Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | ₹16.9 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹16.9 L+₹843.21 (0.05%)Rejected-AOC | ₹16.9 L+₹843.21 (0.05%) | L2 | Rejected-AOC Highest Rate |
Tender Value
₹19.9 L
EMD Value
₹40,000
Closing Date
25 May 2026, 12:00 pmClosed
E.E. R.E.D. Division Azamgarh
R.E.D. Department Viakas Bhawan Azamgarh
CC road from the CC road east of the canal culvert to Jhinku Yadav house in Sethwal Pandahan village panchayat of Rani ki Sarai development block-2
2026_REDUP_1149697_1
3/RED/Azh/2026-27 Dt 02.04.2026
Open Tender
Civil Works
Fixed-rate
90 days
Azamgarh
Please Refer Tender Document
3 documents required · 3 mandatory
₹1,194
₹40,000
22 Jul 2026
18 May 2026
25 May 2026
18 May 2026
25 May 2026
18 May 2026
18 May 2026 - 25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. As per SI no-251.Schedule Rate | 68.5 | CuM | 104.5 | ₹7,158.25 |
| 2 | Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-273 | 18.09 | CuM | 2,992.5 | ₹54,134.33 |
| 3 | First class b/w in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of work. Asper morth anlysis 600&1200 | 47.95 | CuM | 6,490.4 | ₹3,11,214.68 |
| 4 | Providing, Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification (G-3) including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 8.10 tonnes in stages to proper grade and camber applying and brooming requisite type of screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per clause 405A | 57.15 | CuM | 3,740.05 | ₹2,13,743.86 |
| 5 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, | 135 | CuM | 7,957.2 | ₹10,74,222 |
| 6 | 12mm thick cement plaster in 1:4 cement and sand moltar including supply of all material, labour and T&P, etc. required for proper completion of work as per SI no- 584 A. Schedule Rate for Fine sand | 20.91 | SqM | 137.75 | ₹2,880.35 |
| 7 | Construction joint(depth of cc slab):making and filling with construction ( with bitumin 40%,asbestus 5% and coarse sand 55%.). | 297 | R/M | 35.62 | ₹10,579.14 |
| 8 | Supply and Laying of 125 micron Polythene in between lean concrete and c.c slab. | 762 | SqM | 14.25 | ₹10,858.5 |
| 9 | Supply and fixing of 20mm granite stone sign board including all for proper completion of the work | 0.27 | SqM | 2,145.1 | ₹579.18 |
| 10 | Lettring and painting of stone sign board including all compleat work | 74 | WORD | 14.25 | ₹1,054.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
T1.pdf
Tender Documents • 1.48 MB
BOQ_2152408.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .