Loading…
Loading…
Tender Value
₹8.1 L
EMD Value
₹9,000
Closing Date
8 Apr 2026, 5:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Deputy Executive Engineer, Irrigation Sub Division,Una
Cleaning of Sub minors canals of left And right bank canal network of Machhundri irrigation Scheme.
291407
Tender Notice No-5 2025-26
Open
Civil - All
Gir Somnath
6 documents required · 6 mandatory
₹900
Executive Engineer, Gir Somnath Irrigation Division,Veraval
₹9,000
30 Mar 2026
30 Mar 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Clearing the canal by 105.77 Km. 7692.00
cleaning/removing the thick weed,
shrubs and all other vegetations
including silt up to 10 cm thickness,
stones, debris etc from canal bed and
side slope of canal up to outer toe of
canal bank and disposing as directed.
(a) For canal capacity up to
I/We am/are willing to carry out the work at… % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 10 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer,
Irrigation Sub Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Cle.LB And RB Machhundri Tender.pdf
1.BOQ.pdf
1.Tender Notice No 5 of 2025-26.pdf
Download all tender documents and submit your bid