Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹4.1 L+₹15,361 (3.88%)Rejected-AOC | L2 | Rejected-AOC l2 |
Tender Value
₹3.8 L
EMD Value
₹9,442
Closing Date
28 Jan 2025, 6:00 pmClosed
AJITH ANTO P
O/o Office of the Assistant Executive Engineer, Electrical Irrigation Sub Division Chalakudy
GENERAL-AMC -2024-25 Kaduvakuzhi 1st, Moochipparatha and Kaduvakuzhi 2nd stage LI Schemes -Malappuram Dt-Fully Comprehensive Annual Maintenance contract General Electrical Work-retender
2025_Irrig_722571_26
C-ETN-JAN/EL/24-25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
MALAPPURAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹835
₹9,442
22 Apr 2025
20 Jan 2025
30 Jan 2025
20 Jan 2025
28 Jan 2025
20 Jan 2025
Amount
Kaduvakuzhi 1st stage LIS
OD135669/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD135670/2024-2025:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD135671/2024-2025:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD135667/2024-2025:Lifting the 16HP to 60 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
OD135668/2024-2025:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
OD135672/2024-2025:Lifting the MCCB above 250A to 630 A after disconnecting the wire connection, detaching from the Panel board and placing them conveniently to a safe place
OD135628/2024-2025:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD135627/2024-2025: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD135629/2024-2025:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207588/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207589/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD207592/2024-2025: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD167121/2024-2025:Replacing old bearing and supply new bearing bearing no NU314 SKF/FAG OR equivalent
OD167124/2024-2025:Replacing old bearing and supply new bearing bearing no 6311SKF/FAG OR equivalent
Moochipparatha LIS
OD135698/2024-2025:Lifting the 16HP to 60 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
OD135699/2024-2025:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
OD135700/2024-2025:Lifting the MCCB above 250A to 630 A after disconnecting the wire connection, detaching from the Panel board and placing them conveniently to a safe place
OD135678/2024-2025:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD207600/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD135688/2024-2025:Refitting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD135689/2024-2025:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207603/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207604/2024-2025: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD167129/2024-2025:Replacing old bearing and supply new bearing bearing no 6309SKF/FAG OR equivalent
Kaduvakuzhi 2nd stage LIS
OD135754/2024-2025:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD135752/2024-2025:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
OD135761/2024-2025:Lifting the 61HP to 125 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
OD135707/2024-2025:Dismantling the 61-110 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD207627/2024-2025:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling,including scrapping, cleaning and painting with enamel paint.
OD207634/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC)all time during the period of contract and the faults should be rectified with in the time allowed
OD207635/2024-2025:Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc including attending all repairs ,replacing of damaged coupling bush, carbon brush and coupling bolts, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etcand starter AMC) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD207636/2024-2025: Fully Comprehensive Annual Maintenance contract of above 61-110 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required ( excluding motor rewinding , works arrived due to natural and man made disaster like flood, landslide etcand starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD135718/2024-2025:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD167208/2024-2025:Replacing old bearing and supply new bearing bearing no 6314 SKF/FAG OR equivalent
OD207655/2024-2025:Replacing old bearing and supply new bearing bearing no NU312 SKF/FAG OR equivalent
OD167210/2024-2025:Replacing old bearing and supply new bearing bearing no 6309SKF/FAG OR equivalent
OD159269/2024-2025: Supply & renewal of bearing No. 7312 BECBP
OD161909/2024-2025:Supply and fixing the coupling tyre in the existing coupling pulley set
OD161913/2024-2025:Replacing the existing brush holder with new one
OD161922/2024-2025:Supply and fixing Nut and Bolt suitable for Motor foundation of 60-100HP ratings
OD167203/2024-2025:Supply, and filling of good quality LT grade transformer oil
OD161956/2024-2025:Replacing the slip ring unit of induction motor pump set up to 90 HP with new one
OD161964/2024-2025:Replacing the existing coupling pully set of the 90HP motor pump set with new set including supply of suitable pully set,necessary industrial works and correcting the alignment of the motor pump set
OD164000/2024-2025:Lowering down and erecting 61-110 HP pump and erecting the pump on the base plate coupling with motor, etc in position, checking correct alignment and trial run on full load
OD164001/2024-2025:Lifting the 61-110 HP pump after disconnecting from the motor, decoupling the pump, detaching from the base plate, etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
SAJEESH P (BID ID -2077274)
Bidder Name
AJITHKUMAR S.
SAJEESH P
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1159189.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .