| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.0 LAccepted-AOC WARD NO 04 SUNHARI KICHHA U S NAGAR | CHAMOLI | UTTARAKHAND | 246401 | ₹25.0 L | L-1 | Accepted-AOC Work Awarded |
| 2 | L-2₹25.0 LRejected-Finance NEAR EAST WEST PUBLIC SCHOOL SHAHABAD GATE RAMPUR U P | ₹25.0 L | L-2 | Rejected-Finance Rejected due to higher rate |
| 3 | Not Admitted-Fee/PreQual/Technical WARD NO 4 SUNHERI KICHHA RUDRAPUR | - | - | Not Admitted-Fee/PreQual/Technical Others-Tender cost DD, EMD and bid validity not matched. |
| Sl No | Description | Qty | Unit | MANRAJ ELECTRICAL & INFRASTRUCTURE L1 | TNK Electricals L2 |
|---|---|---|---|---|---|
| 1.00Annexure-A (LABOUR CHARGES) | |||||
| 1.01 | Manual digging of trench of size 300x100 mm (WxH)including laying of HDPE Pipe and Backfilling of the earth as per direction of Engineer in Charge. | 500 | Mtr | 699 ₹3.5 L | 700 ₹3.5 L |
| 1.02 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. | 24 | CBM | 240 ₹5,760 | 239 ₹5,736 |
| 1.03 | Erection of SP-33 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. | 12 | Nos | 1,049 ₹12,588 | 1,050 ₹12,600 |
| 1.04 | Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. | 12 | Nos | 1,299 ₹15,588 | 1,300 ₹15,600 |
| 1.05 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ration 1:4:8(1 cement:4 graded stone20 mm niminal size: 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, levelling as per RESPO cnstruction manual. | 8.91 | CBM | 5,124 ₹45,654.84 | 5,125 ₹45,663.75 |
| 1.06 | Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc. | 24 | Nos | 599 ₹14,376 | 600 ₹14,400 |
| 1.07 | Painting of SP-33 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. from ground level. | 12 | Nos | 1,075 ₹12,900 | 1,074 ₹12,888 |
| 1.08 | Painting of SP-55 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. from ground level. | 12 | Nos | 1,250 ₹15,000 | 1,250 ₹15,000 |
| 1.09 | Laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming & repairing of road including cost of cement sand and stone blast. | 2,100 | Mtr | 710 ₹14.9 L | 710 ₹14.9 L |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
17 Nov 2025, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Laying 11 KV XLPE Cable in some place in under construction 4 Nos. 11 KV Feeders from new 33/11 KV S/s Kuraiya under EDD Kichha
2025_UPCL3_88512_1
EDC(USN)39/2025-26
Open Tender
Electrical Works
90 days
Lalpur
Pl. refer tender documents
4 documents required · 4 mandatory
₹1,180
EE ETD Rudrapur
₹75,000
12 Jan 2026
31 Oct 2025
18 Nov 2025
31 Oct 2025
17 Nov 2025
1 Nov 2025
Amount
Annexure-A (LABOUR CHARGES)
Manual digging of trench of size 300x100 mm (WxH)including laying of HDPE Pipe and Backfilling of the earth as per direction of Engineer in Charge.
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work.
Erection of SP-33 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual.
Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual.
Grouting of pole in size 0.45x0.45x1/9 of the support in CC ration 1:4:8(1 cement:4 graded stone20 mm niminal size: 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, levelling as per RESPO cnstruction manual.
Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc.
Painting of SP-33 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. from ground level.
Painting of SP-55 pole with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. from ground level.
Laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming & repairing of road including cost of cement sand and stone blast.
T-off Connection Complete 11 KV line as per Direction of Engineer in Charge.
Jointing and fixing of cable jointing kit indoor/ outdoor 11 KV XLPE heat shrinkable cable boxes.
Cartage of ST pole SP-33 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km)
Headload cartage of SP-33 Pole from road to site(distance 0-1 Km)
Headload cartage of SP-55 Pole from road to site(distance 0-1 Km)
Head load cartage of small material (distance 0-1 Km)
Digging of Pit through Hammer at CC, DAMAR Road.
Annexure-B (SUPPLY ITEMS)(As per UPCL Norms)
Supply of M.S. Nut & Bolt off size
Supply of Holding Clamp for SP-33 without N/B
Supply of Holding Clamp for SP-55 with N/B
Supply of Stay Clamp off size.
Supply of Hume Pipe (8 Inch dia & 2 M Long) in 2 Part.
TNK Electricals (BID ID -405952)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
TN392526tenderdocumentskuraiyaug.pdf
Tender Documents • 1.50 MB
Generalinstruction392526.pdf
Other Document • 0.79 MB
FormAandB.pdf
Other Document • 0.67 MB
BOQ_105014.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid