet and attempt to negotiate in good faith a resolution of the Dispute within thirty (30)
days of the service of the request.
(2) Arbitration
If the Parties fail to amicably resolve the disputes or differences or contrary claims as indicated in sub-
clause (1) of Clause 29, arising under or in connection with the present works contract, whether
pertaining to works contracts alone or works and procurement both, the same shall be referred to
arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
The reference to arbitration proceedings under this clause shall not:
a) Affect the right of the Engineer-in-charge to take possession of all or any tools, plants, materials and
stores, in or upon the work or site thereof or belonging to the contractor or procured by him and
intended to be used for the execution of the work or any part thereof.
b) Preclude the Engineer-in-charge from utilizing the materials purchased by the Contractor in any work or
from removing such materials to other place, during the period the work is stopped or suspended in
pursuance of notice given to the contractor under General Conditions.
c) Entitle the contractor to stop the progress of the work or carrying out the additional or altered work in
accordance with the provision of General Conditions for the work where there is no specification.
d) Preclude the Corporation from getting the work done by another agency.
Neither party is entitled to bring a claim to arbitration latest by the thirty days after the expiration of the
defect’s liability period.
The provisions of the Arbitration & conciliation Act, 1996, Gujarat Public Works Contract Disputes
Arbitration Tribunal Act, 1992 and rules made there under shall apply to the arbitration proceeding
under this clause.
30. Stores to be obtained from Corporation
The Contractor shall obtain from the Corporation Stores, such articles as are mentioned in Schedule ‘A’
which may be required for the work or any part of the work or in making up any articles required
therefore or in connection therewith, unless he has obtained permission in writing from the Executive
Engineer or obtained such stores and articles from elsewhere. The value of such stores and articles as
may be supplied to the contractor by the Engineer-in-charge will be debited to the contractor in his
account at the rate shown in the Schedule “A” attached the contractor and if they are not entered in
said schedule they shall debited to him at cost price which for the purpose of this contract shall include
cost of carriage and all other expenses whatsoever which may have to be incurred in obtaining delivery
of the same at the stores aforesaid and further overhead charges 15%. The Contractor shall be
responsible for the loss destruction or deterioration of the materials, stores or articles supplied to him
by the Corporation, even if such loss destruction or deterioration has occurred under any
circumstances whatsoever beyond his control as if the material, stores or articles so supplied were his
property. The contractor shall be responsible for returning the residual materials after completion of the
contract and if fails to return, the balance material supplied to him by the Corporation, the cost of the
residual materials will be recovered from the contractor at the market rate or stock issue rate whichever
be higher at the time of materials account plus 15%.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
31.1 Lump Sum in Estimate
When the estimate on which tender is made, includes lump sums in respect of parts of the works the
contractor shall be entitled to payment in respect of the items of works involved or the part of the work
in question at the same rates as are payable under this contract or such items or if the part of work in
question is not in the opinion of the Engineer-in-charge capable to measurement the Engineer-in-
charge may at his discretion pay the lump sum amount entered in the estimate and the certificate in
writing of the Engineer shall be final and conclusive against the contractor with regard to any sum or
sums payable to him under the provisions of the clause.
32. Lump Sum Tenders
Whenever lump sum tenders have been invited for building or other structures of the same type,
design, the contractor shall submit his bill stated in Clause No.11 and the Engineer-in-charge not below
the rank of Executive Engineer shall certify by general measurement or by other method considered
suitable to him, the value of work done and the contractor shall be paid monthly a sum equal to 90% of
the total value the work so certified, since the last payment, after deducting a part or whole of the
secured advance if not already paid for the materials utilized on the works. An additional secured
advance for any fresh materials brought on site will also be paid if certified by the officer not below the
rank of Executive Engineer. After the work is completed, final bill would be paid on the certification of
officer not below the rank of Executive Engineer, that the work is done according to drawing and
specifications attached to the tender. If any additions and alteration have been carried out, detailed
measurements in respect thereof shall be recorded and extra payment or deductions are regulated as
per item rates quoted by the contractor while submitting the tender and if there are any items in the
additions and alterations for which the contractor has not quoted a rate, the payment shall be as per
Clause 15 above.
33. Action where no specifications.
In the case of any class of work for which there is no such specifications as is mentioned in clause
such work shall be carried out in accordance with the divisional specifications and in there event of
there being no divisional specifications, the work shall be carried out in all respects in accordance with
the instructions and requirements of the Engineer-in-charge / consultant of the Corporation etc.
34. Industrial Labour Laws
1.Wages to be paid and time of payment etc. by the Contractor: -
a) The contractor shall pay minimum wages as fixed under Minimum Wages Act whichever is higher. The
wages of every contract labour employed by him under this contract shall be paid by him before the
expiry of 7th day of the last day of the month in respect of which the wages are payable (i.e. wages of a
month have to be paid by him in the first week of the next month). The payment shall be disbursed in
presence of Management Representative during the working hours in factory premises and the
contractor shall get the entries certified in the register of wages by the Representative of the
Corporation. Any default will result in cancellation of contract forthwith or else the contractor shall be
punishable to the extent of Rs.100/- fine per each day.
b) The contractor shall give his telephone number and address to the Corporation so that in case of labour
trouble etc., the contractor can be contacted. The contractor shall arrange to have his office outside the
factory premises and the contractor keep himself present throughout the working hours.
a) Persons below the age of 18 years shall not be employed for the work.
b) No female worker shall be employed in the night shift between 7.00 p.m. to 6.00 a.m.
c) Contractor shall maintain a valid labour license under the Contract Labour (Regulation and Abolition
Act) for employing necessary manpower to be required by him. In the absence of such license the
contractor shall be liable to be terminated without assigning any reason thereof.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
d) The contractor shall at his own expense comply with all labour laws and keep the Corporation
indemnified in respect thereof. Some of the major liabilities under various labour and industrial laws
which the contractor shall comply with are as under:
i. Payment of contribution of wages of employer’s contributions towards Provident Fund, Family Pension
Scheme, Deposit Linked Insurance Scheme, Administrative Charges etc. at the rates made applicable
from time to time by Government of Gujarat / Government of India or other Statutory Authorities.
ii. Payment of deposit in respect of each contract labour of the rate of RS.30/- with the office of the
Commissioner of Labour as per the Contract Labour Act (Regulation & Abolition).
iii. License Fee as prescribed under the contract Labour Act (Regulation and Abolition) and Rules framed
there under depending upon the number of workmen employed by the contractor.
iv. Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for every
20 days of working.
v. Identity cards as prescribed under the factories Act with photo affixed thereto, the same for
identification.
vi. Payment of retrenchment compensation, notice pay and other liabilities as per Industrial Disputes Act.
Any payment to the contractor’s employees arising out of any claim of disputes under the Industrial
Disputes Act – 1947 or any other laws.
vii. Provision of compensation in the case of accidental injury.
viii. Payment of crèche if the female labour employed is more than 30 numbers
ix. Maternity leave as per the provision of the Maternity Benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities prescribed
under the various Labour Las in force from time to time from Statutory Authorities like State
Government / Government of India which the contractor shall have to comply with.
2. Provident Fund and Family Pension Scheme
The contractor shall submit along with his bill (month wise) a statement regarding deductions against
employee’s provident fund and family pension scheme in respect of each concerned employees’
Provident Fund and Family Pension scheme at the rate of 12 % (or at the rates made applicable by the
Government from time to time) of the wages. Contractor’s contribution and his workers contribution
towards provident fund and family pension scheme shall be deposited by the contractor with regional
Provident Fund Commissioner, Ahmedabad.
3. Deposit Linked Insurance Scheme: -
The contractor shall have to deposit ½ % of the wages in-respect of employees who is a member of the
Provident Fund as the contribution to the Deposit Linked Insurance Scheme with Regional Fund
Commissioner, Ahmedabad.
4. Administrative Charges: -
Administrative charges for maintaining Provident Fund Account shall be deposited by the contractor
with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
5. Paid Leave Facility
Paid leave facility at the rate of one day for every 20 days worked by the contract laborer shall be
provided by the contractor to his workers. He shall maintain Leave records/ Leave Cards for individual
laborer which shall be duly verified and approved/ certified by the authorized officer of the Corporation.
6. Workmen’s Compensation Fund and Employers Liability Insurance: -
The contractor shall cover all his employees under Workmen’s Compensation Fund and under the
Liability Insurance. The contractor shall employ adequate number of experienced staff at site for daily
supervision and for maintenance of various registers and records required under the law and contract.
No payment for supervision shall be admissible.
7. Contractor to Indemnify to the Corporation
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
The contractor shall indemnify and keep indemnified the Corporation and every officer and employees
of the Corporation and also Engineer-In-Charge and his staff against all actions, proceedings, claims,
demands, costs and expenses whatsoever arising out of or in connection with the matters referred in
above clauses and elsewhere and against all actions, proceedings, claims, demands, costs and
expenses which may be made against the Corporation by any workman/ employee of the contractor or
any sub-contractor and / or from any liability may arise to any workman / employees of the contractor or
any sub-contractor under any laws, rules or regulation having the force of law including but not limited
to claims against the owner under workman’s compensation Act, 1923. The employee’s Provident Act
1952, and / or the contract
Labour (Abolition and Regulation) Act 1979. The Corporation shall not be liable for or in respect of or in
consequence of any accident or injury to any workmen or other person in the employment of the
contractor or his sub-contractors, and the contractor shall indemnify and keep indemnified the
Corporation against all such damage and compensation and against all claims, demands, proceedings
costs, charges and expenses whatsoever in respect thereof or in relation thereto.
8. Workmen’s Compensation and Employer’s Liability Insurance: -
Insurance shall be affected for all the contractors for all the contractor’s employees engaged in the
performance of this contract. If any of the work is sublet to the sub-contractor, the contractor shall
require that he or his sub-contractor to provide workmen’s compensation and employer’s liability
insurance for the latter’s employees unless such employees recovered under the contractor’s
9. The Corporation reserves the right to terminate this rate contract at any time during it tendency without
giving notice of termination or any reasons thereof.
10.The Corporation will be entitled to deduct directly form the bills, to be paid to the Subcontractor and
Labourers any sum or sums payable by contractor and which sum/sums the Corporation is required to
pay as a principal employer on account of contractor’s default in respect of all liabilities referred to in
11. Nothing in the contract document stated shall any wise constitute any workmen/ employees of the
contractor or any sub-contractor as or to be workmen/employee of the power, or place obligation or
liability in respect of any such workmen/ employee upon the Corporation.
NOTE: -The Prevailing Act at the time of execution of work over and above act specified herein shall be
binding to the contractor
35. No Claim for Variation in Quantities of Work
Quantities shown in the tender are approximate and no claim shall be entertained for quantities of
work actually executed, being either more or less up to any extent than those entered in the tender or
less than those entered in the tender or estimate.
36. No Claim for Compensation for Delay in staring work
No compensation shall be allowed for any delay caused into starting of work on account of acquisition
of land and in the case of clearance for works or any delay in according sanction to estimates.
37. No Claim for Compensation for delay in execution of work
No compensation shall be allowed for any delay, in execution of the work on account of water standing
in borrow pits or compartment. The rates are inclusive for hard or cracked soil, excavation in mud, sub-
soil water or water standing in borrow pit and no claim for an extra rate shall be entertained unless
otherwise expressly specified & mentioned in the tender.
38. Entering upon or commencing any portion of work
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
The contractor shall not enter upon or commence any portion of work except with the written authority
or instructions of the Executive Engineer or his subordinate in charge of the work, failing such the
contractor shall have no claim to ask for measurement or payment for work.
39. Method of Payment
Payment to contractors shall be made by A/c payee Cheque provided the amount exceeds Rs.50/-.
Amount not exceeding Rs.50/- will be paid in cash. Generally, payment may take 30 to 60 days after
passing of bills depending on availability of fund.
40. Acceptance of conditions on tendering for work.
Submission to tender or acceptance of work order shall imply acceptance of these conditions of tender
41. Employment of Scarcity Labour
If government declares a state of scarcity or famine to exist in any village situated within 20kms of the
work, the piece worker / contractor shall employ upon such part of the work as are suitable for unskilled
labour; any person certified to him by the Executive Engineer or by any person to whom Executive
Engineer may have delegated this duty in writing to be in need of relief and shall be bound to pay such
person wage not below the minimum, which Government may have fixed in this behalf from time to
time. Any implementation of this clause shall be decided by the Superintending engineer / Engineer-in-
Charge whose decision shall be final and binding on the piece worker/contractor.
42. Employment of Technical Persons
The contractor who are registered under class ‘A’, ‘B’ and ‘C’ or such contractors who executes the
works of Rs.5 lakhs and above shall employ the technically qualified personnel possessing minimum a
Diploma of reconciled technical institution, for executing the work of the Corporation.
Date: Superintending Engineer (TR),
(Signature of Contractor) GETCO, Circle Office,
Address: Palanpur
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GENERAL CONDITIONS OF CONTRACT
1.0 Contactor to inform himself fully:
The contractor shall be deemed to have carefully examined the work & site conditions, the general
conditions, the special conditions, specifications, schedules, drawings shall be deemed to have visited
the site of the works & to
have fully informed himself regarding the local conditions. Copy of Appendix V attached with tender
shall have to be filled up before quoting the rate, for confirmation of site visit. If there shall have any
doubts as to the meaning of any portion of these general conditions or special conditions of the scope
of work of the specifications or any other matter concerning the contract, he shall in good time before
submitting his tender, send for the particulars thereof & submit them to the Engineer in writing in order
that such doubt may be removed.
2.0 Data to be furnished by Contractor:
Prior to the commencement of work the contractor shall submit a bar chart showing detailed
programme for completing the work within time limit to the S. E. for approval within a week of the date
of LOI. No change in the approved plan & layout shall be carried out without specific written approval
of the Executive Engineer in charge.
3.0 Errors, Omissions & Discrepancies:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or discrepancies in the
drawings & items of work on specifications, reference shall be made to the Executive Engineer whose
elucidation & elaboration shall be considered as authoritative. The contractor shall be held
responsible for any error that may occur in the work thorough lack of such reference.
1. Temporary structures may be erected by the contractor for storage sheds, offices, and residential etc.
for non-commercial use on land, handed over to him at his own expense & with the permission of the
Corporation. In any circumstances for constructing temporary structures contractor’s use, Corporation
free supply of materials shall not be made. If it is found that Corporation’s free supply material are used
for the works other than approved drawings, it will be recovered at penalized rate.
2. The contractor shall preserve all existing vegetation such as trees on or adjacent, to the works site
which, do not interfere with the construction as determined by the Corporation.
3. The contractor shall take all possible precautions in felling trees authorized for removal to avoid any
unnecessary damage to vegetation & trees not to be felled & to structures or to workmen, & shall be
responsible for any damage if it occurs in such operations.
4. All produce from cutting of trees grass etc. shall be the property of Corporation & shall be stacked at the
directed places. No claim shall be made for such tree felling / cutting &stacking of trees/produce or
grass etc. by the contractor.
5. The land shall as herein before mentioned be handed over to Corporation / Owner of Land immediately
after the completion of the work under this contract. Also no land shall be held by the contractor longer
than the Corporation shall deem fit & necessary & the contractor shall, on due notice by the
Corporation, vacate & return the land which the Engineer In Charge may certify as no longer required
by the contractor for purposes of the work.
5.0 Start of Work:
The contractor shall not enter upon or commence any portion of the work except with the written
permission of the authority of the Corporation, failing which the contractor shall have no claim to ask for
measurement of or payment for work & shall be responsible for any claims or damages that may arise
due to such unauthorized commencement or entry. No compensation shall be allowed for any delay
caused in starting the work on account of any delay in clearance of the work site.
6.0 Work to execute to the satisfaction of the Corporation’s Engineers:
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
The contractor shall proceed with the work with diligence & expedition & the whole of the work herein
specified as well as the mode of execution shall be under the supervision & the direction & shall be
carried on to the entire satisfaction of the Corporation’s site Engineers, who shall have full powers to
order the contractor to alter, enlarge or diminish the form, dimensions, positions, or quantities of any of
the work or to make use of materials & workmanship of different descriptions & qualities from this
herein specified. In the case of any class of work for which there are no Technical Specifications, these
shall be carried out in accordance with the latest IS Codes & in the event of being no relevant IS Code,
the works shall be carried out in accordance with the directions & instructions of the Corporation’s
Engineers at site.
7.0 Workmanship etc.:
The work shall be executed in thoroughly substantial manner with workmanship of best quality & strictly
in accordance with the specifications & with the drawings, or with such other drawings or written
instructions as may from time to time be furnished to the contractor, in accordance with terms of this
contract & shall be completed in every respect with workmanship implied & necessary according to the
fair interpretation & meaning of the same & should there be any discrepancy between the drawings &
specifications or any difference or dispute as to the dimensions to be worked out or the mode of doing
periodical quantity of the work to be executed or with respect to any subject arising out of this contract,
the decision of the Corporation’s authorized Engineers shall be final & binding on all parties.
8.0 Samples of descriptive Data:
Samples of descriptive data requiring approval shall be submitted by the Contractor to the
Corporation’s Engineers in good time before the use of such material to permit its inspection & testing
& there-by the approval. The samples shall be properly marked to show the name of material,
manufacture place or origin & the place where it is intended to be used etc. Failure of any samples to
pass specified tests requirements. It shall be sufficient cause for the refusal to consider any further
samples from that source.
9.0 Baselines & Grades:
The Corporation near to the site of work shall furnish one permanent Bench Mark. Semi-permanent
baselines & cross lines shall be established at sufficiently spaced intervals with benchmarks by the
Contractor at his own cost & risk. The contractor shall provide at his expense, all the required pillars,
equipment’s, materials, & labour for the establishment of the grade lines & bench marks, for that the
Contractor shall be responsible for their further maintenance during the execution of the actual work till
the complete period of construction. The contractor shall be responsible for the proper execution of
work to such lines & levels & grades as may be specified in the drawings, established, or indicated by
the Corporation’s Engineers. All the survey work, if required, shall be checked by the Corporation’s
engineers. However, this shall not absolve the contractor for the correctness of survey/ temporary or
permanent Benchmarks.
10.0 Contactor not to dispose off soil etc.:
The contractor shall not sell or otherwise dispose off or remove except for the purpose of this contract
the sand, ballast, earth, rock or other substances or materials that may be obtained from any execution
made for the purpose of this contract or produce upon the site at the time of delivery of the possession
of the land but also such substances materials & produce shall be the property of the Corporation &
shall be disposed off in the manner & place as directed by the Corporation’s Engineers.
11.0 Gold, silver, Minerals, Oil Relics, etc. found on the Site:
All gold silver, oil relics, or other minerals, of any description & all precious stones, coins, treasures
relic, antiquities, & other similar things that shall be found in or upon the site shall be the property of the
Corporation. The contractor shall return the gathered things as above to the authorized representative
of the Corporation.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
12.0 Fencing, lighting & ventilation:
The contractor shall be responsible for the proper lighting, fencing, guarding & taking of all the
necessary safety measures for all works comprised in the contract & or the proper provision of
temporary roadways, footways, guards fences, caution notices etc. as far as the same may be
rendered necessary by reasons for the work for the accommodation & protection of workmen foot
passenger or other traffic & of the Corporation & occupiers of adjacent villages, property of the public &
shall remain responsible for any accidents that may occur on account of his failure & timely
precautions. All the works & approaches shall be adequately illuminated with electric lights to the
satisfaction of the Corporation’s Engineers. The power & lighting connections, wiring equipment shall
be subject to the inspection & passing by Electrical Inspector to GOG authorized under the Indian
Electricity Act. Any additions alterations or omissions shall be got approved from the Corporation’s
Engineers got certified from the Electrical Inspector. Work spots such as faces of excavation of borrow
pits; filling area etc. shall be adequately illuminated with floodlights to the satisfaction of the
Corporation’s Engineers.
13.0 Explosive procurement & storage:
Explosives, petrol, oils, fuels, &other inflammable materials shall be stored strictly in accordance with
the rules of the Explosive Department.
The contractor shall at his own expense construct & maintain proper magazines which are required for
the storage of explosive & arrange for storage facilities for oils, petrol, fuels etc. for use in connection
with the work. The contractor shall at his own cost obtain the necessary license for the storage & use of
explosives, oils, petrol, diesel etc. The Corporation shall not take any responsibility whatsoever in
connection with the storage or use of explosives on the site, any accident occurs in the connection at
site or nearby village or vicinity. All operations of the contractor in which or for which explosives are
employed shall be at the risk of the contractor & upon his own responsibility.
14.0 Liability for accidents to persons:
14.0.1 The contractor or subcontractor shall indemnity the Corporation against any claims which may be
made under the workman’s compensation Act, 1923, or any statutory modification or otherwise for or in
respect of any damages or compensation payable in consequence of any accident or injury caused, by
fault of contractor or subcontractor &sustained by any workmen or other person on the employment of
the contractor or subcontractor. In every case in which by virtue of the provisions of subsection (1) of
section 12 of the workman’s Compensation Act, 1923, the Corporation is obliged to pay compensation
to a workman employed by the contactor or subcontractor in execution of the work, the Corporation will
recover from the contractor the amount of compensation so paid, and without prejudice to the rights of
the Corporation under subsection 12 of the said Act, such amount will be paid back to the Corporation
in 30 days, failing which the Corporation will be at liberty to recover such amount of any part thereof by
deducting it from the dues by the Corporation to the contractor under this contract or otherwise. The
Corporation shall not be bound to contract any claim made against either of them under section
subsection (1) of the said Act, except on written request from the contractor & upon his giving to the
Corporation full security for all costs for which the Corporation might become liable in consequence for
entertaining such claims.
14.0.2 The contractor and/or subcontractor named in the contract shall indemnity the Corporation against
all claims based upon injury or death to any person in the employment of the contractor or sub
contactor, or to the third parties under paragraph (a) 2 or condition no.47 to the extent of any sums
recovered under the insurance policy.
14.0.3 On occurrence of the accident which result on the death of workman employed by the contractor or
subcontractor, which is so serious as to be likely to result in the death of any workman, the contractor
shall within 24 hours of happening of such event intimate in writing to the Engineers of the Corporation
the fact of such accidents. The contractor or subcontractor shall indemnity the Corporation against all
loss or damage sustained, by the Corporation resulting directly or indirectly from his failure to give
intimation in the manner aforesaid including penalties or fine if any, payable by Corporation as a
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
consequence of Corporation’s failure, to give notice under workman’s compensation Act or otherwise to
confirm to the provisions of the said Act in regard to such accident.
Liability for damage to woks & materials:
14.0.4 The contractor shall during, the progress of the work, properly protect the works & the existing Ash
Disposal pipelines & materials placed at his disposal or acquired for him by the Corporation, & shall
remain answerable & liable for all accidents, damages. Loss etc. & shall be made good in the most
complete & substantial manner by & at the sole cost of the contractor & to the reasonable satisfaction
of the Corporation’s Engineers. If the contractor fails to make good such losses, damages within the
specified time given by the Corporation, the Corporation shall be at liberty to recover the amount
towards such expenses fixed by the Corporation’s Engineers & shall be recovered from the amount due
under this contract to the contractor.
14.0.5 Further the contractor shall, at all times, protect & preserve all materials, machinery, equipment’s,
Ash Disposal pipelines, allied structures such as spillway chambers, ADP, haul road and ramps etc.,
materials &so acquired by himself or Corporation for the execution of the work. All reasonable requests
of the Corporation’s Engineers to enclose or especially protect any of the above shall be expeditiously
complied with at no extra cost.
14.0.6 If the Engineer considers that the work, asked for in the aforesaid Para, is not sufficiently &
satisfactorily protected by the contractor, on requests made for, the Corporation shall be entitled to
arrange for such protection at his unfettered discretion & recover the cost thereof from the contractor.
14.0.7 Until the work shall be or deemed to be taken, over as aforesaid, the contractor shall also be liable
for &shall be deemed to have indemnified the Corporation in respect of all damage or injury to any
person or any property of the Corporation or of others in villages nearby, occasioned by the negligence
of the contractor or his workmen, or his subcontractor, or by defective /ill methods of working.
14.0.8 Materials, tools, machinery brought on the site of work: All materials, tools & tackles, machinery
etc. of the contractor brought to & delivered upon the site for the work shall be the time of their being so
brought shall be deemed to be the property of the Corporation in it’s possession to be used for the
purpose of the work & for that purpose only & shall not on any account be removed or taken away by
the contractor or any other person without the permission of the Corporation’s Engineers in charge, but
the contractor shall be fully responsible for & loss, destruction thereof or damage thereto. The
Corporation may have a lien on such materials, tools, tackles, machinery for any sum or sums which
may at any time prior to the completion of the works be or owing to the Corporation by the contractor,
under in respect of & dispose of any such materials, tools. Tackles, machinery in such a manner as
the Corporation may think fit & to apply the proceeds in or towards the satisfaction of such sum or sums
due or owing as aforesaid but subject to such lien & power of sale & disposal such surplus materials,
tools, tackles, machinery shall belong to the contractor & may be removed & disposed off by him as he
15.0 Access to site & work on site:
The Engineer or his authorized representative may if he considers fit from time to time enter upon any
lands which may be in the possession of the contractor under this contract, for the purpose of executing
any work not included in this contract & may execute by other contractors at his opinion & the
contractor shall in accordance with the requirements of the Engineer, afford all reasonable facilities for
execution of the works including occupation of lands by structure or otherwise for any other contractor
employed by the Corporation & his workmen or for the execution on or near site of the works not
included in the contract. The contractor shall not be entitled for any extra claims on such executions.
16.0 Inspection of Works:
The Corporation’s Engineers or their authorized representatives shall have at all times power to inspect
the works, wherever in progress, either on site, on the contractor’s premises in connection with this
contract. Further, the contractor shall not allow any person other than Corporation’s Engineers or their
authorized representatives to the work sites. The contractor shall, during working hours, maintain
supervisors of sufficient training & experience to supervise the work as a whole. All orders & directions
given to such supervisors or other staff shall be deemed to have been given to the contractor. Further
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
the Corporation may by due notice, desire a high-ranking member of the supervisor staff of the
contractor to be present on any specified inspection & the contractor shall comply with such directions.
17.0 Action & compensation payable in case of Bad Work:
If at any time before the refund of Security Deposit to the Contractor it appears to Gujarat Energy
Transmission Corporation’s Executive Engineers or subordinate and / or any authorized officer of the
Corporation that the work has been executed with unsound, imperfect or unskilled workmanship or with
materials of inferior quality or any materials or articles provided by him are unsound or of quality inferior
to that contracted as specified in the Technical Specifications or otherwise not in accordance with the
contract, it shall be lawful for the Gujarat Electricity Corporation to intimate that the works , materials,
articles which may have been inadvertently passed, certified & paid to the Contractor. The Contractor
shall be bound to rectify or remove & reconstruct the said work so specified at his own charge & cost &
in the event of being failure to do so within specified period by the Corporation, the Contractor shall be
liable to pay compensation at the rate of 1% per day on the amount of the estimate for the specified
work. For the period up to 10 days this shall be attended by the Contractor else the Corporation shall
get these rectifications at the risk & expense in all respects of the Contractor.
18.0 Cleaning up:
18.0.1 The contractor shall at all time keep the construction areas & his labour colony & storage areas free
from accumulation of waste, or rejected materials.
18.0.2 Prior to the completion of the work the contractor shall remove all rubbish from & about the
premises, & tools, tackles, machinery, left out materials consumable, rejected materials, scaffolding etc.
which are not the part of the permanent work/structure. The premises will be left fully satisfactorily to
the Corporation’s Engineers/representatives; thereafter only the completion certificate will be issued.
19.0 Contractor’s inventory of equipment’s & machinery:
The contractor shall prepare & maintain an inventory of all machinery, equipment’s, temporary rolling
stock, and plant purchased or hired for the use of this contract’s execution.
19.1 Progress Schedule:
Contractor shall furnish a Construction Schedule on receipt of LOI or Work Order whichever is earlier,
in quadruplicate, indicating the date of start, the monthly progress expected to be achieved &
anticipated completion of each major items of the work under this contract & procurement of
equipment’s, machinery & other materials. The schedule should be such as is practicable of
achievement the whole work in the time limit & of the particular items on due date specified in the
contract & shall have the approval of the Corporation’s Engineers. Detailed schedules for each working
season showing the progress month by month to be achieved is to be submitted to the Corporation.
The Corporation is empowered to ask for more detailed progress schedule week by week for any item
or for all items & the contractor shall comply when asked for.
19.2: The Corporation shall have, at all times the right without in any way violating this contract, or forming
grounds for claim to alter the order of the works or any part thereof & the contractor shall after receiving
such direction proceed in the order directed. The contractor shall revise the progress schedule
accordingly & submit to the Corporation in four copies.
19.3: The contractor shall furnish sufficient machinery, equipment, labourers & materials shall work for
such hours & shifts as may be necessary to maintain/achieve the progress of the scheduled, after
getting written permission of Engineer In Charge.
19.4 The progress schedules shall be in the form of bar charts, statements &/or reports as may be
necessary & directed by the Corporation’s representatives.
19.5.1 Unsatisfactory Progress: In the case of unsatisfactory progress by the contractor not proceeding as
per the Scheduled Programme approved by the Corporation, suitable actions shall be taken in
accordance with Clauses No. 3 & 4 of the booklet prescribed by the Corporation for ``Tender &
Contract for Works’’.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Recoveries due from the contractor, up to the end of the month previous to the one in which the bill is
prepared shall be made from bills approved for payment every month or at other periods when the bills are
prepared, for the enlisted, but not limited to, in the order of priorities & extents. (a) Penalty, if Levi able,
Expenditure, in full, incurred by the Corporation on contractor’s behalf in
labour, machinery, equipment etc.,
(b) Charges for services such as water & power supply, etc. in full,
(c) Hire charges for Corporation’s or Government machinery if any,
(d) Other recoveries not specifically mentioned but recoverable.
20.0 Date of completion:
The contractor shall complete the whole work & hand over to the Corporation on or before the date
specified in the work order. Provided always that if in the opinion of the Corporation the completion of
the works shall be delayed by any change of original design or by the order of the Corporation, of any
altered, modified substituted or additional works or materials omitted or by strikes, lock outs or
stoppages of labour, or revolution, riots, civil or political disturbance or by the contractor not being given
possession of the site or by the Corporation taking possession of & using the site or part thereof or the
works or part thereof or any part of the work or delayed supply of material by the Corporation or by the
not receiving any orders, drawings, instructions or directions in time or by the suspensions if the works
or by fire, flood exceptionally bad weather tempest , storm or by from unforeseen circumstances(&
whether the same shall be due to any act or omission of the Corporation or it’s representatives) the
Corporation may in the unfettered discretion thinks fit either forthwith or at a later time & from time to
time not withstanding that the prescribed or extended time for completion has expired or work have
been completed, extend the date for the completion of the works to such a date as deemed fit as
practical & acceptable.
21.0 Subletting of contract:
There will be generally no objection on the component parts if the work, being given over to responsible
subcontractors but Corporation shall under no circumstances recognize these subcontractors & the
responsibility of executing the work in the accordance with the conditions of contract will entirely rest on
the main contractor. However written consent of EIC shall be obtained before subletting. The main
contractor will therefore always have the very responsible member, preferably a technical hand present
on the works with power to sign all work orders issued on the site of work & to take requisite actions in
the interest of efficient execution of work.
22.0 Other contracts for the suspension stoppage or curtailments of work:
If during the tendency of the contract the Engineer shall for any reason (which shall be unquestioned)
whatsoever require the whole or any part of the work as specified in the contract to be suspended for
any period or shall not require the whole or any part of the work as specified in the contract to be
carried out at all by the contractor, he shall give notice in writing of the fact to the contractor who shall
thereupon suspend or stop the work totally or partially as the case may be. In any case except as
provided hereunder, the contractor shall have no claim to any payment or compensation whatsoever on
account of any profit or advantage which he might have derived from the execution of the work in full
but he did not so derive in consequence of the full amount of the work not having being carried out, or
on account of any loss that he may be put on account of materials purchased or agreed to be
purchased or for unemployment of labour recruited by him. He shall not also have any claim for
compensation but reason of any alterations having been made in the original specifications, drawings,
designs & instructions that may involve any curtailment of the work as originally contemplated. Where
however, materials have already been purchased or agreed to be purchased by the contractor, before
receipt of the aforesaid notice, the contractor shall be paid for such materials at the rate determined by
the Corporation, provided they would have been useful for the work curtailed or stopped are not in
excess of requirements are of approved quality & cannot be used on other contract works or otherwise
by the contractor &/or shall be compensated for the loss if any, that he may put to, on respect of
materials agreed to be purchased by him, the amount of such compensation to be determined by the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Corporation, whose decision shall be final. The Corporation may order the contractor to suspend any
work on account of bad weather; rain or storm & such other adverse climate conditions & the contractor
shall comply with the same. The contractor shall not be entitled to any compensation for such
suspensions of work.
23.0 Other contractors:
Apart from this work, the other works connected with this work will be simultaneously going on either
departmentally or through any other contractors. The contractors shall co-operate with others to their
fullest extent & shall allow each other every facility & coordination for the execution of their works
simultaneously & satisfactorily, during their action of machinery or execution of any other co-ordination
works, the contractor will have to co-operate as directed buy the Corporation’s Engineers in the charge
of the works. In such cases the contractor shall not be entitled for any compensation on account of
reduction or stoppage of labour force/machinery/equipment’s etc. In the matter of dumps, haul, roads,
drainage, diversion & the like, each contractor shall take into considerations the needs & the
requirements of the other contractors if any working in the vicinity. Further no contractor shall take or
cause to be taken any stops or action that may cause disruption, discontent or disturbance to the work,
labour arrangements etc. to other contractors. Any action, by any contractor, which the Corporation in
the unquestioned discretion may consider as infringement of the above code, would be considered as a
breach of the contract conditions & the Corporation may take such action as may deem fit against the
contractor & the action taken shall be considered as final & binding.
24.0 Speed of work:
The contractor shall at all times maintain the speed of work to confirm to the latest operative progress
schedule but the Corporation may at any time with sufficient notice in writing direct the contractor to
slow down or to accelerate any part or the whole work for any reason (which shall not be questioned
whatsoever) & the contractor shall comply with such orders of the Corporation. The compliance of such
orders shall not entitle the contractor to any claim or compensation.
25.0 Contract document & matters to be treated as confidential:
All documents, correspondence, decision & other matters concerning the contract shall be considered
as of confident & restricted nature by the contractor & he shall not divulge or allow access there to any
unauthorized persons of any kind.
26.0 Access to the contractor’s book:
Whenever it is considered necessary by the Corporation to ascertain the actual cost for execution of
any particular item of work, the Corporation may do so by directing the contractor to produce the
original invoices.
27.0 Interest on money due to the contractor:
The contractor shall not be entitled to receive the interest on the payment due to him upon
measurements or otherwise or on any balance payable to the contractor. Also, contractor shall not be
allowed to relate it with the progress of work at site in any case.
28.0 Measurements to be provisional & subject to correction:
Every measurement for running payment on account of work done shall be subject to adjustment or
final measurements. In case there is disagreement between such intermediate & final measurements,
the latter shall prevail.
29.0 R. A Bills:
The contractor shall submit his R/A bill every month, which shall be processed in reasonable time after
checking and recording the MB. The contractor shall be responsible to submit R/A bills well in time and
shall depute his representative for joint checking of the measurements; so that the bills can be
processed in time. The contractor shall take due care in this regard, failing to which consequences will
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects and
Contractor shall get registered under Welfare Cess Act before commencement of work. Office of the
Factory Inspector is authorized at present as a registering authority.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of documentary
evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO, then contractors
shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive basis of
utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to the
contractor on receipt of request letter along with documentary evidence of payment. For calculation of
welfare cess on supply part, valuation as per MR shall be taken and informed to the contractor for
payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit
the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of final bill,the contractor has to submit documentary evidence of payment of
welfare cess of previous R.A.Bill as well as of this final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has to submit
documentary evidence of registration under Welfare Cess Act and evidence of payment of welfare
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary evidence
of payment by observing due formalities.
30.0 Breach on part of Corporation not to annul contract:
No breach or non-observance on the part of the Corporation of any the agreements contained
Herein, shall annul this contract of discharge the contractor from the observance & performance
thereof, or of any part thereof, but on application by the contractor & in the unfettered discretion of the
Corporation an extension of time may be given to the contractor in respect of such breach or non-
observance by the Corporation.
31.0 Labour conditions:
31.1 The contactor shall comply with the labour laws laid as may be current & shall furnish the returns &
information as may be specified from time to time.
31.2 The contractor shall as far as possible obtain his requirements of labour, skilled & unskilled from the
31.3 The contractor shall pay wages as per the latest circulars applicable at the times for the minimum
wages to be paid to unskilled, semiskilled & skilled labour prescribed by the Govt. of Gujarat.
31.4 The Corporation shall have the authority to remove from the work site any person, who may be
considered unfit or undesirable & no responsibility shall be accepted by the Corporation for any delay
or extra expense caused towards the completion of the work by such removal.
31.5 If Govt. declares a state of scarcity or famine to exist in any village situated within 10 Km. of the work
site then the piece worker or contractor shall employ upon such parts of work, as are suitable for
unskilled labour any person certified by the Corporation or by any person to whom the Corporation has
authorized, & shall pay the minimum wages as fixed by the Govt. of Gujarat in this behalf. Any dispute
that may arise in the implementation of the clause the decision of the Supdt. Engineer (civil) shall be
final & binding.
31.6 The contractor shall provide reasonable facilities to the labour employed by him. The usual facilities
are weather proof shelter for rest & meal, supply of whole some drinking water, facilities for obtaining
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
food, reasonable washing & sanitary facilities, special facilities for women workers, suitable residential
accommodation, general sanitation & health measures etc.
31.7 The implementation of any & all provisions of this clause in no way entitles the contractor to claim in
32. Local Laws:
31.1 All local laws in force at the time entering into the contract & those enacted there after shall be
binding on the contractor & he shall abide by the same.
All import duties, sales tax & other local taxes shall be borne by the contractor & they shall be deemed
to have covered by this quoted rate.
33. Performa returns:
The contractor shall maintain proforma, charts & details regarding machinery, equipment’s, materials
labour, personnel & other matters as may be specified by the Corporation time to time.
34.Maintenance:
The contractor shall maintain the works under contract for a period of one year from actual date of
completion and during this period all maintenance expenditure incurred shall be borne by the
The contractor shall procure, or arrange for the Subcontractor to procure insurance coverage in
amounts approved by the Corporation & sufficient to protect against the following risks arising out of the
work. Accidents & professional & non-professional sickness of all labourers & personnel engaged in the
work as required by Law pursuant to Workmen’s Compensation Act, 1923 or Revised version thereof.
Injury or death to third parties including without limitation injury or death caused by any of the
construction aids or vehicles or rented machinery, equipment’s used by the contractor or subcontractor
whether at the site or elsewhere. Damage to contractors’ tools machinery construction equipment’s
form works, scaffolding materials etc. due to floods, earthquake or any such cause. Damage to the
existing permanent structures of the Corporation & nearby villages, equipment’s of the Corporation or
of the co-contractors working in the area for other works.
All the above conditions referred for the insurance cover, shall be in effect from the date of
commencement of the work until the Corporation has accepted the work. In the policies covering the
insurances referred to above, the Corporation, contractor & the subcontractor shall be as co-ensured
where possible.
The cost of insurance shall be borne by the contractor.
Final payment to the contractor shall not be made until the contractor shall deliver to the Corporation
receipts in full in lieu thereof, & in either case, an affidavit that so far he has knowledge or information
the releases & materials for which in lien could be filed. If any lien remains unsatisfied after all the
payments are made, the contractor shall refund to the Corporation all money that the latter may be
compelled to pay in discharging such a lien, including all costs & a reasonable attorney.
37.RIGHTS OF THE OWNER
Whenever any claim or claims for payment of a sum of money arises out of or under the contract
against the contractor, the Owner shall be entitled to withhold and also have lien to retain such sum or
sums in whole or in part from the security, if any, deposited by the contractor and for the purpose
aforesaid, the Owner shall be entitled to encash and withhold the amount of Performance Bank
Guarantee or other security, if any, furnished as the case may be. The Owner shall also heave o lien
over the same pending finalization or adjudication of any such claim. ln the event of the security is
insufficient to cover the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
claimed amount or amounts, the Owner shall be entitled to withhold and have lien to retain to the extent
of the such claimed amount or amounts referred to above, from any sum or sums found payable or
which at any time-thereafter may become payable to the Contractor under the same contract or any
other contract with the Owner or GUVNL or its subsidiary companies pending finalization or
adjudication of any such claim.
Lien in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (including the security deposit) under the
contract may be withheld or retained by way of lien by the Owner against any of its claim in respect of
payment of a sum of money arising out of or under any other contract made by the contractor with the
owner or GUVNL or any of its subsidiary companies.
b) lt is an agreed that the sum of money so withheld or retained under this clause by the Owner will be
kept withheld or retained as such by the owner till its claim arising out of the same contract or any
other contract is either mutually settled or determined by the arbitrator or competent court, as the
case may be, and the Contractor shall have no claim for interest or damages whatsoever on this
account or on any other ground in respect of any sum of money withheld or retained under this clause
and as moy be duly notified to the contractor."
38. Relationship with employee: -
Every bidder, at the time of submission of bid. Give a declaration as under
“If any bidder company/firm, the interest (i.e., Shareholding in Company and share in partnership firm) of
any empyee of the tendering company or his/her relative as defined in Section 2(77) of the Company’s act
2013 is 10% or more, the tendering Company will not deal with such Company/Firm at all.
Tendered therefore, must specifically disclose this fact in his technical bid. Non-disclosure of such facts
would immediately disqualify the tenderer for further dealing with the tendering company.
39. Conflict of Interest among Bidders/ Agents
A bidder shall not have conflict of interest with other bidders for particular quoted item. Such conflict of
interest can lead to anti-competitive practices to the detriment of Procuring Entity’s interests. The
bidder found to have a conflict of interest shall be disqualified. A bidder may be considered to have a
conflict of interest with one or more parties in this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from any of them; or
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that puts them in a
position to have access to information about or influence on the bid of another bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a bidder in more than
one Bid will result in the disqualification of all bids in which the parties are involved. However, this does
not limit the inclusion of the components/ sub-assembly/ assemblies from one bidding manufacturer in
more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal manufacturers, one
agent cannot represent two manufacturers or quote on their behalf in a particular tender enquiry. One
manufacturer can also authorize only one agent/ dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design or technical
specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units, or more than
one unit having common business ownership/ management, only one unit should quote. Similar
restrictions would apply to closely related sister companies. Bidders must proactively declare such
sister/ common business/ management units in same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as amended from
Every bidder should, at the time of submission of bid, give a declaration, that bidder shall not have conflict
of interest with other bidders, as above.
40. Use of Call before you dig (CBUD) App
All the excavators/excavating agencies engaged by “GETCO (Gujarat Energy Transmission Corporation
Limited) must self-register “Call Before you Dig (CBUD) app as excavator
All digging agencies/Contractors must be mandated to do any type of digging/excavation only after prior
intimation through CBUD Mobile app.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
TECHNICAL SPECIFICATIONS
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GUJARAT ENERGY TRANSMISSION
CORPORATION LTD.
SARADAR PATEL VIDYUT BHAVAN,
RACE COURSE, BARODA – 390
GETCO/C/TS - GEOTECH/R1, JULY
TECHNICAL SPECIFICATIONS
GEOTECHNICAL INVESTIGATION
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GEOTECHNICAL INVESTIGATION.
1. GENERAL REQUIREMENTS
The Bidder shall have its own fully equipped laboratory with adequate facilities,
equipment’s and qualified person to carry out all required testing (in accordance
with the relevant standard & project requirement) associated with the geo
technical investigation works.
This specification covers the technical requirements for carrying out detailed
geotechnical investigations and submission of a comprehensive Geotechnical
Investigation Report for the proposed substation.
The purpose of the investigation is to establish the subsurface conditions and to
determine the relevant engineering properties of soil and rock necessary for the
safe, reliable, and economical design of foundations and other civil works. The
investigation shall provide adequate and accurate geotechnical parameters,
including soil stratification, groundwater conditions, bearing capacity, settlement
characteristics, and other design parameters required for foundation engineering.
The findings and recommendations of the Geotechnical Investigation Report shall
form the basis for the design of all structures and facilities within the substation
premises, including but not limited to:
Control Room-cum-Administrative Building and associated buildings;
Residential quarters and colony infrastructure, wherever applicable;
Transformer foundations;
GIS building foundations;
Gantry and switchyard structure foundations;
Foundations for electrical equipment including circuit breakers, current
transformers, capacitor voltage transformers, lightning arresters, wave traps,
cable sealing ends and other equipment;
Foundations for vibratory equipment;
Cable trenches, oil sumps and underground utilities;
Peripheral drains, roadside drains and retaining structures;
Internal roads and pavements;
Boundary walls, fire walls and security structures; and
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Any other civil, structural, architectural, or infrastructure works associated
with the substation.
The above list is indicative and not exhaustive, and the Geotechnical
Investigation Report shall provide recommendations for all permanent structures
and facilities forming part of the scope of the project.
2. SCOPE OF INVESTIGATION
The scope of work shall comprise the complete geotechnical investigation for the
proposed substation site, including mobilization of all necessary equipment,
drilling rigs, testing apparatus, engineering and technical personnel, skilled and
unskilled manpower, and all associated resources required for the successful
execution of the investigation.
The investigation shall include field exploration, laboratory testing, engineering
analysis, interpretation of subsurface conditions, and preparation of a
comprehensive Geotechnical Investigation Report. The report shall provide
detailed recommendations for the design of foundations for various substation
structures, including assessment of allowable bearing capacity, foundation
depths, settlement characteristics, and other geotechnical parameters relevant
to structural design.
The scope shall cover evaluation of different foundation sizes and loading
conditions at varying founding strata for all proposed substation facilities and
associated structures. All investigations, testing procedures, analyses, and
reporting shall be carried out in accordance with the latest editions and
amendments of applicable Indian Standards (IS Codes) and other relevant
statutory requirements.
The investigation agency shall familiarize itself with the layout, type, loading
requirements, and functional characteristics of the proposed substation structures
through consultation with GETCO prior to commencement of the work.
The detailed scope of investigation shall include, but not be limited to, the
Drilling of boreholes to the specified depths and collection of disturbed and
undisturbed soil samples.
Conducting Standard Penetration Tests (SPT) at specified intervals and strata
Excavation of trial pits wherever required.
Plate Load Tests (PLT) at designated locations and depths.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Collection and chemical analysis of groundwater and soil samples to assess
corrosively and suitability for foundation construction.
Recording of groundwater table and subsurface stratification details.
Backfilling and proper restoration of boreholes and trial pits upon completion
of field investigations.
Performance of all necessary laboratory tests on soil, rock, and water samples
in accordance with relevant IS standards.
Analysis and interpretation of field and laboratory test results.
Evaluation of geotechnical design parameters including bearing capacity,
settlement characteristics, modulus values, soil classification, and foundation
recommendations.
Preparation and submission of detailed geotechnical reports containing
factual data, test results, bore logs, subsurface profiles, engineering analyses,
conclusions, and recommendations for the safe and economical design of
foundations for all substation structures.
The Geotechnical Investigation Report shall clearly specify the recommended
foundation system, allowable bearing pressure, founding level, expected
settlements, construction considerations, and any special measures required for
the proposed substation development.
The locations of all boreholes, trial pits, and Plate Load Tests (PLTs) shall be
finalized and approved by GETCO prior to commencement of the field
investigations. The investigation agency shall accurately capture the geographical
coordinates (Latitude and Longitude) of each borehole, trial pit, and test location
using suitable GPS equipment or equivalent surveying instruments. The recorded
coordinates shall be jointly verified and documented with the concerned GETCO
field representative, and the same shall form part of the Geotechnical
Investigation Report and associated field records.
3. APPLICABLE CODES AND STANDARDS
All field investigations, laboratory testing, analysis, interpretation of results,
reporting, and recommendations shall conform to the latest editions, revisions,
amendments, and supplements of the applicable Indian Standards (IS), Codes of
Practice, and other relevant statutory regulations in force at the time of
execution of the work.
The geotechnical investigation agency shall ensure that all procedures,
methodologies, workmanship, equipment, sampling techniques, testing practices,
and reporting formats comply with the requirements of the relevant standards
issued by the Bureau of Indian Standards (BIS). Where a particular aspect of the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
work is not covered by the Indian Standards, internationally accepted engineering
practices and standards may be adopted with the prior approval of GETCO.
The following standards are indicative and not exhaustive. The investigation
agency shall comply with all other relevant standards applicable to the scope of
work, whether specifically listed herein or not.
IS Code Description
IS 1498 Classification and Identification of Soils for General Engineering
IS 1888 Method of Load Test on Soils
IS 1892 Code of Practice for Subsurface Investigation for Foundations
IS 2131 Method for Standard Penetration Test (SPT) for Soils
IS 2132 Code of Practice for Thin-Walled Tube Sampling of Soils
IS 2720 (All Methods of Test for Soils
IS 2809 Glossary of Terms and Symbols Relating to Soil Engineering
IS 2810 Glossary of Terms and Symbols Relating to Soil Dynamics
IS 4078 Indexing and Storage of Drill Cores
IS 4464 Presentation of Drilling Information and Core Description in
Foundation Investigation
IS 4968 (All Method for Subsurface Sounding for Soils
IS 5249 Method of Test for Determination of In-situ Dynamic Properties of
IS 5529 Code of Practice for In-situ Permeability Tests
IS 9214 Method for Determination of Modulus of Subgrade Reaction (k-
Value) of Soils in the Field
IS 10060 Code of Practice for Subsurface Investigation for Power House
In addition to the above, all applicable standards related to borehole drilling, soil
and rock sampling, groundwater investigation, chemical analysis of soil and
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
water, plate load testing, geotechnical laboratory testing, and foundation
engineering shall be followed wherever relevant.
In the event of any discrepancy or conflict between the requirements of this
specification and the provisions of the referenced codes and standards, the
requirements of this specification shall prevail. However, where the code
requirements are more stringent than those specified herein, the more stringent
requirements shall be adopted unless otherwise approved by GETCO.
4. FIELD INVESTIGATION. - SOIL
Boreholes shall be drilled at locations approved by GETCO to establish the
subsurface profile, determine the engineering characteristics of soil and rock, and
obtain representative disturbed and undisturbed samples for laboratory testing
and foundation design.
Boreholes of 150 mm diameter shall be drilled in accordance with IS 1892 and
other applicable Indian Standards. The minimum depth of exploration shall
generally be 10 m below existing ground level or up to refusal, whichever occurs
earlier. Refusal shall be deemed to have occurred when a Standard Penetration
Test (SPT) value of 100 blows for 300 mm penetration is recorded.
4.1.2. Number of Boreholes.
Generally, the minimum number of boreholes shall be as follows:
For R&M & new Admin Office Building: 2 Nos.
For Transmission Tower: 1 No. per tower location.
33 kV & 66 kV Substation: 2 Nos.
132kV & 220kV Substation: 6 Nos. for AIS & 4 Nos. for GIS.
400kV & 765kV Substation: 10 Nos. for AIS & 8 Nos. for GIS.
However, the number and depth of boreholes may be increased or reduced,
subject to approval of GETCO, considering the plot area, importance of
structures, local geological conditions, variation in subsurface strata, and findings
obtained during the course of investigation, so as to establish a representative
subsurface profile and obtain adequate geotechnical parameters for design.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
4.1.3. Depth of Exploration
The investigation agency shall plan and execute the exploration programme
considering the nature of the proposed structures, local geology, past experience
in the area, and subsurface conditions encountered during drilling. The depth of
exploration may be modified during the investigation, with the approval of
GETCO, to ensure that sufficient information is obtained for safe and economical
foundation design.
Where low bearing capacity strata, highly compressible soils, expansive soils,
loose saturated deposits, liquefiable strata, or other adverse subsurface
conditions are encountered, the depth of exploration shall be extended as
necessary to establish the characteristics of the underlying competent strata and
to evaluate the suitability of shallow or deep foundations.
Where deeper compressible strata are encountered or where the primary
investigation indicates that pile foundations may be required, the boreholes shall
generally be extended up to 20 m below ground level or up to refusal, whichever
occurs earlier.
In areas comprising loose saturated sandy strata, reclaimed land, coastal
deposits, alluvial formations, or sites identified as potentially susceptible to
liquefaction based on geological conditions, seismic considerations, or preliminary
investigations, the depth of exploration shall generally be extended up to 30 m
below ground level or deeper, if required, based on engineering judgment and
approval of GETCO, to adequately assess liquefaction susceptibility and establish
the engineering properties of the underlying strata.
The final depth of exploration shall be governed by the subsurface conditions
encountered, geological setting, proposed foundation system, and foundation
design requirements, and may be further increased wherever considered
necessary by GETCO.
4.1.4. Rock Exploration
Where refusal is encountered during boring, the borehole shall be advanced by
chiselling or other suitable means to confirm the presence of rock. Upon
confirmation of rock strata, rotary core drilling shall be carried out and
representative rock cores shall be collected. Coring shall continue for a minimum
depth of 3 m into sound rock or until a core recovery of not less than 95% is
achieved, whichever requirement governs.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
4.1.5. Drilling Methodology
Boreholes may be advanced by auger boring, shell and auger boring, rotary
drilling, or any other suitable method appropriate to the prevailing ground
conditions and in accordance with the relevant Indian Standards.
Suitable casing shall be provided wherever necessary to prevent collapse of the
borehole and to minimize disturbance to the surrounding soil. Wash boring shall
not be adopted.
4.1.6. Backfilling and Restoration
Upon completion of drilling, testing, and sampling, all boreholes shall be properly
backfilled and the site restored to its original condition or as directed by GETCO.
4.2. BOREHOLE LOGGING AND REPORTING
Detailed borehole logs shall be prepared immediately upon completion of drilling
and submitted to the Engineer-in-Charge. The logs shall include soil and rock
descriptions, sampling details, SPT results, groundwater observations, core
recovery, RQD values, and any other relevant field observations.
All field records, borehole logs, test data, and observations shall be jointly
verified at site by the GETCO representative and shall form part of the final
Geotechnical Investigation Report.
In addition to the above requirements, the investigation agency shall comply with
the latest editions, revisions, and amendments of all relevant BIS Codes of
Practice applicable to geotechnical investigations
4.3. STANDARD PENETRATION TESTS AND SAMPLING
Standard Penetration Tests (SPT) shall be conducted in accordance with IS 2131 to
determine the subsurface stratification and engineering properties of soil. The
tests shall be carried out at intervals of approximately 1.5 m, at every change of
strata, at depths where undisturbed samples cannot be obtained, and at such
other depths as directed by GETCO.
The starting depth of SPT shall be staggered in alternate boreholes to obtain a
better representation of the subsurface profile. The tests shall commence from
0.5 m below ground level and continue up to the termination depth of the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Disturbed samples recovered from the split spoon sampler shall be collected,
visually classified, properly labelled, preserved, and transported to the laboratory
for identification and testing.
The SPT value (N-value) shall be reported in accordance with IS 2131. Refusal shall
be deemed to have occurred when 100 blows are required for 300 mm
penetration, and the corresponding penetration and blow count shall be recorded.
4.4. GROUND WATER
4.4.1. Observations
The groundwater table, if encountered, shall be measured and recorded in each
borehole in accordance with IS 6935 and other relevant Indian Standards.
Groundwater observations shall be made after stabilization of the water level and
the measured depth below ground level shall be reported.
Where the investigations are carried out during non-monsoon periods, the highest
seasonal groundwater level shall also be assessed from reliable local sources and
included in the Geotechnical Investigation Report.
The investigation agency shall record groundwater conditions and their likely
effect on foundation construction, dewatering requirements, and long-term
performance of structures.
4.4.2. Sub-soil Water Sampling
Representative groundwater samples shall be collected from boreholes
immediately upon first encounter of groundwater and prior to the addition of
water, drilling mud, or other contaminants. Where groundwater has been affected
by drilling operations or surface runoff, the borehole shall be dewatered and
allowed to stabilize before collecting the sample.
Samples shall be collected, preserved, labelled, and transported in clean airtight
containers in accordance with relevant IS Codes. Sufficient quantity of water
samples shall be obtained for chemical analysis.
The chemical analysis shall include, but not be limited to, determination of pH,
chlorides, sulphates, carbonates, bicarbonates, nitrates, organic matter,
suspended solids, and other constituents likely to affect the durability of
concrete, steel, and foundation performance.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Where required by the applicable test methods, suitable preservatives may be
added to the samples in accordance with relevant IS Codes.
Representative disturbed and undisturbed soil samples shall be collected from
boreholes and trial pits to establish the soil profile and to determine the physical,
engineering, and chemical properties of the soil. Sampling procedures and
equipment shall conform to the requirements of IS 1892, IS 2132 and other
relevant Indian Standards.
All samples shall be visually classified in accordance with IS 1498 and shall be
properly identified with borehole or trial pit number, sample number, depth of
collection, and date of sampling. Undisturbed samples shall be suitably sealed,
preserved, packed, and transported to the laboratory to prevent loss of moisture
and disturbance.
Where an undisturbed sample cannot be obtained at the specified depth, the
borehole shall be advanced and a Standard Penetration Test (SPT) shall be
conducted. The reasons for non-recovery of undisturbed samples shall be recorded
in the bore logs.
4.5.2. Disturbed Samples
Disturbed samples shall be collected at regular intervals and at every change of
strata for field identification and laboratory testing. Bulk samples, wherever
required, shall also be collected for evaluating the suitability of soil for use as fill
4.5.3. Undisturbed Samples
Undisturbed samples shall be collected at intervals of approximately 3 m and at
every significant change of strata, or as directed by GETCO. The starting depth of
undisturbed sampling shall be staggered in alternate boreholes to obtain a
representative assessment of the subsurface profile.
Undisturbed samples shall preferably be obtained using thin-walled tube
samplers. Where conventional sampling is not feasible, suitable sampling
techniques, including piston samplers or compressed air samplers, may be
adopted in accordance with the relevant Indian Standards.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
In soils where undisturbed sampling is impracticable, or where the SPT value
exceeds 50, Standard Penetration Tests may be substituted for undisturbed
sampling with the approval of GETCO.
4.6. TRIAL PITS
Trial pits shall be excavated at locations approved by GETCO to facilitate visual
examination of soil strata, collection of representative samples, and conduct of
in-situ tests. Unless otherwise specified, the trial pits shall be approximately 2 m
× 2 m in plan and shall extend up to a depth of 3 m below ground level or as
directed by GETCO.
The minimum number of trial pits shall be:
EHV Substation: 5 Nos.
66 kV Substation: 2 Nos.
Adequate safety measures, including shoring, dewatering, barricading, and other
protective arrangements, shall be provided wherever necessary in accordance
with IS 4453. Precautions shall be taken to prevent collapse of pit walls and
ingress of surface water.
Visual examination of the exposed strata shall be carried out and recorded,
including soil type, colour, consistency, thickness of strata, groundwater
conditions, and other relevant observations.
Undisturbed soil samples shall be collected at approximately 1 m intervals and at
the termination depth of the pit. Where undisturbed sampling is not feasible,
suitable in-situ tests, including field density tests, shall be carried out in
accordance with relevant Indian Standards.
Upon completion of sampling and testing, the trial pits shall be properly
backfilled using excavated material and restored to original condition as directed
4.7. PLATE LOAD TESTS (PLT)
Plate Load Tests (PLT) shall be conducted in accordance with IS 1888 to determine
the allowable bearing capacity, load-settlement characteristics, and modulus of
subgrade reaction of the soil. Determination of the modulus of subgrade reaction
(K-value) shall conform to IS
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
The number, location, and depth of Plate Load Tests shall be finalized by GETCO
based on the proposed foundation locations and subsurface conditions. Unless
otherwise specified, tests shall generally be conducted at the proposed
foundation level below finished ground level. Typical test locations may include:
GIS Building location (765/400/220/66 kV, as applicable)
Control Room-cum-Administrative Building location
Transformer foundation location (500 MVA/160 MVA, as applicable)
Store Building location
Security Cabin location
The size of the test pit shall not be less than five times the test plate dimension.
Excavation, visual examination, groundwater observations, and sampling shall be
carried out in the same manner as specified for trial pits. Representative
undisturbed soil samples shall be collected from suitable depths for laboratory
Unless otherwise approved by GETCO, the reaction method of loading shall be
adopted. The test equipment, loading procedure, observations, interpretation of
results, and reporting shall conform to the requirements of IS 1888 and IS
Loading shall be continued until the specified settlement or failure criteria
prescribed in the relevant standards are reached. Upon completion of testing, the
pits shall be properly backfilled and restored to their original condition using
excavated material or as directed by GETCO.
In case of gravelly, bouldery, or rocky strata, the testing methodology and
interpretation of results shall conform to the relevant applicable Indian Standards
and accepted engineering practice.
4.8. FIELD CALIFORNIA BEARING RATIO (CBR) TEST
Field California Bearing Ratio (CBR) tests shall be conducted, wherever required,
for the design of roads and pavements. The location and depth of testing shall be
as specified in the drawings or as directed by GETCO. The equipment, test
procedure, observations, and reporting of results shall conform to IS 2720 (Part
31) and other relevant Indian Standards.
4.9. ADDITIONAL INVESTIGATIONS
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
The scope and quantities specified herein represent the minimum requirements
for geotechnical investigation. Depending upon the site conditions encountered
during execution, GETCO may direct additional boreholes, trial pits, field tests,
laboratory tests, or increased depths of exploration. Such supplementary
investigations shall be carried out in accordance with the relevant Indian
Standards and accepted engineering practices. The decision of GETCO in this
regard shall be final and binding on the Investigation Agency.
5. FIELD INVESTIGATION. – ROCK
Field investigation in rock shall be carried out wherever rock strata are
encountered or anticipated, with the objective of establishing the depth, nature,
extent, and engineering characteristics of the rock mass for the design and
construction of foundations and other civil structures. The investigation shall
include rock core drilling, collection of representative rock samples,
determination of core recovery and Rock Quality Designation (RQD), groundwater
observations, field tests, laboratory testing, and preparation of detailed bore logs
All investigations shall be carried out in accordance with the applicable Indian
Standards, including their latest revisions and amendments, and in accordance
with accepted engineering practices.
5.2. ROCK CORE DRILLING
Where rock strata are encountered or anticipated, rock exploration shall be
carried out by rotary diamond core drilling in accordance with IS 6926 and other
relevant Indian Standards. The drilling shall be continued to establish the depth,
nature, and engineering characteristics of the rock mass.
Rock coring shall generally be carried out using double tube core barrels of BX or
NX size or equivalent, so as to obtain maximum core recovery and representative
samples. The depth of rock drilling shall normally extend to a minimum of 3 m
into sound rock or until a minimum core recovery of 95% is achieved, whichever
criterion governs the termination of drilling. The depth of drilling may be
increased, if required, based on subsurface conditions or as directed by GETCO.
During drilling operations, the investigation agency shall record the depth of rock
encountered, groundwater conditions, rate of core recovery, and any significant
variations in lithology, weathering, fractures, cavities, seams, or other geological
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
features. Any appreciable loss of drilling fluid or other unusual observations
encountered during drilling shall also be recorded.
All recovered cores shall be carefully preserved, properly labelled, and stored in
sequential order in core boxes for detailed examination, logging, photography,
and laboratory testing.
The drilling equipment, core barrels, drilling procedures, and methods of
preservation and handling of rock cores shall conform to the requirements of
relevant Indian Standards and accepted engineering practices.
5.3. ROCK CORE LOGGING AND CORE RECOVERY
All recovered rock cores shall be systematically examined and logged immediately
after drilling in accordance with IS 4464 and other relevant Indian Standards.
Borehole logs shall include details of rock type, colour, texture, degree of
weathering, jointing, fractures, cavities, seams, and other significant geological
features encountered during drilling.
Core recovery shall be determined for each core run and expressed as a
percentage of the drilled length. The investigation agency shall also determine
and record the Rock Quality Designation (RQD) and other relevant rock mass
characteristics for each borehole. Wherever required, Rock Mass Rating (RMR) or
other suitable rock mass classification systems may be adopted.
The location and depth of core losses, fractured zones, weak seams, and any
unusual geological conditions shall be clearly identified and recorded.
Representative photographs of rock cores shall be taken and included in the
Geotechnical Investigation Report.
All bore logs and core records shall be jointly verified at site by the GETCO
representative and shall form part of the final Geotechnical Investigation Report.
5.4. ROCK SAMPLING
Representative rock core samples obtained during drilling shall be preserved,
labelled, and stored systematically in suitable core boxes in the sequence of
recovery for identification, logging, photography, and laboratory testing.
The rock cores shall be examined to determine lithology, degree of weathering,
discontinuities, fractures, and other relevant geological features. Particular
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
attention shall be paid to zones of weak, fractured, weathered, or sheared rock,
and such features shall be clearly identified and recorded in the bore logs.
Representative samples from each significant rock stratum encountered shall be
selected for laboratory testing. Where required, additional samples shall be
collected from weak seams, fractured zones, or other critical locations to
establish the engineering properties of the rock mass.
All samples shall be properly protected during handling, transportation, and
storage to prevent damage and deterioration. The methods of sampling,
preservation, and handling shall conform to the requirements of relevant Indian
Standards and accepted engineering practices.
5.5. GROUNDWATER OBSERVATIONS
Groundwater conditions encountered during rock drilling shall be carefully
observed and recorded. The depth of groundwater table, seepage conditions,
water-bearing fractures, cavities, zones of water loss, and any other
hydrogeological features encountered during drilling shall be noted and
incorporated in the bore logs.
Any significant loss of drilling fluid, artesian conditions, or inflow of groundwater
indicating the presence of joints, fissures, solution channels, or permeable strata
shall be recorded. Where required, representative groundwater samples shall be
collected and analysed in accordance with the provisions specified under Clause
The observations shall form part of the Geotechnical Investigation Report and
shall be considered while recommending foundation type, dewatering
requirements, and other construction measures.
5.6. FIELD TESTS AND MEASUREMENTS
Where considered necessary based on subsurface conditions or as directed by
GETCO, suitable in-situ tests shall be carried out to evaluate the engineering
properties of the rock mass and to establish parameters required for foundation
Such investigations may include permeability tests, plate load tests on rock,
pressure meter tests, seismic refraction surveys, geophysical investigations, or
any other specialized tests considered necessary for assessing the strength,
deformability, and hydraulic characteristics of the rock mass.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
The selection of test locations, test procedures, interpretation of results, and
reporting shall conform to the relevant Indian Standards and accepted
engineering practices. The results of such tests shall form part of the
Geotechnical Investigation Report and shall be considered while recommending
the type and design parameters of foundations.
5.7. BOREHOLE LOGGING AND REPORTING
Detailed borehole logs and rock core records shall be prepared immediately upon
completion of drilling in accordance with IS 4464 and other relevant Indian
Standards. The records shall include, but not be limited to, depth of boreholes,
lithological description, degree of weathering, jointing, fractures, cavities,
groundwater conditions, core recovery, Rock Quality Designation (RQD), and other
significant geological features encountered during drilling.
Representative photographs of the rock cores shall be taken and included in the
Geotechnical Investigation Report. Results of field and laboratory tests, wherever
carried out, shall also be incorporated in the report.
All bore logs, core records, test data, and field observations shall be jointly
verified at site by the GETCO representative and shall form part of the final
Geotechnical Investigation Report.
In addition to the above requirements, the investigation agency shall comply with
the latest editions, revisions, and amendments of all applicable BIS Codes and
accepted engineering practices relating to rock investigations.
5.8. ADDITIONAL INVESTIGATIONS
The scope and quantities specified herein represent the minimum requirements
for rock investigations. Depending upon the geological conditions encountered
during execution, GETCO may direct additional boreholes, increased depths of
exploration, supplementary field tests, laboratory tests, geophysical
investigations, or any other specialized studies considered necessary for
establishing the engineering characteristics of the rock mass.
Such supplementary investigations shall be carried out in accordance with the
relevant Indian Standards and accepted engineering practices. The decision of
GETCO regarding the extent and nature of additional investigations shall be final
and binding on the Investigation Agency.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
6. LABORATORY TESTING
Laboratory testing shall be carried out progressively during the field investigation
programme to facilitate interpretation of subsurface conditions and optimization
of subsequent exploration activities. The extent and frequency of testing shall be
sufficient to establish the engineering characteristics of the subsurface strata and
to develop reliable design parameters for foundations and other civil structures.
All laboratory tests shall be performed by qualified technical personnel in
accordance with the latest editions and amendments of the applicable Indian
The laboratory testing programme shall include, but not be limited to, the
6.1. SOIL TESTS
Visual and engineering classification of soils.
Natural moisture content.
Bulk density and dry density.
Specific gravity.
Grain size distribution.
Atterberg limits (Liquid Limit, Plastic Limit and Plasticity Index).
Shrinkage Limit.
Free Swell Index.
Swell Pressure.
California Bearing Ratio (CBR), wherever applicable.
Relative density of cohesion less soils, wherever required.
Permeability tests, wherever required.
Shear strength tests.
Consolidation tests and compressibility characteristics.
Triaxial compression tests (UU, CU or CD), as applicable.
Any other tests required for evaluating settlement, strength and deformation
characteristics of soil.
6.2. CHEMICAL TESTS
Chemical analysis of representative soil and groundwater samples shall be carried
out to determine:
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Carbonates and bicarbonates.
Organic matter and organic content.
Dissolved salts and suspended solids.
Any other deleterious constituents likely to affect concrete, steel, or long-term
foundation performance.
6.3. ROCK TESTS (Where Applicable)
Representative rock samples shall be tested, wherever rock strata are
encountered, for determination of:
Rock Quality Designation (RQD).
Rock Mass Rating (RMR).
Unconfined Compressive Strength (UCS/UCC).
Point Load Index.
Specific Gravity.
Water Absorption.
Porosity, wherever required.
Slake Durability Index, wherever required.
Any other tests necessary for characterization of rock mass and foundation design.
The type, number, and frequency of laboratory tests may be modified or
supplemented based on subsurface conditions encountered during investigation
and as directed by GETCO.
7. TEST RESULTS AND REPORTING
The Investigation Agency shall submit detailed Geotechnical Investigation Reports
in duplicate, duly signed by the authorized representative of the Investigation
Agency and jointly verified by the GETCO site representative. The report shall
present the results of field and laboratory investigations, interpretation of
subsurface conditions, engineering analyses, and recommendations for foundation
The report shall include, but not be limited to, the following:
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
7.1. GENERAL INFORMATION
Site description and geological setting.
Scope and details of the investigation programme.
Dates of field and laboratory investigations.
Applicable codes and standards.
7.2. LAYOUT AND EXPLORATION DETAILS
Layout plan showing the locations of boreholes, trial pits, plate load
tests, electrical resistivity tests, and other investigations with Latitude
and Longitude coordinates.
Depth and identification details of each borehole and trial pit.
7.3. BOREHOLE LOGS AND SUBSURFACE PROFILES
Detailed borehole logs and trial pit records.
Soil and rock stratification profiles.
Groundwater observations and seasonal groundwater levels.
Rock core logs, core recovery, RQD values, and other geological
7.4. FIELD AND LABORATORY TEST RESULTS
Results of all field investigations and in-situ tests.
Results of laboratory tests on soil, rock, and groundwater samples.
Test data presented both stratum-wise and in consolidated tabular form.
Relevant charts, graphs, photographs, and soil and rock profiles.
Core photographs and rock core logs.
7.5. ENGINEERING ANALYSES
Determination of engineering properties and design parameters.
Bearing capacity calculations as per attached ‘ANNEXURE-A’
Settlement analysis.
Pile capacity calculations, wherever applicable as per attached
Evaluation of liquefaction susceptibility, wherever required.
Interpretation of field and laboratory test results.
Sample tabular formats for allowable bearing capacity and pile capacity may
be furnished as Annexures for guidance. Additional tables, charts, and
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
calculation sheets necessary for interpretation of results shall also be
7.6. SUPPORTING DOCUMENTS
The report shall include all relevant field records, bore logs, laboratory test
certificates, calculations, charts, diagrams, photographs, and other supporting
documents necessary for proper interpretation of the investigation results.
All test results and records shall bear the signatures of the Investigation Agency
and the GETCO site representative and shall form part of the final Geotechnical
Investigation Report.
8. RECOMMENDATIONS
The Geotechnical Investigation Report shall provide clear, project-specific
recommendations for the design and construction of all proposed structures. The
recommendations shall be supported by field observations, laboratory test
results, engineering analyses, and accepted geotechnical practices.
The recommendations shall include, but not be limited to, the following:
8.1. Site Assessment
Geological and geotechnical characteristics of the site.
Groundwater conditions and seasonal fluctuations.
Historical information and experience from nearby structures, where
Identification of any problematic strata or adverse geological features.
8.2. Foundation Recommendations
Recommendations regarding the type of foundation, founding depth, and design
parameters for all proposed structures, including but not limited to:
GIS Building.
Control Room-cum-Administrative Building.
Transformer Foundations.
Switchyard structures and equipment foundations.
Store Buildings and Security Cabins.
Boundary walls and retaining structures.
Oil sump, fire wall, DG foundation, pipe supports.
Roads, drains, cable trenches, street light foundations, plinth protection,
paver blocks, and other ancillary structures.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Where pile foundations are recommended, the report shall include:
Type of pile.
Diameter and length.
Safe load capacity and pile group efficiency as per Annexure-B.
Liner requirements, depth of fixity, and scour considerations.
Comparison of alternative pile systems, wherever applicable.
8.3. Bearing Capacity and Settlement
Allowable bearing pressures at various depths and foundation sizes as per
Annexure-A, supported by calculations.
Net Safe Bearing Capacity based on a minimum factor of safety of 2.5.
Estimated total and differential settlements and permissible settlement
Coefficient of subgrade reaction (K-value).
Earth pressure coefficients for retaining and underground structures.
8.4. Soil Behaviour and Ground Improvement
Swelling and shrinkage characteristics of soil.
Liquefaction susceptibility assessment in accordance with the latest
provisions of IS 1893 and other relevant standards.
Recommendations for ground improvement and soil stabilization measures,
wherever required.
Recommendations for treatment or replacement of expansive soils, if
8.5. Construction Considerations
Anticipated difficulties during excavation and foundation construction.
Stability of excavations and recommended side slopes.
Dewatering requirements and groundwater control measures.
Temporary works and other precautions necessary during construction
8.6. Durability Considerations
Based on the chemical characteristics of soil and groundwater, recommendations
shall be provided regarding:
Grade of concrete.
Type of cement.
Protective coatings and corrosion protection measures.
Sulphate resistant measures, wherever required
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Any special requirements necessary to ensure durability of concrete and
8.7. Rock Foundation Recommendations
Where foundations are to be placed on rock strata, the report shall include
recommendations regarding:
Founding criteria and design parameters of the rock mass.
Rock Quality Designation (RQD) and Rock Mass Rating (RMR), where
Rock anchoring, rock bolting, and grouting requirements.
Grouting material and anchorage details, wherever applicable.
Measures for treatment of weak, fractured, or weathered rock zones.
8.8. Additional Investigations
Recommendations regarding any supplementary investigations considered
necessary for final foundation design or for resolving uncertainties encountered
during the course of investigation.
8.9. Seismic Considerations
Recommendations shall be provided regarding the seismic suitability of the
founding strata in accordance with the latest provisions of IS 1893 and other
applicable standards. Special measures, if any, required for mitigation of
liquefaction, differential settlement, or instability under seismic loading shall be
clearly indicated.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
SUMMARY OF ALLOWABLE BEARING PRESSURE BASED ON SHEAR AND SETTELEMENT
Depth Length Width Safe bearing capacities Safe bearing pressure Allowable Allowable
of of fdn. of calculated based on shear calculated based on bearing bearing
fdn. fdn. criteria (Clearly Specify) settlement criteria pressure pressure
General Local Intermediate For 25mm For 40mm For 25mm For 40mm
Shear shear shear settlement settlement settlement settlement
Meter Meter Meter T/Sq.MT T/Sq.MT T/Sq.MT T/Sq.MT T/Sq.MT
SIZE OF FOUNDATION
DESIGNER AS PER SITE
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Table -1-For Bored cast in situ pile
Type Diame Pile Cut- Effective Length of pile Pile Capacity(T) Depth of
of pile ter off Level pile Length from E.G.L. fixity(Fixed
BH. below E.G.L. & Free)
Vertical Uplift (Fixed
Meter Meter Meter Meter T T T Meter
Bored 1 0.30 Starting from
cast to 0.40 1.0 mtr, i.e.
in situ 2/6 0.45 1.0 mtr,
pile /10 0.50 2.0 mtr,
Table -2- For Under reamed pile (with single bulb)
Type Diame Pile Cut- Effective Length of pile Pile Capacity(T) Depth of
of pile ter off Level pile Length from E.G.L. fixity(Fixed
BH. below E.G.L. & Free)
Vertical Uplift (Fixed
Meter Meter Meter Meter T T T Meter
1 0.30 Starting from
Under to 0.40 1.0 mtr, i.e.
ream 2/6 0.45 1.0 mtr,
pile 0.60 3.0 mtr
(with 0.75 ...... upto
single borehole
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Table -3- For Under reamed pile (with double bulb)
Type Diame Pile Cut- Effective Length of pile Pile Capacity(T) Depth of
of pile ter off Level pile Length from E.G.L. fixity(Fixed
BH. below E.G.L. & Free)
Vertical Uplift (Fixed
Meter Meter Meter Meter T T T Meter
1 0.30 Starting from
to 0.40 1.0 mtr, i.e.
Frequency of Collecting UDS & Performing SPT (Limited upto Overburden)
The frequency shows is indicative, actual sampling shall depend on soil type & feasibility.
Depth Below 1.00 2.00 3.00 4.00 5.00 6.00 Every meter up to
BH-1 UDS-a SPT UDS-b SPT UDS-b SPT
BH-2 SPT UDS-b SPT UDS-b SPT UDS-a
BH-3 UDS-a SPT UDS-b SPT UDS-b SPT
BH-4 SPT UDS-b SPT UDS-b SPT UDS-a
Lab test requirement for Overburden/Soil Strata:
Sample Lab test to be Conducted
SPT SA:%Gravel, % Coarse Sand,% Medium Sand,
% Fine sand and %(Silt+ clay)
Liquid Limit, Plastic Limit, Field water content
UDS-a Field Bulk unit weight, Field water content
SA:%Gravel, % Coarse Sand,% Medium Sand,
% Fine sand and %(Silt+ clay)
Liquid Limit, Plastic Limit, Shear Parameter:C
UDS-b Field Bulk unit weight, Field water content
SA & Hydrometer: %Gravel, % Coarse Sand,%
Medium Sand, % Fine sand and
Liquid Limit, Plastic Limit, shrinkage limit,
Shear Parameter:C & Phi
Consolidation test:Cc, Pc, Cr, Cv, Mv(Range
Unconfined Com Strength(UCS) in CL, ML, CI,
MT, CH, MH Soil type
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
SA=Sieve Analysis,
Test to be conducted for Shear Parameters on Saturated sample:(Provide stress-strain curve)
For Soil type- CL, CI, CH, MI, MH:TUU
For Soil type- SW, SP, SM, SC, ML:DST
All Field & Lab. Tests shall be as per IS Code practice-Publication SP-36 pt-1 and SP-36 pt-2.
(E1) General Conditions:
1. The contractors shall at their own expense make all necessary provisions for housing, water supply,
and sanitary arrangements for their employees as well as for works and shall pay direct to the
authorities concerned, all rates and taxes.
2. The contractor shall make their own arrangements for the necessary approach, road, for transport of
their materials and be responsible for the compensation on account of damage to crop etc. & shall till
completion of work.
3. All the royalty charges, Octroi and other duties & all taxes will be paid by the contractor and no extra be
claimed on this account.
4. Godowns or sheds hired or constructed for storing of controlled materials and more particularly of
cement shall be such as would prevent the materials from getting damaged in any way.
5. It will be absolutely incumbent on the contractors to have on the site of work only such of the materials
as have been duly passed by the Engineer-in-charge. Materials that have been rejected must on no
account be allowed to remain on the site, and in spite written order to do so, any such rejected
material is on the site beyond a period of 48 hours’ notice, the Engineer-in-charge shall have the right
to remove it, at the risk and cost of the contractors and even to destroy it.
6. It must be distinctly understood that conditions of contract and of claims in respect of extra work, will not
be allowed unless the works to which they relate is clearly without the spirit and meaning of the
specifications or unless such works are ordered in writing by the Engineer-in-charge and claimed for
in specified manner.
7. On completion of the work, the site shall be cleared by the contractor within the stipulated period, and
ground brought to original state and they shall not be entitled for any extra claim on this account.
8. General Specifications of the relevant Indian standard specification shall also apply.
9. Damage to work clause:
The works whether fully constructed or not and all materials, machinery plant tools, temporary buildings
and other things connected there shall be at the risk and in the sole charge of the contractor, until the
works have been delivered, completed to the satisfaction of the Engineer-in – charge and certificate
from him to the effect is obtained. Until such delivery, the contractor shall at their own cost, take all
the precautions reasonably necessary, to keep all the aforesaid works, materials, machinery, plant
tools. Temporary buildings and other things connected with the works, free from any loss or damage
and in the event of the same or any part thereof being lost or damaged, shall forthwith within the
possible speed, reinstate and made good such loss or damage at contractor’s own cost.
10. Any components or part of the work shall not be given to any sub-contractor without approval of the
competent authority of the Corporation. The whole responsibility of the execution of the work, as per
the terms and conditions of the contract, will entirely rest of the main contractor. The main contractor
shall always keep his responsible representative, preferably a technical hand, on work site with
powers to sign M.R.s. and take necessary decision and implement the instructions issued in the
interest of efficient execution of the works.
11. The Engineer-in-charge will fix the hours of work, and no work shall be executed beyond that period,
during night time or in absence of the Engineer-in-charge of his authorized agent. The box measures
shall be filled only in the presence of the engineer-in-charge or his authorized agent.
12. Contractor will be asked to present the sample of materials, and the approved samples will be
preserved at the site of work, and no charge in the approved sample will be allowed, without the
written permission of the Engineer-in-charge.
13. In any work is not executed according to the specifications, and the directions of the Engineer-in -
charge, the same will be rejected, and the contractor has re execute the same without any financial
implication to the Corporation.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
14. Contractor will have to communicate the name of his authorized agent, who shall be present on the
works, and shall be authorized to sign the material requisitions, receive instruction given verbally or
on the order book, on behalf of the contractor.
15. The contractor will have to sign the conditions of contract, and execute the agreements, send the list
of previous works executed, solvency certificate and pay up the security deposits, falling to that, the
tender will be rejected and earnest money deposited will be forfeited. The value of the stamp paper
and stamp duty charges shall be borne by the contractor.
16. Tenderer must return the form of tender, with the specifications and the schedule of quantities, and
rates and other schedules only signed on each page. Any tender not bearing signature of the tenderer
on all the documents accompanying the tender is liable to be rejected.
17. Before submitting his tender, unit rates, which shall be for the finished work complete, including
charges involved in testing, maintenance for a period of 12 months, the tenderer shall closely
examine the specifications and carefully study the drawings and all documents, which form a part of
the contract, to be entered into by the accepted tenderer.
18. The Tenderer must visit the site of works and see for himself the site conditions regarding water,
labour conditions rates approach road during all seasons and all other matters affecting the works
before submitting the tender.
19. The submission of tender by a contractor implies that, he has read these instructions, the conditions of
contract etc. and has made himself aware of the scope and specifications of the work to be done, and
of conditions and rates at which stores will be issued to him, and local conditions and other factors
bearing on the executions of the work. The Corporation will not therefore, after acceptance
contractor’s rate, pay any extra charge for lead or for any other reason. In case the contractor is found
later on, to have misjudged the site conditions.
20. The tender document shall be written legibly and free from erasure, over writing or conversions of
figures. Correction where unavoidable, shall be made by crossing out, initialing, dating and rewriting.
21. The Corporation or its officers, who accept tender, shall have the right of rejecting all or any of the
tenders, and will not be found to accept the lowest offer not to assign any reasons whatever, for the
rejection of any tender or all tenders.
22. The tender notice to tenderers shall from a part of the contract.
23. The entire work is to be completed, within the stipulated time limit from the date of issue of letter for
commencement of the work by field office. The contractor will not be eligible for any extra for the idle
period of works, or waiting period that may be required to suit other consideration, and no claims for
compensations on account of such, will be considered. However in case of delay due to
circumstances beyond the control of contractors, either in date of commencement or due to, waiting
during construction, extension in time may be considered for completion of works, without any penalty
to the Corporation.
24. The contractor shall keep full time qualified Civil Engineers at the site, who shall be fully authorized to
receive and comply with such instructions, as given by the Executive engineer. The name of such
Engineer with his qualifications and experience shall be intimated by the contractor.
The Executive Engineer shall have the right to demand the removal of any technical personnel, skilled or
unskilled workmen, who in his opinion are considered to cause bad workmanship in the execution of
works or to cause indiscipline.
25. The department reserves the right to make any change in the design and the plans of the works and
the contractor shall be bound to carry out them at the rates tendered. No claim or compensation will
be allowed on this account.
26. Bills shall be submitted by the contractor monthly on or before the date fixed by the Executive
Engineer, for all works executed in the previous months.
27. Should this tender be accepted I /We hereby agree to abide by and fulfill all the terms and provisions
of the “Tender & contract for works” as applicable, and in default thereof to forfeit and pay to the
Corporation the sums of money due.
28. The contractor shall keep instruction book on site, for taking site instruction from time to time. This
book shall be made available on site whenever asked for.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
29. The contractor shall pay wage to the workers, as per minimum wages act as declared by the
Government time to time.
30. The contractor shall follow all labour laws of Govt.
31. Contractor shall arrange for testing of material to be used in the work or finished product, if desired by
the Executive Engineer. The provision shall be made in the unit rate quoted for this.
32. The full value of the “Earnest Money Deposit” paid herewith, shall be forfeited to the Corporation, if the
contractor fails to deposit the full amount of specified security deposit, within stipulated time.
(E2) Use of Materials:
I. The contractor shall have to use the best quality of materials in the work, as per the specifications and
relevant I.S. codes. In case Corporation desires to carry out any field test/laboratory test for any
materials required for the work, the contractor shall arrange for the same at his own cost.
Further, for any finished works such as masonry, plastering, cube testing for all important concreting work
etc., if any testing is required same shall be arranged by the contractor at his own cost. The contractor
shall have to maintain the regular records for such testing and shall submit along with each R.A. bills.
II. No collection of materials shall be made before it is go t approved from the Engineer-in-charge.
III. Materials, if and when rejected by the Engineer-in-charge shall be immediately removed from site of
IV. All installations pertaining to water supply and fixtures thereof as well as drainage lines and sanitary
fittings shall be deemed to be completed only after giving satisfactory tests by the contractor.
V. Approval to the samples of various materials given by the EIC shall not absolve the contractor from the
responsibility of replacing defective material brought on site or materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or compensation
whatsoever on account of any such material being rejected by E.I.C.
VI. Approval to any of the executed item for the work does not in any way relieve the contractor of his
responsibility for the correctness, soundness and strength of the structure as per the drawing and
VII. “Contractor has to bring the Cement, Reinforcement steel, Structural steel from approved
brand list published on GETCO’s website only”.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs. 300.00)
Know All Men by These Presents that we, , by
this SAFETY CUM INDEMNITY BOND Executed on this _ Day of Month
I/We Having Registered Office , (herein
after called “THE CONTRACTOR” which expression shall mean and includes my /our heirs,
executors, administrators and legal representatives, successors and permitted assigns) do
hereby binds myself/ourselves and also our company/firms after having the power to bind by this
promise and undertaking in favor of the Gujarat Energy Transmission Corporation Limited
(GETCO), Palanpur a State Transmission Utility under The Electricity Act, 2003 having its
registered office at Sardar Patel Vidyut Bhavan, Race course, Mehsana.( hereinafter called
as GETCO, which expression shall mean and include its legal representative, administrators
assigns) has agreed under the terms and conditions of the contract no. .
,and S.E., GETCO, Palanpur for the contract of the value of Rs. _ interalia on
production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to
time to the extent of Rs. (Rupees: - Rupees
and Paisa only) only against any losses or damages, costs, charges and expenses caused to or
suffered by reason of the CONTRACTOR while Project, R&M, O&M work including work
carried out by outsourcing agency, failing to take proper care or not complying the
guidelines given hereunder as per Annexure-A and instructions which may be given from
time to time during the continuance of the contract and we further undertake to
unconditionally pay the amount claimed by the GETCO on demand and without demur to
the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under
order no ________
for issued by the GETCO after having observing necessary formalities, the details of which
is described in the order :- .
, and whereas the said job/works will be /likely to be done in places covered under Employees’
State Insurance Act,1948 (ESI) and /or the Workmen Compensation Act,1923 and /or other
laws relating to the Labour Management and Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract t h e CONTRACTOR is under
obligation to e xecut e thi s Safety cum I nde mnity Bond b e fo re the commencement of
actual execution of work
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to
follow the guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to
whether there has been any breach of the guidelines as per Annexure-A of this bond and as to
the extent of the loss, damages, costs, charges and expenses caused to or suffered by the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
We the CONTRACTOR further agree that our liability under this bond shall not be
discharged because of the change in the constitution of the GETCO or for the extension of
the time limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO
from a l l claims, actions, proceedings and risk, damage danger to any person whether
belonging or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation,
damages any proceedings in respect of any of its employee / workmen under the Workmen
Compensation Act or any other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order
mentioned hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has
not complied with guidelines as per Annexure-A or terms and conditions / formalities within
the meaning of Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act
1923 or any other laws relating to the Labour Welfare for the time being in force, and also
has not observed the safety norms in accordance with the law prevailing at the place of
work/job to the satisfaction of the GETCO, the GETCO shall have the right to stop the
execution of work/job and the period of such stoppage shall not be taken into account for the
calculation of the total period of completion of work for which the CONTRACTOR is
responsible to complete the work/job and it will be deemed that discontinuance was due
to default of the CONTRACTOR
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to
p a y any such compensation mentioned hereinabove, whether on failure of the
CONTRACTOR or for any other reason, the GETCO shall have the right to recover the
said amount from any amount receivable by GETCO or any bank guarantee deposited or
anything payable whether in connection with this contract or other contract by the
CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated
violation of any guidelines as per Annexure-A and terms and conditions mentioned in this
Safety cum Indemnity Bond, GETCO shall have right to terminate the contract of work
issued to the CONTRACTOR.
e. In case if any safety related fatal Electrical / Mechanical accident occurred to any
employee of agency or outsider due to negligence or non-compliance of GETCO safety
norms then in addition to the compensation and liability as per statutory requirement,
contractor / agency is hereby agreed to pay the penalty amount as given below:
Sr. Amount of Contract in Rs.
1 Up to 1 Lac Rs.5,000/-
2 Above1 Lac to 10 Lacs Rs.40,000/-
4 100 Lacs 1.0 % of contract value
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement
of claims under this Safety Cum Indemnity bond the courts in Gujarat State wherever
job/work is performed or as per GETCO norms shall have the jurisdiction to decide the
rights & liabilities of the parties while adjudicating the matter of claims under this Safety Cum
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the
GETCO in Writing on the Contractor’s application after the Contractor has discharged all his
obligations under the order mentioned hereinabove and submitted a “NO DEMAND
CERTIFICATE” from the GETCO under the said order. The Safety cum Indemnity Bond shall
be valid for a CONTRACT PERIOD and renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in
addition to and not by way of limitation or substitution for any other guarantee, indemnities
Hereto before given to the GETCO by the CONTRACTOR and this indemnity does not Revoke
or limit such indemnities or guarantees. IN WITNESS WHEREOF the Parties hereto have
executed this indenture the day the year First hereinabove written.
j. GST as applicable on Penalty amount shall be borne by the contractor and the contractor
agrees to pay/ reimburse the same. (TO BE INCORPORATEDIN SAFETY CUMINDEMNITY
(Signature with seal of the CONTRACTOR)
In the presence of:
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at Palanpur the_____________ day of ___________ in the
Christian Year Two thousand fourteen between M/s. ___________________________
(address of office) ________________ (hereinafter referred to as “THE CONTRACTOR” which
expression shall unless excluded by or repugnant to the contract include its successors or
permitted assigns) of the ONE PART and the Gujarat Energy Transmission Corporation Ltd,
having their Head office at Vidyut Bhavan, Race Course, Baroda 390 007 (hereinafter called
“The GETCO” which expression shall unless excluded by or repugnant to the context include its
successors or assigns) of the other part.
WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors
________________________as per GETCO’s Order No.
_________________________________________________ hereinafter called “the works” and
more particularly described and enumerated or referred to in the specification, terms and
conditions prescribed in the order letter, covering letter and other letters and schedule of price
which for the purpose of identification have been signed by Shri
____________________________________ on behalf of the contractors and by -------------------
--------------- on behalf of the GETCO, a list whereof is made out in the Schedule hereunder
written and all of which said documents are deemed to form part of this contract and included in
the expression “The works” wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned. AND WHEREAS THE GETCO has accepted the tender of contractors for
the construction of the said works for the sum of Rs. ________________________ Rupees
subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND
1. The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein or there from respectively or are reasonably necessary for
the completion of the works as mentioned and at the times, in the manner and subject to the
terms and conditions and stipulations contained in this contract, and in consideration of the due
provision, executions, supply and completion of the works agreed to by the contractor as
aforesaid the Board doth hereby covenant with the contractor to pay all the sums of moneys as
and when they become due and payable to the contractors under the provisions of the contract.
Such payment to be made at such times and in such manner as is provided by the contract.
2. The conditions and covenants stipulated here-in-before in this contract are subject to and
without prejudice to the rights of the Board to enforce penalty for delays and / or any other rights
whatsoever including the right to reject and cancel on default or breach by the contractor of the
conditions and the covenants as stipulated in the general conditions, specifications, forms or
tender schedule etc. attached with GETCO’s Order No.
The contract value, extent of supply & erection works, delivery dates, specifications and other
relevant matters may be altered by mutual agreement and if so altered shall not be deemed or
construed to mean or apply to affect or alter other terms and conditions of the contract and the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
general conditions and the contract so altered or revised shall be and shall always be deemed to
have been subject to and without prejudice to said stipulation.
List of documents forming part of the contract:
1. GETCO’s Tender Specification No. _____ and contractor’s offer opened on dated
2. GETCO order No. Dtd. _____ / ______/
3. Contractor’s acceptance of order vide letter no. _______________.
4. Contractor’s Partnership Deed Dtd. ________________.
5. Contractor’s Power of Attorney / Board Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties here to have set their hands and seals this day and month, year
first above written.
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of
M/s. ___________________ (Signature)
In the presence of (Full Name, Address and Signatures)
ii) ____________________ (Signature)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and on behalf of Gujarat Energy Transmission Corporation Ltd., Palanpur.
In the presence of name, Full address and Signature:
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Declaration of Conflict On Interest
Superintending Engineer,
Gujarat Energy Transmission Corporation Limited,
Circle Office, Nr. Circuit House,
Palanpur-385001
Ref: Tender Notice No…………………………………
With reference to above your tender Notice
We do not have any conflict of interest with any other bidder who has submitted the bid in this
Yours Faithfully,
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Declaration of Relationship with employee
Superintending Engineer,
Gujarat Energy Transmission Corporation Limited,
Circle Office, Nr. Circuit House,
Palanpur-385001
Ref: Tender Notice No…………………………………
With reference to above your tender Notice No……………………………………………………...…..
We do not have any type of relationship with any current employees of GETCO.
Yours Faithfully,
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business
Practices and is fostered in an atmosphere of trust and respect between providers of
goods and services and their users for the ultimate benefit of society as the nation,
safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the
accident, while execution of works in indoor and outdoor systems of GETCO, the
following guideline and preventive measures are identified.
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and Man power The method of work required T&P and Man power
should be discussed between GETCO supervisor, should be discussed between GETCO supervisor,
contractor’s supervisor and gang leaders. contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey Must be Prior to execution of work a joint survey
conducted by GETCO supervisor and contractor’s Must be conducted by GETCO supervisor,
supervisor for risk assessment. contractor’s supervisor and DISCOM lineman in
• Clearly identify the work location, to order to identify the following:
distinguish between the equipment that is a. HT/LT line or tap line crossing under
dead and other equipment/part that may be Each span of line of the work.
live. b. Isolation point of each line crossing.
• Disconnect equipment from supply. c. Each line crossing & isolation point under each
• Protect against other live parts. span must be discussed and noted in
maintenance register with sketch.
• Take special precautions when close to bare
conductors/ Bus bar.
Following safety guidelines are mandatory Contractor’s supervisor and GETCO
For all contractors operating in GETCO premises Supervisor must ensure all isolations physically with
for Electrical, non-electrical & civil works. adequate earthing technically prior to give clearance
1. The contractors must provide advance planning to gang leader for taking up job.
of work to concerned in-charge of substation in
writing. While execution of stringing work, the identified line
2. Before starting any work whether switchyard, crossing must be isolated /de-energized and written
“permit to allow to work” must be taken from clearance should be obtained from concerned
control room in-charge. DISCOM supervisor.
3. Utilizing Electrical / non-electrical equipment’s,
safety rules must be implemented.
The isolation of Tap line must be physically seen
4. If the work is to be carried out on Sunday or
and verified by Contractor and GETCO supervisor.
public holiday, the necessary permission must be
taken in advance, requesting in writing.
At D.O. fuse junction contractor’s person should be
5. Unwanted person including children of labours
posted to ensure that no person restore D.O. supply
will not be allowed at working site/ in the
while work is under execution
switchyard and in the prohibited area.
6. Any electrical work or electrical connections to
equipment for any other work must be carried out Contractor’s supervisor must ensure that concern
by certified officer take LCP for EHV line and power line
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
electrician/wiremen with adequate size of
wire through MCB as per I.E. Rule.
- Live penal area / bus bar must be isolated
and sealed / bifurcated with red colour tape
for visible warning.
- Display Board must hang on LCP panel.
- Transformer must be switched off
whenever and wherever contractor and line
workers are not satisfied with isolation, earthing or
any equipment performance of GETCO, it will be
pointed out and work shall begin only after
resolution. Contractor shall not take up job in
absence of GETCO authorized person. All wire
temporary connection & material whenever
erection activity has any connection and
disconnection work of bus bar, string bus.
All workers / labour of contractor & supervisors All workers / labour of contractor & supervisors must
must use personal protective equipment (PPE) use personal protective equipment (PPE) during the
during the work like gloves, safety belt, Safety work like gloves, safety belt, Safety shoes, Helmet,
shoes, Helmet, earthing rods, etc, duly approved earthing rods, Live line detector etc, duly approved
by GETCO. by GETCO.
The local earthing must be done at the place of The local earthing must be done at the place of
work before execution of any work. work before execution of any work.
11kVbreakerinpanel must be switched off and Circuit breaker opening is not an isolation and
racked out only after ensuring no voltage in isolator on either side must be opened. No work
breaker and without door opening. during rains and cloudy weather condition.
Transmission line activities.
1) Used of Voltage detector to ensure
2) 2) Earthing at three point, local, left & right side
3) bus bar / string bus.
3) Match line colour
Local earthing code with
of electrical colour of wristband.
equipment’s like filter
M/c, welding machine, testing kits etc. is must.
Crane shall only be used for material handling and
erection. Working platform shall only be used for
work in switchyard.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
ON RECENT STAMP PAPER OF RS. 300/-
The Superintending Engineer BG. No. :
Gujarat Energy Transmission Corpn. Ltd, Issuing Date :
66KV S/S Compound, Expiry Date :
Highway Char Rasta Amount :
Palanpur-385001
FORM OF BANKER’S UNDERTAKING
[Combined Performance Guarantee (PBG) towards Execution Period and Guarantee /
Warranty Period as per Commercial Terms and Condition of Tender]
We, _______________________________________ (Name of the Bank and Address of the
Branch giving the Bank Guarantee) having our registered office at _________ (Address of Bank’s
Registered office) hereby give this Bank Guarantee Number __________ dated ________ and hereby
agree unequivocally and unconditionally to pay immediately on demand in writing from the Gujarat
Energy Transmission Corporation Limited, or any Officer authorized by it in this behalf any amount up
to and not exceeding Rs._____________ (Amount of combined Performance Guarantees towards
Execution / Supply Period and Guarantee / Warranty Period) (Rupees _______ (in words) to the said
Gujarat Energy Transmission Corporation Limited, on behalf of
M/s________________________________ who have entered into a contract for the supply/works
specified below :
This agreement shall be valid and binding on this Bank upto and inclusive of ____________ (Date of
validity of the Bank Guarantee) and shall not be terminable by notice or by change in the constitution of
the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability
hereunder shall not be impaired or discharged by any extension of time or variation or alteration made,
given conceded or agreed, with or without our knowledge or consent, by or between parties to the said
within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the Gujarat Energy Transmission
Corporation Limited. Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by
the beneficiary directly.
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs._____________. (Rupees _________________________________ only). Our guarantee
shall remain in force until ___________ (Date of validity of the Guarantee). Unless demands or claims
under this Bank Guarantee are made to us in writing on or before ___________ (Date of validity of the
Bank Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be
released and discharged from all liabilities there under:
Please Mention here Complete Postal Address of the Signature of the Bank’s Authorized Signatory with
Bank with Branch Code, Telephone and Fax Nos. Official Round Seal
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
NAME OF DESIGNATED BANKS:
Note: The banks shall be the Banks recognized / notified by the Finance Department,
of Gujarat (GoG) from time to time
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. Bank Guarantee number and date to be written on every page of Bank Guarantee & its
2. If B/G amount is more than Rs. 50,000/-, kindly take sign of Two Bank Officer with their
respective Employee Code No.
3. Valid confirmation letter of the concerned Bank in an approved format should be attached with
every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be
beyond six months, in any case.
5. Round seal and signature of two Bank Officers with name & sign code should be affixed on
every B/G paper.
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S EXPERIENCE
A List of Similar jobs executed by the Contractor &Name with address of a Person whom
reference can be made, by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr. Description Value Construction Actual Date Client Persons Principal
No of Work Of Work Period Constructio Of to Features
Executed as per n Completion whom
Rs. Contract Period Reference
Completion made
Contractor’s Representative legible signature: ______________________
Seal of the company
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Gujarat Energy Transmission Corporation Ltd.
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender
[Tenderers shall submit the information in the
Format detailed here under]
Sr. Name of work Work in hand Work Tender for Remarks
No with location
Tender Cost of Anticipat Estimate Dat Stipulate
Cost Remaini ed d e d
ng Date of Cost whe Date or
work Completi n period
Contractor’s Representative legible signature: ______________________
Seal of the company Date & place:
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description & Details Name Qualification Professional Remarks
No. of position Experience
works carried out
Contractor’s Representative legible signature: ______________________
Seal of the company
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Details machinery Capacity Numbers Make Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Gujarat Energy Transmission Corporation Ltd.
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE
QUOTING THE TENDER.
[Tenderers shall submit in the Format detailed here under]
Sr. Name of firm Name of Authorized Qualification Designation Remarks.
No. representative of firm who has / post
visited the site. holding in
Contractor’s Representative legible signature: ______________________
Seal of the company
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration Class – with valid up to
3 Partnership deed/Proprietor (Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, Statement of last three
6 Latest Solvency certificate. Rs. Lacs issued by Bank, branch dtd.
7 GST Registration No.
9 Experience certificate – form 3A of last
years (minimum value of similar work done
should be equal to or more than 50% of
Signature of Tenderer Company’s Round Seal
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Contractor must fill up below details
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
1 PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2 PENALTY TERMS AGREED
(Please Specify YES / NO.)
3 SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4 TERMS AGREED:
(Please Specify YES / NO.)
5 VALIDITY Of the offer for 180 DAYS From the date of opening of
the Technical Bid: AGREED:
(Please Specify YES / NO.)
6 PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7 MOBILE NOS., TELEPHONE NOS. & FAX NO:
8 Authorized person of the firm:
9 Name of the proprietor, partners, directors [as the case may be],
along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
(On the letter pad of the company)
Details of the Firm
Name of the Firm
1 Address of registered office
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
1 Address of WORK
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
Signature of Tenderer Company’s Round Seal
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
Name of work: Soil Investigation for 66kV Nadabet-Jaloya line locations Under Palanpur Circle
SR DESCRIPTION Qty Unit Rate Amount
1 Mobilization of Rig and required
equipment for carrying out Geo Technical
investigation in Creek Area/ Marshy land
in Nadabet creek area in any type of soil
and rock including drilling 150mm dia and
35 Rmt deep bore hole by arranging
pontoons/floating platforms/ Boats or what
so ever method, collecting sample of
disturbed and undisturbed Soil conducting
SPT and performing test in laboratory
necessary arrangements of safe bearing
capacity including test of tri axial shear
test, direct shear test, liquid limit, plastic
limit, plasticity index, grain size
distribution, water test, chemical test,
noting all reading dates figures plotting
relevant graphs, curves and sketches for
arriving at conclusions, interpreting the
various plots and preparing reports as per
relevant IS codes and submitting soft
copy and 3 sets of hard copies of report
with clear figures of safe bearing capacity
including cost of all labour tools, plants
etc complete as directed by EIC Moreover
Effect of scour should be considered in
the analysis. Pile lateral capacity for the
all the diameter and depth shall be
Net Total Amount Rs.
Net Total Amount Rs.
Net Total Amount Rs.
Net Total Amount Rs.
1 The quoted rates shall be deemed to include all labour, materials, consumables, equipment,
tools and tackles, transportation, loading, unloading, setting up and shifting of machinery,
water, electricity, sampling, preservation and transportation of samples, laboratory testing,
chemical analysis, engineering analyses, preparation and submission of reports, photography,
videography and all incidental works required for satisfactory completion of geotechnical
investigations in accordance with the Technical Specifications and relevant Indian Standards.
2 In case of discrepancy between the Schedule of Quantities and the Technical Specification, the
provisions of the Technical Specification shall prevail.
3 All investigations, testing, analyses and reporting shall be carried out in accordance with the
Gujarat Energy Transmission Corporation Ltd.
Transmission Circle office, Palanpur-385001.
Near Circuit House, Palanpur –
E-Mail: [email protected]
(Regd. Office: Sardar Patel Vidyut Bhavan, Race Course, Vadodara-390 007)
(CIN: U40100GJ1999SGC036018)
Technical Specifications, relevant Indian Standards and as directed by the Engineer-in-Charge.
4 Payment for extra depth beyond the specified depth, wherever provided in the Schedule of
Quantities, shall be made only on actual quantities executed and certified by the Engineer-in-
5 The classification of strata as soil, soft rock and hard rock shall be based on the bore logs and
geological conditions encountered during drilling as per required test and the decision of the
Engineer-in-Charge in this regard shall be final and binding.
6 The rates quoted shall include collection, preservation and transportation of disturbed and
undisturbed samples, groundwater samples and representative rock core samples, wherever
7 The rates quoted shall include submission of detailed Geotechnical Investigation Reports along
with hard copies and soft copies, duly incorporating field observations, laboratory test results,
engineering analyses and recommendations.
8 Geo-tagged photographs and videography of investigation activities shall be submitted along with
the Geotechnical Investigation Report as specified in the Technical Specifications.
9 Borehole coordinates and other relevant site details shall be furnished in the Geotechnical
Investigation Report. KMZ files shall also be submitted wherever required for transmission line
investigations.
10 Backfilling and restoration of boreholes and trial pits after completion of investigations shall be
deemed to be included in the quoted rates.
11 No extra payment shall be made for casing, bentonite, drilling mud, chiselling, flushing,
dewatering, water loss, caving of boreholes, repeated Standard Penetration Tests, obstruction
due to boulders or any other incidental difficulties encountered during execution of the work.
12 The quantities shown in the Schedule of Quantities are tentative and may vary depending upon
site conditions and requirements. Payment shall be made on actual quantities executed and
accepted by the Engineer-in-Charge.
13 Any additional investigations considered necessary during the course of work for proper
interpretation of subsurface conditions shall be carried out as directed by the Engineer-in-Charge
and paid under the relevant items of the Schedule of Quantities.
14 The decision of the Engineer-in-Charge regarding the classification of strata, acceptance of test
results and measurements shall be final and binding on the contractor.
SUPERINTENDING ENGINEER
CIRCLE OFFICE, GETCO, PALANPUR.
I/We have read and clearly understood the terms, conditions, Schedule ‘B’ and Technical
specifications put by GETCO on WEB site.
I/We hereby accept all the conditions and specifications of this tender document, and
I/We am/are willing to carry out the work at _________________% (in words
______________percentage) above / below the estimated cost. Accordingly the total amount of
______________percentage) above / below the estimated cost. Accordingly the total amount of
my/our tender works out to Rs.____________________ (Rupees__________________
Signature of contractor with seal
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender-SBC for Nadabet line locations.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .