| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Rejected-Technical | Rejected-Technical Non- Responsive |
| 4 | Rejected-Technical | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | Rejected-Technical Non-Responsive |
Tender Value
₹32.8 L
EMD Value
₹65,700
Closing Date
7 Oct 2026, 5:00 pmClosed
Er. B.C. Negi
Executive Engineer, Kullu Division, HP.PWD, Kullu
Construction of Forest Rest House at Village Chatrani, P.O. Dhara, Distt. Kullu(SH- C/o Building Portion, WS and SI, Septic Tank and Soak pit etc.
2026_PWD_144894_1
PW/KD/TA/2026-27- 8214-21 Dated- 29.09.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Kullu
As refer to bid document
9 documents required · 9 mandatory
₹2,000
₹65,700
17 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) manual mean foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto any lead including getting out the excavated soil and disposal of surplus excavated soil as directed, all kind of soil. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government, but excluding GST with-in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 61.07 | Per Cubic Metre | 291.3 | ₹17,789.69 |
| 2 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, upto any depth, including getting out the excavated soil, and then returning the soil as required, in layers any depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus :Pipes, cables etc. exceeding 80 mm (Eighty millimetre) dia. but not exceeding 300 mm (Three hundred millimetre) dia. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government, but excluding GST with-in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 13.8 | Per Running Metre | 299.1 | ₹4,127.58 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of formwork The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government, but excluding GST with-in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. for : (i) Foundations, footings, bases of columns, etc. for mass concrete | 1.51 | Per Square Metre | 263.8 | ₹398.34 |
| 4 | (ii) Suspended floors, roofs, landings, balconies and access platform | 41 | Per Square Metre | 594.95 | ₹24,392.95 |
| 5 | (iii) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 71.4 | Per Square Metre | 479.05 | ₹34,204.17 |
| 6 | (iv) Edges of slabs and breaks in floors and walls in any width. | 40.17 | Per Running Metre | 219.9 | ₹8,833.38 |
| 7 | (v) Stairs, (excluding landings) except spiral stair cases. | 7.89 | Per Square Metre | 721.35 | ₹5,691.45 |
| 8 | (vi) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 4.56 | Per Square Metre | 516.65 | ₹2,355.92 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (one cement :five coarse sand: ten graded stone aggregate) 40 mm nominal size (fourty millimetre) . The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government, but excluding GST with-in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 3.4 | Per Cubic Metre | 5,888.5 | ₹20,020.9 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (one cement : four coarse sand: eight graded stone aggregate) 40 mm (forty millimetre) nomonal size. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government, but excluding GST with-in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 3.98 | Per Cubic Metre | 6,209.3 | ₹24,713.01 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.41 MB
sbd.pdf
Tender Documents • 2.74 MB
BOQ_215603.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .