Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.0 LAccepted-AOC 14 4A KALI PRASAD C HAKRABORTY ST CAL KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹89.2 L+₹5.3 L (6.30%)Rejected-AOC 106 1 RAJA RAMMOHAN SARANI KOLKATA 700 009 | KOLKATA | WEST BENGAL | 700009 | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹89.7 L+₹5.8 L (6.92%)Rejected-AOC | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹90.9 L+₹7.0 L (8.34%)Rejected-AOC 179 143 1 INDA NEAR SHAKTI BHAVAN KHARAGPUR 721305 | MEDINIPUR WEST | WEST BENGAL | 721305 | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹91.5 L+₹7.6 L (9.06%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M P KHAITAN L8 | M/S H.P Singha L2 | BHASKAR SUPPLY AGENCY L6 | DNS CONSTRUCTION COMPANY L3 | M/S Tapan Sur L7 | STAR ENTERPRISES L4 | ROY CONSTRUCTION L1 | BHAUMIK CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and n exc 50mm deep complete all as specified and directed. | 345 | X Sqm | 550 ₹1,89,750 | 500 ₹1,72,500 | 520 ₹1,79,400 | 485 ₹1,67,325 Lowest | 550 ₹1,89,750 | 550 ₹1,89,750 | 500 ₹1,72,500 | 511 ₹1,76,295 |
| 2.00 | M&L for laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant, material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass spreading with sensor paver and rolling with vibratory roller of capacity 80-100KN static weigth and consolidating to required gradient and camber complete all as specified and directed. The finished surface tolerances to be as per Table 900-1 of MORTH specifications for road and bridge works 2013 complete all as specified and as directed. | 95 | X Sqm | 6,900 ₹6,55,500 | 6,800 ₹6,46,000 | 6,850 ₹6,50,750 | 7,050 ₹6,69,750 | 6,850 ₹6,50,750 | 6,820 ₹6,47,900 | 5,000 ₹4,75,000 Lowest | 6,810 ₹6,46,950 |
| 3.00 | Preparing unsurfaced WMM surfaces by brushing with the wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete all as specified and directed.
Note :
(a) Surfaces shall be cleaned and approved by Engr-in-Charge before applying priming coat of bitumen.
(b) Rates shall include applying Mechancial air compressor to remove dust and sweeping residual. | 95 | X Sqm | 75 ₹7,125 | 70 ₹6,650 | 72 ₹6,840 | 72 ₹6,840 | 90 ₹8,550 | 80 ₹7,600 | 50 ₹4,750 Lowest | 66 ₹6,270 |
| 4.00 | Applying evenly a prime coat of Cationic Bitumen Emulsion (SS-1) conforming to IS: 8887 at a rate of application of 0.7-1 kg/sqm on surface of WMM/WBM as specified in Table 500-3 of MoRTH specification for road and bridge works 2013, using mechanical sprayer after cleaning of existing surfaces complete all as specified and directed.
Note : Rates shall include for applying sample primed surface by using 0.7-1 kgs of emulsion in stretch of 1.00 Sqm of proposed/prepared road surfaces. | 345 | X Sqm | 420 ₹1,44,900 | 400 ₹1,38,000 | 333 ₹1,14,885 | 412 ₹1,42,140 | 430 ₹1,48,350 | 450 ₹1,55,250 | 200 ₹69,000 Lowest | 320 ₹1,10,400 |
| 5.00 | Material and Labour for Premix bituminious macadam laid/rolled and compacted to required gradient and camber (consolidated thickness 40-50 mm) using paving bitumen (VG 30) as binder and graded stone aggregates of 20 to 12.5mm size complete all as specified and directed.
Note :
(a) Binder content shall be 4% of weigth aggregate.
(b) Rate shall include Bitumen Extraction Test as per reqd interval. | 170 | Cum | 8,700 ₹14,79,000 | 8,500 ₹14,45,000 | 8,500 ₹14,45,000 | 8,620 ₹14,65,400 | 8,550 ₹14,53,500 | 8,520 ₹14,48,400 | 7,000 ₹11,90,000 Lowest | 8,200 ₹13,94,000 |
| 6.00 | Preparing blacktop or existing bituminous surfaces by brushing with the wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc.
Note :
(a) Surface shall be cleaned and approved by Engr-in-Charge before applying priming coat of bitumen.
(b) Rates shall include applying Mechanical air compressor to remove dust and sweeping residual. | 345 | X Sqm | 50 ₹17,250 | 45 ₹15,525 | 50 ₹17,250 | 44 ₹15,180 Lowest | 50 ₹17,250 | 55 ₹18,975 | 45 ₹15,525 | 47 ₹16,215 |
| 7.00 | Applying evenly a tack coat of Cationic Bitumen Enulsion (RS-1) conforming to IS:8887 at a rate of application of 0.3 kg/sqm on bituminous surface as specified in Table 500-5 of Morth specification for road and bridge work 2013, using mechanical sprayer after cleaning of existing surface as specified and directed.
Note : Rates shall include for applying sample primed surface by using 0.3 kgs of emulsion in stretch of 1.00 Sqm of proposed/prepared road surfaces. | 345 | X Sqm | 420 ₹1,44,900 | 400 ₹1,38,000 | 332 ₹1,14,540 | 395 ₹1,36,275 | 450 ₹1,55,250 | 420 ₹1,44,900 | 300 ₹1,03,500 Lowest | 320 ₹1,10,400 |
| 8.00 | Material & Labour for laying 40 mm (consolidated thickness) Bituminous premix semi-dense asphaltic concrete with 5.5% binder content by weight of total mix, rolled and compacted to requried camber and gradient complete.
Note :
(a) Rate shall include cost of design mix to be obtained from approved lab.
(b) Rate quoted shall include cost of bitumen extraction test of mix at reqd/specified interval
(c) SDAC shall be laid on the same day over frequently laying BM surface. | 690 | X Sqm | 6,950 ₹47,95,500 | 6,700 ₹46,23,000 | 6,800 ₹46,92,000 | 6,700 ₹46,23,000 | 6,850 ₹47,26,500 | 6,820 ₹47,05,800 | 6,500 ₹44,85,000 Lowest | 6,850 ₹47,26,500 |
| 9.00 | Material & labour for preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc and the like n.exc 10cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour confiring to BS 3262-1989 with special applicatore machine all as manufacturers instruction complete all as specified and directed. | 3,400 | RM | 505 ₹17,17,000 | 450 ₹15,30,000 Lowest | 522 ₹17,74,800 | 452 ₹15,36,800 | 500 ₹17,00,000 | 460 ₹15,64,000 | 500 ₹17,00,000 | 524 ₹17,81,600 |
| 10.00 | Supply and fixing for cat eye solar reflective type of metal body alloy of size 100mm x 100mm x 20mm with PAMA striplens reflector of model No DA 972.0 fixed with and incl MS Stud of suitable size as per manufactures instructions complete all as specified and directed. | 593 | Each | 370 ₹2,19,410 | 350 ₹2,07,550 | 350 ₹2,07,550 | 356 ₹2,11,108 | 400 ₹2,37,200 | 355 ₹2,10,515 | 300 ₹1,77,900 Lowest | 312 ₹1,85,016 |
Tender Value
₹78 L
EMD Value
₹1.4 L
Closing Date
3 Jul 2025, 6:00 pmClosed
CWE (S) Barrackpore
Office of the HQ CWE (S) Barrackpore, Pin - 700120
REPAIRS RE-CARPETING INCL MAINT OF WALKWAY, REPLACEMENT OF ROAD FURNITURES, RE-PAINTING OF ROAD MARKING, ETC IN CERTAIN INTERNAL LOCATIONS AT MIL STN KANCHRAPARA UNDER GE BARRACKPORE
2025_MES_713422_1
CWE/BKP/01 OF 2025-2026
Open Tender
Civil Works
Item Rate
180 days
Barrackpore
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
GE BARRACKPORE
₹1.4 L
Yes
5 Sept 2025
13 Jun 2025
10 Jul 2025
13 Jun 2025
3 Jul 2025
26 Jun 2025
Amount
Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and n exc 50mm deep complete all as specified and directed.
M&L for laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant, material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass spreading with sensor paver and rolling with vibratory roller of capacity 80-100KN static weigth and consolidating to required gradient and camber complete all as specified and directed. The finished surface tolerances to be as per Table 900-1 of MORTH specifications for road and bridge works 2013 complete all as specified and as directed.
Preparing unsurfaced WMM surfaces by brushing with the wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete all as specified and directed. Note : (a) Surfaces shall be cleaned and approved by Engr-in-Charge before applying priming coat of bitumen. (b) Rates shall include applying Mechancial air compressor to remove dust and sweeping residual.
Applying evenly a prime coat of Cationic Bitumen Emulsion (SS-1) conforming to IS: 8887 at a rate of application of 0.7-1 kg/sqm on surface of WMM/WBM as specified in Table 500-3 of MoRTH specification for road and bridge works 2013, using mechanical sprayer after cleaning of existing surfaces complete all as specified and directed. Note : Rates shall include for applying sample primed surface by using 0.7-1 kgs of emulsion in stretch of 1.00 Sqm of proposed/prepared road surfaces.
Material and Labour for Premix bituminious macadam laid/rolled and compacted to required gradient and camber (consolidated thickness 40-50 mm) using paving bitumen (VG 30) as binder and graded stone aggregates of 20 to 12.5mm size complete all as specified and directed. Note : (a) Binder content shall be 4% of weigth aggregate. (b) Rate shall include Bitumen Extraction Test as per reqd interval.
Preparing blacktop or existing bituminous surfaces by brushing with the wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. Note : (a) Surface shall be cleaned and approved by Engr-in-Charge before applying priming coat of bitumen. (b) Rates shall include applying Mechanical air compressor to remove dust and sweeping residual.
Applying evenly a tack coat of Cationic Bitumen Enulsion (RS-1) conforming to IS:8887 at a rate of application of 0.3 kg/sqm on bituminous surface as specified in Table 500-5 of Morth specification for road and bridge work 2013, using mechanical sprayer after cleaning of existing surface as specified and directed. Note : Rates shall include for applying sample primed surface by using 0.3 kgs of emulsion in stretch of 1.00 Sqm of proposed/prepared road surfaces.
Material & Labour for laying 40 mm (consolidated thickness) Bituminous premix semi-dense asphaltic concrete with 5.5% binder content by weight of total mix, rolled and compacted to requried camber and gradient complete. Note : (a) Rate shall include cost of design mix to be obtained from approved lab. (b) Rate quoted shall include cost of bitumen extraction test of mix at reqd/specified interval (c) SDAC shall be laid on the same day over frequently laying BM surface.
Material & labour for preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc and the like n.exc 10cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour confiring to BS 3262-1989 with special applicatore machine all as manufacturers instruction complete all as specified and directed.
Supply and fixing for cat eye solar reflective type of metal body alloy of size 100mm x 100mm x 20mm with PAMA striplens reflector of model No DA 972.0 fixed with and incl MS Stud of suitable size as per manufactures instructions complete all as specified and directed.
M/S H.P Singha (BID ID -3344903)
DNS CONSTRUCTION COMPANY (BID ID -3345501)
STAR ENTERPRISES (BID ID -3345663)
BHAUMIK CONSTRUCTION (BID ID -3344950)
BHASKAR SUPPLY AGENCY (BID ID -3345040)
M/S Tapan Sur (BID ID -3345611)
M P KHAITAN (BID ID -3344417)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .